Laserfiche WebLink
INSPECTION REPORT <br /> Date A-'1 Permit: C_,\�QOt-k —1'9 <br /> Contractor: 6�\"\4?.._,\C <br /> Owner: ^QOV� <br /> Site Address: t'V\ % ` N <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ■ -t'• ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ��•l ID i r; b ❑OK to insulate ❑OK to insulate <br /> 0 Service ■ ramp f Rooftop nits ❑❑Water Service <br /> Groundinge., ramp <br /> A� n 1 Final Medical Gas <br /> ❑Ceiling Grid •Dry all Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: rl VJ 1-1,--11,1 <br /> ►ei A PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ 9K FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION El <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: Date: IV —.) / / I <br /> EIR(10/06) DATABAR,INC. <br />