Laserfiche WebLink
4500 giver-Fvt * <br /> DESIGN FIELD REP RT <br /> 1 of 2 <br /> Project Name: Everett River Front-Simpson Report: 079 <br /> GeoDesign#: Polygon-127-03 Date: 10/30/2017 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> •;:.�Es' k "...' °«lcs' _.,.. .., .,,; :€;t €r'�;c€§§irk` >ra;.a1.�S+A:.:e,`a2` ,�:'�' "s» s „-r` `� a +'nv.: `.F:_. ... •Yi+l '� <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Clear, 50's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 1215/1230 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Ben Weinberg, EIT <br /> Attachments: ElSite Plan(s) 0 Density Test Summary Signature: 4.4 <br /> ❑ Installation Records 0 Other Reviewed By: <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg, was on-site part time at the request of Craig with DDS to <br /> observe foundation subgrade for Lots 217. <br /> SUMMARY OF OBSERVATIONS: <br /> LOT 217: <br /> Previously, GeoDesign noted that Craig with DDS had identified 4 inches to 1.5 feet of unsuitable soil (clearly loose <br /> saturated material) in the south half of the lot area which was removed down to firm and unyielding soil. Today, GeoDesign <br /> noted that DDS had backfilled the over-excavated area with a clean crushed railroad ballast material which had been <br /> tamped into a firm and unyielding mass. <br /> It is the opinion of GeoDesign that the foundation subgrade observed today is currently suitable for support of the intended <br /> structure. GeoDesign recommends that any loose and saturated material be removed from the base of the foundation area <br /> prior to the placement of concrete. <br /> The client and contractor were notified of our observations and recommendations prior to our departure from the site today. <br /> A summary of our observations can be found in the attached Figure 1. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />