Laserfiche WebLink
1 CITY OF EVERETT PUBLIC WORKS 00 11 13 <br /> SPECIAL PROVISIONS ADVERTISEMENT FOR BIDS <br /> DOCUMENT 00 11 13 -ADVERTISEMENT FOR BIDS <br /> 1.1 PROJECT INFORMATION <br /> A. Notice to Bidders: Bidders may submit bids for Project as described in this Document. Submit <br /> bids according to the Instructions to Bidders. <br /> B. Project Identification:PROCESS WATER PUMP STATION—WO-3647 <br /> 1. Project Location: 6133 Lake Chaplain Rd., Sultan,WA 98294 <br /> a. T28N,R8E,Sec 6,NE quarter <br /> C. Owner:City of Everett, 3200 Cedar St,Everett, WA 98201 <br /> 1. Owner's Representative: John Nottingham, PE, Project Manager, <br /> Ijnottingham@everettwa.gov. <br /> D. Civil Design Engineer:Lance Stevens, PE,Project Manager, lstevens@g-o.com. <br /> ' E. Structural Engineer: Myron Basden,PE, SE,mbasden@g-o.com. <br /> F. Electrical Engineer:John Gallucci,PE,jgallucci@g-o.com. <br /> G. Project Description: This project consists of the installation of a new pump skid, modifications <br /> to the existing water pump configurations, structural revisions to the existing process water <br /> pump station building,and associated electrical work. Work required is indicated on the project <br /> drawings and described in further detail in Section 01110—Summary of Work. <br /> H. Total Project Cost: Total Project cost estimated to be$1,000,000. <br /> 1.2 BID SUBMITTAL AND OPENING <br /> ' A. Owner will receive sealed lump sum bids until the Bid Time on the Bid Date at the Office of the <br /> City Clerk at the location given below. Bids will not be received thereafter. <br /> 1. Bid Date: Tuesday,June 5, 2018. <br /> 2. Bid Time: 2:00 p.m., local time. <br /> 3. Location: Office of the City Clerk,2930 Wetmore Ave, Everett, WA 98201. <br /> B. All bids must be submitted on upon the forms provided by Owner for this purpose. <br /> C. At the Bid Time, the Bids will be publicly opened and read aloud at the Office of the City <br /> Clerk. <br /> D. The City reserves the right to reject any and all bids and to waive any irregularities or <br /> informalities. <br /> E. No bidder may withdraw their bid after the Bid Time, except as otherwise provided in <br /> Document 00 21 13- Instructions To Bidders. <br /> F. The City further reserves the right to make the bid award as deemed in the best interest of the <br /> I City. <br /> G. The right is reserved by the City to postpone award for a period of 45 days after the bid <br /> opening. <br /> H. The Bidder shall comply with all Federal, State and local laws regarding equal employment <br /> opportunities. <br /> ' PROCESS WATER PUMP STATION May 9, 2018 <br /> WO-3647 00 11 13 - 1 <br /> I <br />