My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/24/2018
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:44:51 AM
Creation date
7/31/2018 11:36:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/24/2018
Council Approval Date
7/3/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Tracking Number
0001332
Total Compensation
$908,095.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 10/22/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/4/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. A preliminary list of persons of involved in such event; <br /> ' 3. A statement whether the Contractor believes the event may result in a Contract Claim for <br /> additional Contract Time or adjustment of the Contract Sum; <br /> 4. A date by which Contractor shall begin providing Supplemental Information as provided in <br /> this section. <br /> ' 10.3 Supplemental Information <br /> A. Contractor shall supplement the written Notice as soon as possible with a written statement <br /> providing the following: <br /> 1. The date of the event, incident, direction,and other pertinent information; <br /> 2. The nature and circumstances giving rise to the Notice; <br /> ' 3. The Contract provisions relating to,but not limited to,the event, incident,and direction; <br /> 4. The estimated dollar cost, if any,of the Extra Work, or Delay, or both and how that estimate <br /> was determined; and <br /> ' 5. An analysis of the schedule showing the schedule change or disruption if the Contractor is <br /> asserting a schedule change or disruption. <br /> ' B. Contractor Records. <br /> 1. Throughout any work related to a Notice, the Contractor shall keep complete and accurate <br /> records of costs, expenses, and time incurred for which Contractor will or may seek an <br /> ' adjustment. <br /> 2. Contractor waives and is stopped from seeking an adjustment of Contract Sum or Contract <br /> Time where Contractor fails to keep and maintain cost, timekeeping, and scheduling records <br /> ' segregated and contemporaneously allocated to the subject work for which an adjustment is <br /> sought. <br /> a. For example, failure to keep contemporaneous labor and equipment time records <br /> ' specifically and only allocated to each item of claimed Extra Work shall constitute a <br /> waiver of any Contract Claim for reimbursement or additional Contract Time for each <br /> such item of Extra Work. <br /> b. The Contractor shall permit the Owner access to these and any other records needed for <br /> evaluating requests for additional Contract Time or Contract Sum. <br /> ARTICLE 11 DIFFERING SITE CONDITIONS <br /> 11.1 General <br /> ' A. Notification <br /> 1. Upon discovery and before such conditions are disturbed, the Contractor shall promptly <br /> provide Notice to the Owner's Representative of: <br /> a. Preexisting subsurface or latent physical conditions at the Site differing materially from <br /> those indicated in this Contract,or <br /> b. Preexisting unknown physical conditions at the Site, of an unusual nature, differing <br /> ' materially from those ordinarily encountered and generally recognized as inhering in <br /> Work of the character provided for in this Contract. <br /> ' PROCESS WATER PUMP STATION 06/13/2017 <br /> WO-3647 00 72 13 - 51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.