• <br /> 4450d4 14'-Fipn'E'- es1V4 FIELD REPO* <br /> c.22: <br /> 2 <br /> Project Name: Everett River Front-Simpson Report: 077 <br /> GeoDesign#: Polygon-127-03 Date: 10/24/2017 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Clear, 60's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1530/1630 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Ben Weinberg, EIT <br /> m Site Plan(s) 0 Density Test Summary Signature: 07:-- <br /> Attachments: 0 Installation Records 0 Other <br /> Reviewed By:4X�,--,t,,u...� <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg, was on-site part time at the request of Craig with DDS to <br /> observe foundation subgrade for Lots 206, 218, and 219. <br /> SUMMARY OF OBSERVATIONS: <br /> LOT 206: <br /> Today, GeoDesign noted that DDS had completed excavation of the footing and crawl space area for Lot 206. Previously, <br /> GeoDesign noted that BDZ/Northwest Construction removed—4 feet of unsuitable fill material down to firm and unyielding <br /> soil and replaced it with structural fill material. GeoDesign noted that the exposed foundation subgrade consisted of a gray <br /> silty SAND (f-m)with gravel (f-c)which could be probed less than 2 inches using a 1/2 inch diameter soil probe. <br /> It is the opinion of GeoDesign that the exposed foundation subgrade observed today is currently suitable for support of the <br /> intended structure. GeoDesign recommends that any surficially loose and saturated material that may build up under <br /> foundation areas be removed prior to the placement of concrete. <br /> LOT 218: <br /> Previously, GeoDesign noted 1 to.1.5 feet of loose material along the south perimeter foundation area and recommended <br /> that it be removed down to firm and unyielding soil and replaced with structural fill material. Today, GeoDesign noted that <br /> DDS had over-excavated the south perimeter foundation area down to a gray silty SAND with gravel which could be probed <br /> less than 2 inches using a 1/2 inch diameter soil probe. GeoDesign notified the contractor that the area was currently <br /> suitable for the placement of backfill material. It is GeoDesign's understanding that the area will be backfilled with a clean <br /> crushed rock material tomorrow. <br /> LOT 219: <br /> Previously, GeoDesign noted that foundation subgrade material within the north garage area could be be probed 8 to 12 <br /> inches using a 1/2 inch diameter soil probe and recommended that the material be removed down to firm and unyielding <br /> soil and backfilled with structural fill material. Today, GeoDesign noted that DDS had over-excavated that foundation <br /> subgrade area down to firm and unyielding soil and backfilled the area with a clean crushed rock material tamped into a firm <br /> and unyielding mass. <br /> It is the opinion of GeoDesign that the exposed foundation subgrade is currently suitable for support of the intended <br /> structure. GeoDesign recommends that any surficially loose and saturated material that may build up under foundation <br /> areas be removed prior to the placement of concrete. <br /> The client and contractor were notified of our observations and recommendations prior to our departure from the site today. <br /> A summary of our observations can be found in the attached Figure 1. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials In the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />