Laserfiche WebLink
• • <br /> 9. Completion of Item #6 above, if not completed with <br /> budgeted $25,000. <br /> 10. Sidewalk reconstruction on Gedney and Wall in the <br /> following priority: <br /> a. Sidewalk reconstruction on west side of Gedney <br /> (Estimated Cost: $1,350) <br /> b. Sidewalk reconstruction on Wall from Nassau to <br /> Bond <br /> (Estimated Cost: $1,740) <br /> 11. Continuation of the $5,000 attic insulation program originally <br /> authorized by the Port Gardner Neighborhood on November 17, 1980 <br /> (On November 17, 1980, the neighborhood allocated an additional <br /> $5,224.49 to the program) . <br /> C. Northeast Everett Neighborhood Improvements: <br /> 1. Curbs, gutters and drainage on NW 140 feet on 17th <br /> Street between Cedar and Pine. <br /> (Estimated Cost: $3,213) <br /> 2. Curbs, gutters, drainage and sidewalk on the west side <br /> of Pine Street between 9th and 10th and a 22 foot <br /> asphalt roadbed along the Pine Street right-of-way <br /> between 9th and 10th. <br /> (Estimated Cost: $54,777) <br /> 3. Repair of Wiggums Hollow Park <br /> (Estimated Cost: $10,000 <br /> 4. Curbs, gutters, drainage and sidewalks on the east and <br /> west sides of the 1300 and 1400 blocks of Maple and an <br /> asphalt overlay of the existing roadbed in the 1300 <br /> and 1400 blocks of Maple. <br /> (Estimated Cost: $72,954) <br /> 5. Sidewalk on the west side of Walnut from 9th to Butler <br /> (Estimated Cost: $4,108) <br /> 6. Sidewalk on the NW 140 feet of 17th Street between <br /> Cedar and Pine <br /> (Estimated Cost: $2,000) <br /> D. Lowell Neighborhood Improvements - (as amended by Lowell residents <br /> October 16, 1980) : <br /> 1. Planning Study of Lowell <br /> (Estimated Cost: $20,000) <br /> 2. Lowell Land Acquisition and Park Improvements <br /> (Estimated Cost: $25,000) <br /> 3. Unbreakable covers for lights in Lowell Park and more <br /> lighting. <br /> (Estimated Cost: $3,000) <br /> 4. Unenclosed shelter with electrical outlets in Lowell <br /> Park <br /> (Estimated Cost: $40,000) <br /> 5. Completion of walkway from Broadway to I-5 overpass on <br /> Lowell Road <br /> (Estimated Cost: $7,625) <br /> 6 <br />