|
VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION
<br /> . ���� ��� _-._. - -_ L 1
<br /> ti,� "ric��sr� ,�D
<br /> °`� �i�i�'�' fC7
<br /> �' �
<br /> S���fZ Y��LL SG��nUL� ����,Y �,��� �,���
<br /> 1�GR ZOI� IDG s��d� (J� vIAaNf��vTO�d
<br /> C��N�RAL- NOTE�:.
<br /> SEE PLANS TO DETERMINE THE DIFFERENT DE5IGNATORS FOR SHEAR WALL MATERIALS, P�R ���;�`�
<br /> NAILING,ANGHOR BOLTS,P.ND HOL(70WN5. LOGATE HOLDOWNS A5 GL05E A5 P0551BLE TO THE END
<br /> OF THE DE516NATED WALL. ��PLP�N �/
<br /> ALL HOI_DOWNS,ANGHOR BOLTS,WASHERS, d NAILS IN GONTAGT WITH P.T. WOOD TO BE � � NAIL SHEATHING TO �� � �
<br /> HOT DIPPED GALVANIZED�` � HEADER � 3�� O.G. E.W. �/ � �
<br /> PI = ONE SIDE PLYWOOD
<br /> —_ P2= TWO 51DE5 PLYWOOD MIN. 3°X ��.2rJ° N�T . , �� C � �
<br /> ��16' i NAIL 5P�IN6�o� a eTt-r. ,n�s BLK6. 51LL ��t'it�� BASE HEM FIR�2 HEADER, EXTEND TO �l� . . • � • "51MP50N" L5TA24 STRAP, � �
<br /> MARK PLATE sir�ori-ras,� PLATE vnwe END WALLS •� �_• __ � •I BAGK 51DE, EA. EDGE r�^
<br /> PLYWD•�� p��Uj PLP.TES ANGHORS REQ'D. I P.NGIIOR BOLTS ANGHORS NAILING (�/LF) t
<br /> PI-b" 8d b'' 12' b' � 18"O.G. �2x4 I 5/8° � 48" � � 48" ! ENDS (2) Ibd � 10' 240 �I.� � ,I, � �
<br /> — —� - - --` I I I I '�—FAST�N TOP PLATE TO
<br /> PI-4' 8d 4" 12" r 4" I Ib"O.G. � 2x4 � 5/8" � 32" I � 30" d ENDS (2) Ibd � �" 349 I,'I'I' �I�.I HDR. 2 ROWS 16d 51NKER � �
<br /> PI�° ## 8d 3" 12" 3" 14"O.G. 3x4 5/8" � 24" � 24" d ENDS �2J Ibd �5" 450 W.I I Iu NAILS � 3�� O.G. � �
<br /> _ _ --�--�-a--_ — _ -- _= --- .�.� �.�.
<br /> PI-2" ** 8d 2" 12" I 2" 12"O.G. 3x4 3/4" � 24° � 18' S END�' � (2) Ibd �5" 585O
<br /> —- -__+--_.... _ __.- -- - _—i---— .
<br /> P2-6" '"'" 8d b" 12" � b" 10"O.G. 3x4 5/8° � 24" WA � (2) Ibd � 5" 480 �I�I �I�I'� (2�2X STUDS
<br /> - —i—__ I � .
