Laserfiche WebLink
I <br /> CITY OF EVERETT PUBLIC WORKS 00 41 13 I <br /> SPECIAL PROVISIONS BID FORM-STIPULATED SUM <br /> (SINGLE-PRiME CONTRACT) <br /> I <br /> ITEM NO. DESCRIPTION UNiT CONTRACT PRiCE <br /> I <br /> l3D-o0 <br /> I. Trench Safety Systems 50 LF $ l t5 DD •CI) <br /> I <br /> 2. Pump Station, Complete LS $ �a t Duo-Ov <br /> 3. Force Account FA $15.000.00 <br /> I <br /> Washington State Sales Tax @ 8.3% $ (06t 50l5.5D <br /> TOTAL BID $ dIDl, OS .60 <br /> 1.3 ACCEPTANCE <br /> A. This offer shall be open to acceptance and is irrevocable for 45 days from the Bid closing date. I B. if this Bid is accepted by the Owner within the time period stated above,we will: <br /> 1. Execute the Agreement within 14 days of receipt of Notice of Award. <br /> 2. Furnish the required 100% payment and 100% performance bonds within 14 calendar <br /> I <br /> days of receipt of Notice of Award in the form described in Supplementary Conditions. <br /> 3, Commence Work within seven calendar days after receipt of Notice to Proceed. <br /> C. If this Bid is accepted within the indicated time, and we fail to commence the Work or we fail to I provide the required bonds, the Bid security shall be forfeited as damages to the Owner by <br /> reason of our failure, limited in amount to the lesser of the face value of the Bid security or the <br /> difference between this Bid and the Bid upon which Contract is signed. <br /> I <br /> D. In the event our Bid is not accepted within the time slated above. the required Bid security will <br /> he returned to the undersigned,according to the provisions of the instructions to Bidders, unless <br /> a mutually satisfactory arrangement is made for its retention and validity for an extended period t <br /> of time. <br /> 1.4 CONTRACT TIME <br /> I <br /> A. If this Bid is accepted,we will: <br /> 1. Begin work immediately after receiving Owner's letter of Notice to Proceed and to reach t <br /> Substantial Completion within the dates required under the Contract Documents. <br /> 2. Agree to pay liquidated damages to the City as stated in the Contract (Document 00 60 <br /> 13) in the event the project is not completed on or before required time periods. <br /> 3. Contract with the Owner using the Contract form provided herewith, on the terms and I conditions contained herein, to do everything necessary for to complete the construction <br /> of the project within the allotted time. <br /> I <br /> PROCESS WATER PUMP STATION May 11.2018 <br /> WO-3647 004113-2 <br /> I <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal I <br />