My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stellar J Corporation 7/24/2018
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:44:51 AM
Creation date
7/31/2018 11:36:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/24/2018
Council Approval Date
7/3/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Tracking Number
0001332
Total Compensation
$908,095.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 10/22/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/4/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> ' CITY OF EVERETT PUBLIC WORKS 00 60 13 <br /> SPECIAL PROVISIONS CONTRACT <br /> DOCUMENT 00 60 13—CONTRACT <br /> 1.1 GENERAL <br /> th <br /> A. THIS CONTRACT is made and entered into this 3 day of 3UL`I , 2018, by and <br /> between the City of Everett, Washington, a municipal corporation existing under the laws of the <br /> State of Washington, hereinafter called the "City," and <br /> .5"r 1-1-AR 5 COR(o t"r"ot a <br /> 1—FAS Cof:PoQt4T%oti ,hereinafter called the"Contractor." <br /> B. In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees <br /> to furnish all labor,tools, materials, equipment, and supplies required to build and construct and <br /> to build and construct in a workmanlike manner the Work, improvements, and appurtenances in <br /> accordance with the Specifications and Drawings entitled: "Process Water Pump Station <br /> (WO-3647)", (the"Project"). <br /> 1.2 DEFINITIONS <br /> A. Contract Documents. The following documents ("Contract Documents") are incorporated by <br /> reference and are hereby made a part of this Contract: <br /> 1. Notice to Bidders <br /> 2. Instructions to Bidders <br /> 3. General Conditions <br /> 4. Supplementary Conditions(if any) <br /> 5. Drawings, Standard Plans,and Specifications <br /> 6. Addenda(if any) <br /> 7. Payment and Performance Bond <br /> 8. Contractor's Bid Form <br /> 9. Other documents described as Contract Documents in Section 00 72 13, General <br /> Conditions <br /> 10. All provisions required by law whether set forth and reproduced herein or not. <br /> B. Terms that are capitalized in a Contract Document but not defined in that Contract Document <br /> shall have the meaning defined to them in the other Contract Documents. <br /> C. Contract Time. <br /> 1. Substantial Completion of the Work shall be achieved within 150 calendar days after the <br /> ' effective date of the Notice to Proceed. <br /> 2. Physical Completion shall be within 21 calendar days after the actual date of issuance of <br /> substantial completion. <br /> D. Liquidated Damages—Substantial and Physical Completion. <br /> 1. The parties agree the City will suffer damage and be put to additional expense in the <br /> ' event that the Contractor does not complete the Work in all respects and have it ready for <br /> use by the Substantial and Physical Completion dates stated above. <br /> PROCESS WATER PUMP STATION 02/27/2018 <br /> WO-3647 00 60 13 - 1 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.