My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/24/2018
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:44:51 AM
Creation date
7/31/2018 11:36:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/24/2018
Council Approval Date
7/3/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Tracking Number
0001332
Total Compensation
$908,095.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 10/22/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/4/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> to the Work and Work Site, and to places where Work is being prepared, or where materials, <br /> Equipment, or machinery are being obtained for Work. The Contractor shall provide <br /> information requested by the Owner's Representative in connection with inspection work. <br /> 2. If the Contract Documents, laws, ordinances, or any public regulatory authority requires <br /> parts of the Work to be specially inspected, tested, or approved, the Contractor shall give the <br /> Owner's Representative adequate prior written Notice of the availability of the subject Work <br /> for examination, which Notice shall be not less than two working days. <br /> 3. Inspection and quality control tests performed on Work by the Contractor by the Owner's <br /> Representative shall not relieve the Contractor of its responsibility for errors or lack of <br /> quality therein and shall not be regarded as an assumption of risks or liability by the Owner's <br /> Representative for the Contractor's compliance with these Contract Documents. Contractor <br /> remains responsible and liable for all errors, defects or a lack of quality not discovered by <br /> inspection or observation. <br /> 4. If parts of the Work are covered prior to inspection or observation, the cost of exposing the I <br /> Work for inspection and closing and re-covering shall be borne by the Contractor regardless <br /> of whether the Work is found to be in compliance with the Contract. <br /> B. Samples of Materials <br /> 1. The Contractor shall provide Samples or specimens of materials to be incorporated in the <br /> Work that require laboratory examination or special testing, as requested by the Owner's <br /> Representative. Such Samples or specimens shall be provided in ample time to permit <br /> making proper test analysis and examinations before the Contractor plans to incorporate the <br /> material into the Work. An independent testing laboratory will conduct tests of material in <br /> accordance with the Specifications. In the absence of a specific test requirement, the <br /> Owner's Representative will determine the appropriate standard test to be used. <br /> C. Certification I <br /> 1. In cases where compliance of materials or Equipment to Contract requirements is not readily <br /> determinable through inspection and tests, the Contractor shall provide properly <br /> authenticated documents, certificates, or other proof satisfactory to the Owner's <br /> Representative that the materials and Equipment comply with the Contract requirements. <br /> These documents, certifications, and proofs shall include performance characteristics, <br /> construction materials, and physical or chemical characteristics of materials. The Contractor <br /> shall pay all associated costs of such certification. <br /> D. Inspection at Point of Manufacturing <br /> 1. The Contractor shall be responsible and reimburse the Owner for the costs of inspections, if <br /> inspections occur outside of Whatcom, Skagit, Island, Snohomish, King, Pierce and <br /> Thurston counties if: <br /> a. Inspection and testing of materials or Equipment in the vicinity of the Work by the <br /> Owner is not practicable, or <br /> b. The Contractor requests the Owner to inspect and test material or Equipment at the <br /> point of manufacture,or <br /> c. The Specifications require that inspection, testing or witnessing of tests take place at 111 <br /> the point of manufacture. <br /> 2. Costs to be paid or reimbursed by the Contractor include, but are not limited to, travel, <br /> subsistence, labor and lodging expenses of the Owner's inspector. <br /> PROCESS WATER PUMP STATION 06/13/2017 , <br /> WO-3647 00 72 13 - 34 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.