My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/24/2018
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:44:51 AM
Creation date
7/31/2018 11:36:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/24/2018
Council Approval Date
7/3/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Tracking Number
0001332
Total Compensation
$908,095.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 10/22/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/4/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> Substantial Completion will not occur for any Work until the entire Project is ready for <br /> possession and use. The acceptance notice will include a Punch List of incomplete Work items <br /> and corrective Work, set the date for their completion and repair, describe the division of <br /> responsibility between the Owner and Contractor, and describe any other terms of acceptance. <br /> The Contractor will acknowledge receipt of the acceptance notice in writing, indicating111 <br /> acceptance of all of its terms and provisions. <br /> C. Subsequent to the Substantial Completion date, the Owner may exclude the Contractor from the <br /> Work during such periods when construction activities might interfere with the intended <br /> operation of the Project. The Owner, however, shall allow the Contractor reasonable access for <br /> completion or correction of incomplete Punch List items. <br /> 111 5.8 Acceptance of Work <br /> A. Upon completion of the Project, including, but not limited to, record drawings, as-builts,required <br /> reports and operations and maintenance manuals, the Contractor shall so notify the Owner's <br /> Representative in writing. Upon receipt of the notification, the Owner's Representative will <br /> promptly, by personal inspection, determine the actual status of the Work in accordance with the <br /> terms of the Contract. If the Owner's Representative finds materials, Equipment, or <br /> workmanship that do not meet the terms of the Contract, he or she will prepare a Punch List of <br /> such items and submit it to the Contractor. Following completion of the corrective Work by the <br /> Contractor, the Owner's Representative will notify the Owner that the Work has been completed <br /> in accordance with the Contract. The Owner shall make the final determination of acceptability <br /> and completion. For portions of the Project not previously accepted as substantially complete,the <br /> conditions of guarantee shall commence on the date that the Owner determines the Project is <br /> complete. <br /> ARTICLE 6 CHANGES <br /> 6.1 Owner's Right to Direct Changes to the Work <br /> A. The Owner reserves the right to change the Work at any time. Such changes shall not invalidate <br /> the Contract nor release the surety, and the Contractor agrees to perform the Work as changed. <br /> Among others,these changes and alterations may include: <br /> 1. Deleting or omit any part of the Work, Equipment or material to be provided under this <br /> Contract,and <br /> 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications, designs, or both, I <br /> 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, I <br /> 6. Altering facilities, Equipment, materials, services, or sites, provided by the Owner, and <br /> 7. Ordering the Contractor to accelerate or Delay Work. <br /> B. If the Contractor and Owner do not agree upon scope of Work changed or adjustment to the <br /> Contract Sum and Contract Time, the Owner may, at its sole option, unilaterally direct the <br /> Contractor to implement any change by notice. The Owner shall not pay or be responsible or <br /> liable for any change implemented by the Contractor without explicit notice from the Owner to <br /> proceed. <br /> PROCESS WATER PUMP STATION 06/13/2017 1 <br /> WO-3647 00 72 13 - 28 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.