Laserfiche WebLink
DR@ J ems: ca.4-i•04) <br /> 1 thereafter until the Completion Date. Progress estimates made during progress of the <br /> 2 work are tentative, and made only for the purpose of determining progress payments. <br /> 3 The progress estimates are subject to change at any time prior to the calculation of the <br /> 4 final payment. <br /> 5 <br /> 6 The value of the progress estimate will be the sum of the following: <br /> 7 1. Unit Price Items in the Bid Form—the approximate quantity of acceptable units of <br /> 8 work completed multiplied by the unit price. <br /> 9 2. Lump Sum Items in the Bid Form—based on the approved Contractor's lump sum <br /> 10 breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> 11 determination. <br /> 12 3. Materials on Hand— 100 percent of invoiced cost of material delivered to Job site 6 <br /> l <br /> 13 or other storage area approved by the Engineer. 1 <br /> 14 4. Change Orders—entitlement for approved extra cost or completed extra work as <br /> 15 determined by the Engineer. <br /> 16 i <br /> 17 Progress payments will be made in accordance with the progress estimate less: <br /> 18 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br /> 19 2. The amount of progress payments previously made; and <br /> 20 3. Funds withheld by the Contracting Agency for disbursement in accordance with the i <br /> 21 Contract Documents. g <br /> 22 e <br /> 23 Progress payments for work performed shall not be evidence of acceptable performance <br /> 24 or an admission by the Contracting Agency that any work has been satisfactorily <br /> 25 completed. The determination of payments under the contract will be final in accordance I <br /> 26 with Section 1-05.1. <br /> 27 <br /> 28 Retainage i <br /> 29 <br /> 30 Section 1-09.9(1)content and title is deleted and replaced with the following: I <br /> 31 <br /> 32 (June 27,2011 WSDOT GSP) <br /> 33 Vacant i <br /> 34 <br /> 35 Disputes and Claims <br /> 36 A <br /> 37 Section 1-09.11 is revised to read: 3 <br /> 38 <br /> 39 (August 2, 2010 WSDOT GSP) <br /> 40 When protests occur during a Contract, the Contractor shall pursue resolution through . <br /> 41 the Project Engineer. The Contractor shall follow the procedures outlined in Section 1- <br /> 42 04.5. E <br /> 43 <br /> 44 If the negotiations using the procedures outlined in Section 1-04.5 fail to provide 1 <br /> 45 satisfactory resolution of protests, then either party, Engineer or Contractor, may refer x <br /> 46 the dispute to the Disputes Review Board. ° <br /> 47 <br /> 48 Disputes Review Board <br /> 49 <br /> 50 Section 1-09.11(1) is deleted and replaced with the following: t <br /> I <br /> CITY OF EVERETT <br /> GRAND AVENUE PARK BRIDGE .kdy 2017 <br /> WO#3588 say <br /> 1 <br /> I <br />