My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/24/2018
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:44:51 AM
Creation date
7/31/2018 11:36:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/24/2018
Council Approval Date
7/3/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Tracking Number
0001332
Total Compensation
$908,095.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 10/22/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/4/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 CITY OF EVERETT, WASHINGTON <br /> SPECIFICATIONS FOR <br /> PROCESS WATER PUMP STATION <br /> WO NO. - 3647 <br /> NOTICE TO CONTRACTORS <br /> ADVERTISEMENT FOR BIDS <br /> Notice is hereby given that sealed bids for the PROCESS WATER PUMP STATION will be received at the <br /> office of the City Clerk, 1St Floor Wall Street Building, 2930 Wetmore, Everett, Washington 98201, until 2:00 p.m. <br /> on Tuesday, June 5th, 2018. At the appointed time, all bids will be opened and publicly read aloud in the 8th <br /> floor hearing room at the Wall Street Building. The engineer's estimate for this Project is $1,000,000. <br /> Work being performed includes, but is not limited to, furnishing all labor, materials and equipment necessary to <br /> construct a new pump skid, modifications to the existing water pump configurations, structural revisions to the <br /> existing process water pump station building, and associated electrical work along with other such <br /> appurtenances and performing all Work as required by the Contract, in accordance with the Contract Plans and <br /> Contract Provisions. <br /> Plans, Specifications, Addenda, and plan holders list for this Project may be viewed on line at <br /> https://everettwa.gov/319/Bid-Opportunities. <br /> Plan sets may also be purchased at Bill's Blueprints (425) 259-0859 at 2920 Rockefeller Avenue, Everett, WA <br /> 98201. <br /> For technical questions regarding this Project contact: John Nottingham P.E., Project Manager, City of Everett, <br /> at (425) 257-8872 <br /> All bids must be made upon the regular forms provided for this purpose and must be accompanied by a bid <br /> bond or certified check in an amount not less than five percent (5%) of the total amount of the Bid. <br /> The City reserves the right to reject any and all bids and to waive any irregularities or informalities. No Bidder <br /> may withdraw his Bid after the hour set for the opening thereof. The City further reserves the right to make the <br /> bid award as deemed in the best interest of the City. The right is reserved by the City to postpone the award for <br /> a period of forty-five (45) days after bid opening. <br /> The Contractor will be required to comply with all local, State, and Federal laws and regulations pertaining to <br /> equal employment opportunities. <br /> By order of the City Council, Everett, Washington. <br /> Dated at Everett, Washington. <br /> I <br /> SHARON FULLER, CITY CLERK <br /> I <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.