Laserfiche WebLink
_ INSPECTION REPORT <br /> _ Date 3 LP Permit: Ito --d l % _ <br /> Contractor: <br /> Owner: --_._© *- <br /> "' <br /> Site Address: J� ktS � <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Gro ding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> Ing Grid ❑Drywall Nailing ❑Plumbing Final <br /> .549 <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas(Pipe Final ❑HWT Final <br /> Lk <br /> OTHER OR CONSULTATION: 2-5C <br /> .--_Vr\ ` <br /> -2.-a- <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> II •K FOR T.C.O. ❑ CORRECTION REQUESTED El <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: _ <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> /1"..-- / <br /> 411/ 3/1( ./t.g <br /> Inspector: Date: <br /> EIR(10/06) DATABAR,INC. <br />