Laserfiche WebLink
INSPECTION REPORT <br /> .4, l <br /> Date 21 i�lJ Permit: In I l <br /> Contractor: v 1 <br /> / -52A ✓IAC <br /> Owner: o 0 u, Y 1+0 ia I 14.01c <br /> Site Address:1 'N., � Afdei <br /> 6 O . <br /> TYPE OF INSPECTION REQUESTED <br /> LECTRICAL BUILDING MECHANICAL PLUMBING <br /> Temp Service ❑UFER ground ❑Groundwork/Slab ill Groundwork/Slab <br /> Groundwork El Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑ eiling Grid [I]Drywall Nailing ❑Plumbing Final <br /> 04.ctrical Final ❑Shear Nailing GAS PIPE <br /> WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> H Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> Hi Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OT-ER OR CONSULTATION: <br /> 1-;, A'PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS E IT <br /> fi OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> V OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> C)t,-- .r-li=eaf-- rj\---C___. <br /> CaL.,_)tz qc)L.-1--S- <br /> Inspector: it(--ZZ . <br /> Date: 17/14/7 <br /> EIR(10/06) DATABAR,INC. <br />