<br /> P2-4° ## gd 4" 12" 4" 8"O,G. 3x4 3/4" � 20' i N/A (3J Ibd � 5" 700 .ly� I,}; EAGH EDGE
<br /> --_— — � =
<br /> P2-3" "* 8d 3" 12" 3" 1 8" O.G. 3x4 3/4° � Ib" N/A (4) Ibd �5" 900 Pf�N�L SPLIG� ��F 'I•I I•I• v
<br /> —_ —- _ —i N��D�D) SF-If�LL • � C,
<br /> P2-2�� ## 8a 2° i2° 2° a��O.G. 3x4 3/4" � i2�� N/a (4) 16d �4° ii�o OGGUR W I TH I N Z4" .I.I I.I. GONNEGT PLYWOOD � �+
<br /> OF M I D-H�I GI--IT, '�'� �'�' W/ bd NAILS @ 3" O.G. � ��� �x s-rvDisr-��a� waLL; B CGKING �I
<br /> *"NOTE: i^lALLS WITH UNIT SHEAF2 OF 350�/ft.OR GREATER SHALL HAVE FRAMIN6 _ PLYWOOD SUB- NAIL PER PLANS; SEE �
<br /> MEMBERS(5TUD5 d PLATES) ABUTTING PANELS NOT LE55 THAN 3X MEMBERS NP�I L ZX BLOGK I NG � I�I �� TO ALL 5TUD5, PLATES - FLoo� � SHEAR 1NALL SGHEDULE. iF�o.eLe � •
<br /> PER IBG 2012,TABLE 23063.1. 3X FRAMING WILL BE NOTED ON PLAN. w� ��� �Fjd ,—,- ,-� � 4 HEADERS O Ex ERIOR'�E I// _ GONTINUE 5/8" rYPE x � • �
<br /> FLOOR .J015T BOT�OM PLATE NAILING —To uNpEtaSiDE oF
<br /> "I-i. . .i I- � 5/B" TYPE �•X" ROOF SHE,4TH I NC7
<br /> SH�P�THI NG �DG�S APA RATED SHTG. Q ��� P�aN �R�r-�i Jois DULE TO �x oBUN�ER5ID�E' PER "INTERIOR SIDE° NOTE ny �
<br /> 8d P�T �" O.G. �� /e MIN. 24/O EXP. I C�)iod TOE NAIL, ,
<br /> I. USE POWER-DRIVEN STEEL 5�JD5 AND NAILS BY HILTY OR RAMSET WHERE APPLIGABLE. 'I'I � 3 �� - - oF 2ooF �V
<br /> 2. PLYWOOD MAY BE INSTALLED EITHER HORIZONTALLY OR VERTIGALLY. 'I'I ��' BOTH 51DE5 .�oisT To TOP NAILING PER 51--IEAR GABLE END Tf2U55 � , �
<br /> 3. 50LID BLOGK WITH J015T UNDER INTERIOR SH�P.R WALLS. PLATE 1^IALL SG1--IEDULE
<br /> - ,�.� �.�, ��
<br /> SHE.4R W,4LL NOTES •I'I I•I• I�51MP50N�� 2WAL 5�D GOr1TINUE 5/8" TYPE X
<br /> HDSB WOOD I6" O.G. TO UNDERSIDE OF �
<br /> ROOF SHEATHING
<br /> � � TO GONG}�.ETE PER "EXTERIOR SIDE" NOTE �
<br /> ZX BLOGK
<br /> 7/Ib"OSB OR PLYWOOD SHEP.THING-U5E 8d GOMMON OR GALVANIZED NAILS. BLOGK ALL PANEL GONNEGTORS OR ,nv" ose
<br /> EDGES. �ONG DIMEN510N5 OF PLYWOOD MAY BE INSTALLED VERTIGALLY.NAIL� 12"O.G TO ALL I'� EQUAL SHEAT#iING iN/
<br /> INTERMEDIATE 57UD5. WHERE 3"NAIL SPAGIN6 15 SPEGIFIED P.T PANEL EDGES,U5E I-I/2� 8CI HAR�IE SIDING �
<br /> 16d TOENAIL 0 6" O.G. �NST.4LL f'ER �
<br /> 5H0�2T NAILS OR 3X 571JD5 WITH 8d GOMMON NAILS. FOR 2"NAIL SPAGING,U5E 3X 5TUD5 I �� MF6.SPEGS
<br /> AND 5TAG6ER PAI�LS. WHERE PLYWOOD 15 2 51DE5 OF WALL, JOINTS TO FALL ON ��� 2X PLATES (I PLf�TE TO TOF' F�LAT�S
