My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/24/2018
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:44:51 AM
Creation date
7/31/2018 11:36:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/24/2018
Council Approval Date
7/3/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Tracking Number
0001332
Total Compensation
$908,095.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 10/22/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/4/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> C. Retention of Defective Work <br /> 1. In its sole discretion, the Owner may retain Work that is not in compliance with the <br /> Contract. <br /> 2. The Owner will determine the just and reasonable value for such defective Work and I <br /> deductions will be made in the payments due or to become due to the Contractor. <br /> 3. Final Acceptance will not act as a waiver of the Owner's right to recover from the Contractor <br /> an amount representing the deduction for retention of defective Work. I <br /> 8.8 Materials and Equipment Furnished by Owner <br /> A. Contractor shall install materials and Equipment furnished by the Owner as provided in the 111 <br /> technical sections of the Specifications. <br /> B. Furnishing of material and Equipment by the Owner will be considered conclusive evidence of I <br /> their acceptability for the purpose intended. <br /> C. If the Contractor discovers defects in material or Equipment furnished by the Owner, he or she <br /> shall immediately notify the Owner. <br /> D. After such discovery, the Contractor shall not proceed with Work involving Owner-furnished <br /> materials and Equipment unless authorized by the Owner. <br /> E. Unless otherwise noted or specifically stated, materials and Equipment furnished by the Owner, <br /> which are not of local occurrence or manufacture, are considered to be "FOB" railroad station or <br /> truck terminal nearest to the Site of the Work. <br /> F. At no cost to the Owner, the Contractor shall unload, transport, store, and protect such material <br /> and Equipment from damage. <br /> 1. The Contractor shall inspect such Owner-furnished material and Equipment on receipt and <br /> provide the Owner with written acceptance for the incorporation of said material and <br /> Equipment into the Work. <br /> 2. After receipt by the Contractor, the Contractor bears all risk of loss and casualty to Owner <br /> furnished materials and Equipment. <br /> 8.9 Guarantee <br /> A. The Contractor warrants to the Owner that all materials and Equipment furnished under this 1 <br /> Contract will be of highest quality and new unless otherwise specified by the Owner, free from <br /> faults and defects and in conformance with the Contract Documents. <br /> 1. All Work not so conforming to these standards shall be considered defective. I <br /> 2. If required by the Owner's Representative, the Contractor shall furnish satisfactory evidence <br /> as to the kind and quality of materials and Equipment. <br /> 111 B. The Work furnished must be of first quality and the workmanship must be the best obtainable in <br /> the various trades. <br /> 1. The Work must be of safe, substantial and durable construction in all respects. 1 <br /> PROCESS WATER PUMP STATION 06/13/2017 1 <br /> WO-3647 00 72 13 - 36 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.