My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc 7/18/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
HDR Engineering Inc 7/18/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2018 9:35:24 AM
Creation date
8/2/2018 9:35:13 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc
Approval Date
7/18/2018
End Date
9/28/2018
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Engineering Evaluation & Review
Tracking Number
0001336
Total Compensation
$35,360.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Document in the technical memorandum other potential revisions to the proposed <br /> treatment concept. <br /> 7. Meet with the City to present the analysis. <br /> Client Responsibilities <br /> 1. Provide historical CSO data for at least the last five years. <br /> 2. Provide climate change impacted rainfall time series for at least a 20 year period. <br /> 3. Document system changes that have been implemented since the completion of the <br /> Bond Street RTB design. <br /> Assumptions <br /> 1. The original calibrated Bond Street spreadsheet model will be used to predict volume <br /> flow response at the Bond Street site. The calibration coefficients will be adjusted to <br /> reflect current overflow data. <br /> 2. The original cost estimate will be used as a basis for reevaluating current construction <br /> costs. <br /> Deliverables <br /> 1. Draft and final technical memorandum documenting potential Bond Street RTB <br /> performance. <br /> Task 2 — Additional Services <br /> Objective <br /> 1. Provide additional services as requested by the City. <br /> HDR Services <br /> 1. It is difficult to accurately anticipate all the issues that may arise during the development <br /> of the project. This task establishes a contingency fund for unidentified and <br /> unanticipated work. <br /> 2. This task is specifically designed to allow payment to HDR under this contract for <br /> changes in the scope of work which the City determines to be necessary. The funds <br /> included in this task cannot be utilized without written approval from the City. <br /> Client Responsibilities <br /> 1. When identified, authorize additional services via email and/or in writing. <br /> Assumptions <br /> 1. An allowance of$10,000 is included for additional services. <br /> Deliverables <br /> 1. To be determined. <br /> City of Everett— Bond Street RTB Review Scope of Work <br />
The URL can be used to link to this page
Your browser does not support the video tag.