<br /> 5�'ARATE 5TUD5 ON EAGH 51DE •II•I I�I� PLUS 2 BLK. BETWE EN 5TUD5) �"ST^���B"TM�•x•6�on".�'��a�M-T��T To��E���aF �
<br /> F�ooFt s�P.niit�+e P.T roP�nre
<br /> I �NAIL SHEATHIN6 TO --2x sTUDisr�eaR �vaL�i APPLIFD PARILLLEL OR AT R16HT AN6LE� TO STJOS WITH bd
<br /> FLOOR PLYWOOD- U5E 8d GOMMON NAILS� 10"O.G.AT INTERMEDIATE 5UPP0�2T5,6"O.G. GOhTEo N�.�LS,I-"t/O•LOt16,0.0915 SH.hNK,V4'r�.vs,�•o.c. �+
<br /> �II���JhJ� NAI L PER PLANS; SEE 2ona ee.nriuw�
<br /> AT ALL.PANEL ED6E5 AND 4"O.G,AT ALL 51i�AR WALLS,UW..E55 OTHERYVISE SFIOWN ON PLANS. �• EAGH PLATE
<br /> ��+'�tl—1L � �-- SHEAR !^aALL SGHEDULE. ti
<br /> FLOOR J015T5-.J015T PP.RRALLEL TO FLOOR OPENINGS AND EXTERIOR WALLS SHALL BE � �- � � � �
<br /> GF2055 BLOGKED AT 48"O.G.�EDGES 1^U(4) IOd NAILS FOR TffE FIRST BAY. -� I � 3/4°G� X IS° A.B. Q
<br /> 3"x 3" x I/4° SQUARE WA5NER5 AT ALL ANGHOR BOLTS. GONG. SLAB q — ���i �
<br /> � � 7 MIN. EMBED. '�I
<br /> 7/Ib"05B OR PLYN100D SHEATHING-STAPLE SGHEDULE V`V 3��X3��X��4�� 0���^ ��I^II'^"�I �I �I 0� � O
<br /> ALLONIABLE SHEAR VAWES WITH HEM FIR�2 571JD5 PLATE WASHER J��/`�� y �/`�J�,J�, �
<br /> - G O N T. F O O T I N G 2 EXTERIOR SIDE� ONE LAYER 48" WIDE 5/0"TYPE X GYPSUM
<br /> 2" 16 GA.STAPLES� I5 6A.STAPL�S� 14 GA.STAPLES� sr+ef+THIN� A���iED PARALLEL TO 2X4 5TUD5
<br /> -_
<br /> 24" O.G. WITFt��.6ALVANIZED RDOFIN6 NAILS
<br /> 3'u O'� �_280 #/ft_ 4� O.G. -280��ft. . �4"O.G.-303#/F{. � �- NO SG/S.LE �+�' v�c.� r.i vcr��i JOINTS AND T" O.G. AT
<br /> Ir1TERMEDIftTE STUDS ftND TOP ftN� BOTfOM PLftTES. �NTERIOR SIDE� ONE I_AYER 5/9" IYPE X GWB,
<br /> 2° O:�-360�/ft. 2-V2'O.G.-4�30�/�lf 3" O.G. -390#/ft. 101NTS OP C�YP�M SHEftTHING MftY BE LEFT WqTE�2 RESISTANT GYPSUM BAGKIN6 BOARD OR GYP��UM VENEER
<br /> 4� O.G.AND ICfJd N�IE4'i 2"O.G.-SO4��fC. UNTREATED.EXTERIOR GLA�DING TO BE ATTAGHED TNRDlI6H APPLIED PARALLEL OR ftT RIGHT ANGLES TO STUDS WITH bd
<br /> � 6" o.�.- 6�o#�ft°t. 20I 2 I RG PORTAL �RAME SFFEA'fHING fi0 THE SlUDS GOATED NAILB,1-�1/B" LONG,0.0415 SHANK, I/4" NEAOS,"1" O.G.
<br /> L _ _ � (INGREASE NAIL LENGTH (LOAI7 BEARING) �
<br /> � R602.2 10.6.2 TO MIN. 2-I/4" WHEN APPLIED
<br /> FIELD SPAGING: 12"O.G.NAILS d STAPLES. ovErz STRuc-rurz,�aL sf+enTHIN�)
<br /> L-I
<br /> HOLDOINNS- INSTALL 51MP50N HOLDOWNS OR EQUIVP.LENT AT THE END OF SHEAR WALLS NO SGALE
<br /> WHEN SHOI^1N ON l7RAN11N65. TO P.`fTP.GH U5E 2X OR 3X HF�2 GON57RUGTION GRADES A5
<br /> SHEAR WAL_L BOUNDARY ELEMENTS. HOLDOWNS ARE ONLY REQUIRED lNHERE SHOWN ON PLANS.
