Laserfiche WebLink
x r <br /> TASK 3 & 4: FIELD INSPECTION AND DESCRIPTION OF DRAINAGE SYSTEM WITH <br /> EXISTING AND PREDICTED PROBLEMS <br /> A Level 1 drainage analysis and "Off Site Analysis and Mitigation Study"meeting requirements outlined <br /> in Volume 1, Section 3.1.3 of the 2014 DOE SWWM Manual was performed. See Downstream <br /> Analysis Map. <br /> WEST SUB-BASIN <br /> Level 1 Downstream Drainage Analysis: <br /> Section 1: Upstream Drainage Analysis: <br /> Based on the site contours there is no upstream runoff draining onto the site. <br /> A review of the upstream area indicated that there were no indications of problems observed. <br /> Section 2: On-site Drainage Considerations: <br /> All runoff from the site discharges along the west side of the site draining onto the adjacent property <br /> Section 3: Site to Sievers Deucy Blvd to 60th Street SW <br /> The runoff from the site leaves the property along the west side draining onto the adjacent property. It <br /> then turns north flowing through an industrial vacant property and appears to flow under Sievers Deucy <br /> Blvd and through a gravel operation for a total distance of over 6,000 sf. <br /> There appeared to be no issues with the downstream drainage system or culvert. However, nearly the <br /> entire downstream course was on private property and not accessible to inspection. <br /> TASK 5: LEVEL 1 MITIGATION OF EXISTING PROBLEMS <br /> The project proposes to mitigate the proposed site improvements through the use of LID measures <br /> including Splash Blocks requiring minimum of 50-ft flow paths through vegetation and driveway <br /> dispersal trenches. <br /> Conclusions: <br /> Based on the proposed mitigation and lack of problems noted downstream,the site development should <br /> have little if any impact on west side downstream conditions. <br /> 7030 Lower Ridge RD Full Drainage Report <br /> Revised:November 3,2017 Page 5 <br />