|
FIELD REPORT DER 064
<br /> GEO Date: 7/28/201 7
<br /> z PHOTO LOG 4 of 5
<br /> DESIGN
<br /> l
<br /> may" #',.. �`
<br /> x
<br /> v
<br /> « _ _
<br /> ° ur, , ` te,
<br /> baa
<br /> . ,3 F A&� 43.a - - . ,�'wi:.t.�.i a °kms.'---,„„,s,-,, -,--,-,-..--,,,,--4,,,„, '
<br /> ,.��a..x.lue,.. a. _2'x"`2.....45
<br /> Comments: Lot 220 Exposed foundation subgrade for Comments: Lot 221 Exposed foundation subgrade for
<br /> lot area lot area
<br /> i •
<br /> .%•
<br /> is
<br /> a
<br /> ,SA,
<br /> •
<br /> fr:\41 . ,,,,1'4':i.,,-, _, ,.'
<br /> f
<br /> � �a3�
<br /> tea �'� . x
<br /> � X"
<br /> 4, % -,....,41,, ,k',4
<br /> Comments: Lot 222- Exposed foundation subgrade for Comments: Lot 223-Exposed foundation subgrade for
<br /> lot area lot area
<br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services. We rely on the
<br /> contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does
<br /> not include supervision or direction of the contractor,the contractor's employees or agents. Our firm is not responsible for site safety. This field report is a
<br /> DRAFT representation of our field observations,testing,and preliminary recommendations. The report can only be considered final upon review of the
<br /> Geooesign project manager,as indicated by initials in the"Reviewed By"section.
<br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 981 33 I 206.838.9900
<br /> ter— __
<br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 1
<br />
|