<br /> IN5TALL 5/�B"TYPE "X"GI^�ON INSIDE OF RIM
<br /> APPLIED PARALLEL OR ftT RIGHT ANGLES TO STUDS WITH bd
<br /> GOATE�D NAILS, I-'i/B"LONG,0.0915 SHANK, I/4" HEADS,"1"O.G.
<br /> (LOAD BEARING) �
<br /> I
<br /> IOd � 4" o.c. - ROOF IOd � 4" o.c. - ROOF
<br /> 51--IEATI--IING TO TOP S1--IEATI-fING TO TOP
<br /> G1--IORD TRUSS. G1--IORD TRUSS. �
<br /> TRUSS O�lER
<br /> PLYI^100D ROOF S.W. TO 1--IA�lE PLYWOOD ROO� � a
<br /> 51--IEATI--IING BLOGKING AT 51--IEATI--IING
<br /> 16" O.G.�
<br /> ON� HOUR �XT�RIOR I�IALL
<br /> -r�uss�s -r�uss�s D�Tl�I L (I� L�SS TH�N: �'-0"
<br /> � PER PLAN PER PLAN TO TH� PROP�RTY L I N��
<br /> 2X NAILER - �
<br /> NAIL TO BOTTOM
<br /> G1--IORD W/ 16d A�� GOI`1TINUE
<br /> � 6" o.c. GLIPS SHEAR WALL
<br /> � 24u TO ROOF
<br /> - —�/4" PLYWOOD O.G.�
<br /> � FOl? ALL WALLS LE55 THAN S'-O" �O THE
<br /> PROPERTY LINE
<br /> � ONE F+Ot1R EXTERIOR WA1 1
<br /> 2 ROwS 16d - �-- 16d � 4" o.c. GA �ILE Na. �"�GEN RIGFIR� TEST UL R3501�-4;_�� �
<br /> NAILS � 6" o.a. PLYWOOD TO UL DESIGN U30q UL RI31q-12q "1-22-70 0
<br /> TOPwPLATE � � NAILER � UL DESIGN U314 { a
<br /> �, EXTERIOR SIDE� ONE LAYER 48" WIDE 5/�" TYPE X 6YPSUM r J
<br /> 51--IEAR WALL �-- S1--IEAR WALL SHEATHING APPLIED PARALLEL�O 2X4 51U�5 O (�
<br /> 24" O.G.WITH I-�J/4" GALYANI2ED ROOFING NAILS N �
<br /> SGHEDULE SGHEDULE 4"O.G.AT VERTIGP.�L JOINTS AND'Y" O.G.AT t
<br /> INTERMEDIs�.TE STUDS AND TOP AND BO�OM PLATES. r Q N
<br /> . JOINTS OF GYPSUM 51-IEATHING MAY BE LEFT r
<br /> UNTREATED.EXTERIOR GLADDING TO BE ftTTAGHED 7FIROVGF4 LLf N
<br /> . SHEATHING TO THE STUDS � �
<br /> SHE�R W�LL P�R�LLEL TO T�USS INTERIOR SIDE� ONE LAYER 5/B"TYPE X GWB, 0 W �
<br /> � WATER RES65TANT GYPSUM BAGKING BOARD OR GY'PSUM�/E�NEER (Y �
<br /> L-I IVO SGALE � APPLIED PARALLEL OR AT RIGHT ANGLES TO Sl"UDS WITH bd
<br /> GOATED NAILS, I-1/B° LON6,0.0919 SHANK,I/4° HEADS,?" O.G. w �
<br /> (LOft� BEftRING) � I"' �
<br /> � n �
<br /> u
<br /> I `�� �� .
