Laserfiche WebLink
CITY OF EVERETT PUBLIC WORKS 00 60 13 <br /> CONTRACT <br /> PROVISIONS <br /> M. Pre-Bid Inspection and Risk of Loss. <br /> 1. It is understood that the whole of the work under this contract is to be done at the <br /> Contractor's risk and that: <br /> a. prior to submitting its it became familiar with the conditions of excavation, <br /> subsurface, backfill, materials, climatic conditions, location, traffic, and other <br /> contingencies that may affect the work and has made its bid accordingly and <br /> b. that it assumes the responsibility and risk of all loss or damage to materials or <br /> work that may arise from any cause whatsoever prior to completion. <br /> ' N. Headings for Convenience Only. <br /> 1. The headings in this document are for convenience only, and shall not used or considered <br /> I to interpret or construe this document. <br /> O. Effective Date. <br /> 1. This Contract is effective as of the date of the last person to sign it, and may be executed <br /> in multiple counterparts,each of which shall be deemed an original. <br /> 1 <br /> I <br /> r <br /> 1 <br /> r <br /> I <br /> 1 <br /> PROCESS WATER PUMP STATION 02/27/2018 <br /> WO-3647 00 60 13 -5 <br /> I <br />