Stellar J Corporation 7/24/2018
>
Contracts
>
Capital Contract
>
Stellar J Corporation 7/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 11:44:51 AM
Creation date
7/31/2018 11:36:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
7/24/2018
Council Approval Date
7/3/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Process Water Pump Station
Public Works WO Number
UP3647
Tracking Number
0001332
Total Compensation
$908,095.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 10/22/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Stellar J Corporation 5/4/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
700
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I <br /> H. The Owner's Representative may appoint assistants and inspectors to assist in determining that <br /> the Work and materials meet the Contract requirements. Assistants and inspectors have the <br /> authority to reject defective material and suspend Work that is being done improperly, subject to <br /> the final decisions of the Owner's Representative or, when appropriate,the Owner. <br /> II. Assistants and inspectors are not authorized to accept work, to accept materials, to issue <br /> instructions, or to give advice that is contrary to the Contract. Work done or material furnished <br /> which does not meet the Contract requirements shall be at the Contractor's risk and shall not be a <br /> basis for a Contract Claim even if the Owner's Representative, inspectors or assistants purport to <br /> change the Contract. <br /> J. Assistants and inspectors may advise the Contractor of faulty Work or materials or infringements <br /> of the terms of the Contract; however, failure of the Owner's Representative or the assistants or <br /> inspectors to advise the Contractor does not constitute acceptance or approval. <br /> K. The Contractor shall submit supplemental working or detail drawings as required for the <br /> performance of the Work pursuant to 2.4. Submittals. Except as noted, all drawings and other <br /> Submittals shall be delivered directly to the Owner's Representative. The drawings shall be on <br /> sheets measuring 22 by 34 inches, 11 by 17 inches, on sheets with dimensions in multiples of 8- <br /> 1/2 by 11 inches, or other size approved by the Owner consistent with the Work to be detailed. <br /> Contractor shall provide drawings far enough in advance of ordering or installation to allow for <br /> ' review by the Owner's Representative or other agencies and possible resubmittal and further <br /> review after resubmittal. After a plan or drawing has been reviewed and returned to the <br /> Contractor, all changes proposed by the Contractor may be submitted to the Owner's <br /> Representative for review and comment. <br /> L. The Contractor shall obtain the Owner's Representative's written acknowledgement of approved <br /> Submittals before proceeding with the Work represented by the Submittal. Such review does not <br /> impose any responsibility upon the Owner,nor does it relieve the Contractor of any responsibility <br /> for the accuracy of the Submittal or its conformity with the Contract. The Contractor shall bear all <br /> risk and all costs of any Work delays caused by resubmittal or correction of Submittals. The <br /> ' Contractor shall allow sufficient time for Owner's review of Submittals and possible corrections <br /> by the Contractor so as not to delay the Work. <br /> M. The Contractor's Bid price shall include all costs of all Submittals, including, but not limited to, <br /> ' working,detail and shop drawings. <br /> ARTICLE 4 CONTRACTOR <br /> 4.1 Contractor's Representative <br /> A. The Contractor shall notify the Owner in writing of the name of the person who will act as the <br /> Contractor's representative and shall have the authority to act in matter relating to this Contract. <br /> This person shall have authority to carry out the provisions of the Contract and to supply <br /> materials, Equipment,tools and labor without delay for the performance of the Work. <br /> ' B. Contractor shall employ and keep on Site on a full time basis personnel experienced in the <br /> management of construction of projects of this size and type. These shall include, but not be <br /> ' limited to, a project manager and superintendent. Neither the Contractor's project manager nor <br /> the superintendent shall have supervisory responsibility for other Projects for the Contractor <br /> while assigned to this Project. Contractor shall employ and assign such additional, full time <br /> office, support and engineering personnel to support the project manager and superintendent and <br /> ' PROCESS WATER PUMP STATION 06/13/2017 <br /> WO-3647 00 72 13 - 15 <br /> I <br />