Laserfiche WebLink
INSPECTION REPORT <br /> Date r7/ i-In Permit:t\1 V"1„,-0e4.9_ <br /> Contractor: GO`4 <br /> Owner: 0l1CU-•(\ <br /> Site Address: L\`"3.. `V--:\\W`Cc 'Ccj(\'c Ab\\1d <br /> TYPE OF INSPECTION REQUESTED <br /> �eLECTRICAL BUILDING MECHANICAL PLUMBING <br /> j*- `j��Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ce" --.".:1 . -U Drywall Nailing ❑Plumbing Final <br /> -moi-ctrical Fi al A Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ' . drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P=!.-... <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION41111110) <br /> ❑ UNABLE TO PERFORM INSPECTION: - --- <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> i% <br /> Allaa., L , U . <br /> C,1 Pu D <br /> Inspector: Date: (2If/ <br />- EIR(10/06) DATABAR,INC. <br />