<br /> ALL GONSTRUGTION TO GOMPLY WITH THE 2012 WASHINGTON ���� '
<br /> STATE ENERGY GODE TABL� 406.2 �r1�RC�Y GREDITS �
<br /> F-IOUS�S B�TW��rI I SOO SQ�T Ar1D SO00 SQ�T
<br /> ENERGY GODE REQUIREMENTS BASED ON PRESGRIPTIVE ��Qu��� I.S GREDITS '
<br /> REQUIREMENTS FOR GROUP R OGGUPANGY - GLIMATE ZONE 5 OPTION �R�DIT,(,�� O
<br /> O�'TIOrI SB
<br /> ���i��r�T waT�rz ��aTir�� � rJ ZXF� FRf�M� TO Mf�K� POST �
<br /> POST ENERGY GODE GOMPLIANGE GERTIFIGATE WITHIN 3� OF Gas, ��o�ar��, o� oiL WAT�R i-I�AT�R —IZ�� x IZ"
<br /> ELEGTRIGAL SERVIGE PANEL. w�T� a r�tlr�ir�tur�t �� o� .a2
<br /> ALL HOT WATER PIPES IN UNHEATED SPAGES MUST INSTALL PROGRAMMABLE THERMOSTAT TO GONTROL HVAG '
<br /> BE INSULATED WITH R-3 INSULATION PER 2012 WSEG SEG403.4.2 SYSTEM F�xF� STRUGTURf�L POST �
<br /> �GL I M?�T� ZON� �✓- ?�ND M?�RI N� 4� PLYWOOD o2 �
<br /> F-ff�RDl� PRODUGT
<br /> SKYLIGHT GLAZED GEILING WOOD FRAMED FLOOR BeLow �RP.De SH�f�THING
<br /> FENESTRATION s�aB �-vp.�ue MP�T�RIP�L M
<br /> U-�AGTOR U-FAGTOR ��NESTRATION R-�lALUE WALL R-�lALUE R-�lALUE YV/-ZLL R-�lALUE RND DEPTH �J�F3�� TYPE ��X�� C�WB OR w
<br /> s��� SIMILf�R Rf�T�D �XT�RIOR
<br /> O.�O O.SO riR �-`�a , �-z1 �_�� lo/IS R-lo, z ���T US� PRODUGT TO B� f�PPLI�D ���
<br /> (�-�e vAu�r�n� R-z I +TB D I R�GTLY O��R ZX4 f�ND 4X4
<br /> FRf�M�-Nf�IL P�R ON� HOUR D�Tf�IL
<br /> NOT�D f�T GR�f�T ROOM FIR�PLf�G�
<br /> \ /�'�I�I ��� �'�I ON f�LL 4 SID�S OF GOLUMN �
<br /> 1( I V I V � � I 1�1� I ����� �1�1 : o�� �our� �x-r�r�� or� �oLu�� D�-r�� L
<br /> MI'50"1.3 INTERMITTENTLY OPERP.TIN6 VENTILATION'SY5TEM5. �I� �I T�I � �J�-O �� O� ��O���TY L I ��)
<br /> THE DELIVERED VENTILATION RP.TE FOR INTEiZMITTENTLY PER�ORM BUILDING AIR LEAKAGE TEST (BLOWER DOOR TEST) �
<br /> OPERATIN6 VENTILATION 5Y5TEM5 SHALL BE THE IN AGGORDANGE TO WSEG
<br /> GOMBINATION OF ITS DELIVERED GAPAGITY FROM TABLE
<br /> MI50"1.3.3 (U,AND IT5 VENTILATION EFFEG'TIYENE55 AND DAILY
<br /> FRAGTIONAL OPERATION TIME FROM TABLE M150'1.3.3(2)
<br /> PROVIDE DUGT SEALING AFFIDAVIT (IF APPLIGABLE)
<br /> � I ���I �l� ���� ��1���1�� : .J
<br /> SEGTION 404 - ELEGTRIGAL '.POWER � LIGHTING SYSTEMS �
<br /> 404.1 Interlor Llghting: A minlmum of �15 percent of all
<br /> luminaries shall be high efficacy luminaires.
<br /> S�EATTLE PACIFIC HOMES, INC. CO�PYRIGHT OO 2011
<br />
|