Laserfiche WebLink
TSE Engineering Job#: ?K3 <br /> By: <br /> Page: �1 <br /> 1 <br /> LONGITUDINAL SHEARWALLS Plan Number/Job ID <br /> A222 <br /> G rid B G rid: 1 2 3 4 5 6 7 8 <br /> Level: Upper <br /> Lsw ft. <br /> v wind plf <br /> v seismic plf <br /> USE: <br /> R wind Ibs <br /> R seismic Ibs <br /> Roof Trib. ft. <br /> Roof DL Ibs <br /> Wall DL Ibs <br /> Uplift wind Ibs <br /> Uplift seismic Ibs <br /> USE: <br /> Level: Main <br /> Lsw 2.66 ft. <br /> v wind 769 plf <br /> v seismic' 396 S�' � �sp� � r2�¢9< �F.Oud ��� plf <br /> USE: SW�s <br /> R wind 6921 '" Ibs <br /> R seismic 3564 Z '�a'� �,� s "" Ibs <br /> Roof Trib. � '� ft. <br /> Roof DL 0 Ibs <br /> Wall DL 279 7'1'�� J�' � � j � Ibs <br /> Floor Trib. 13 �� ��x, � �,�, : �',�j�I � 7' J� �. �( ft. <br /> Floor DL 346 � (� ` '���� Ibs <br /> Uplift wind 6733 Ibs <br /> Uplift seismic 3283 Ibs <br /> USE: HDUS <br /> Level: Base <br /> Lsw 8 8 ft. <br /> v wind 265 plf <br /> v seismic 98 plf <br /> USE: SW2 <br /> R wind 3864 Ibs <br /> R seismic 1626 Ibs <br /> Roof Trib. ft. <br /> Roof DL 0 Ibs <br /> Wall DL 760 Ibs <br /> Floor Trib.� 1 ft. <br /> Floor DL 80 Ibs <br /> Uplift wind 3424 Ibs <br /> Uplift seismic 967 Ibs <br /> USE:� STHD14 <br /> Anchor Bolts: ABO <br />