Laserfiche WebLink
1/2 GRIp SPACING MAX. TYP. TO ADDITIONAL CROSS RUNNERS <br /> BRACE WIRES - 12 GA. VERTICAL HANGER a <br /> WHERE 2� X 2'- GRID OCCURS WIRE � 4'-0" EACH NlAY — ---- $ GA. HANGER WIRES � <br /> ' " WITH MIN. 3 TIGHT TURNS IN 4'-0" O.C., SADDLE-TIED ° 4 a ° 4 <br /> CROSS RUNNERS AT 2 --0 O.C. 12 GA. BRACING WIRE WI7H AROUND MAIN RUNNERS a � u <br /> MIN. 4 TIGHT TURNS IN 1 1 f 2" BOTH ENDS OF WIRE a <br /> 1 1/2" 60TH ENDS OF -- — SADDLE-71ED CROSS FURRING ° � ` 4 ° a ° �{ �, � <br /> 5 WIRE-TYP. SEISMIC COMPRESSION STRUT TO MAIN RUNNERS WITH 2 a. a � ��-�� <br /> STRANDS OF 18 GA. WIRE OR ��'`� <br /> 1 STRAND OF 16 GA. WIRE ° <br /> 3/4 FIXED SIDE �� MAX � + <br /> / » <br /> . MAIN RUNNERS AT S 3 4 UNDERSIDE 0� STRUCTURE <br /> CLR. COMPRESSION STRUT <br /> • 4'-0" O.C. J � � � �, � � � �i � � <br /> 12 GA. VERTICAL � ANCHOR TO STRUCUTRE WITH <br /> � HANGER WIRES AT z 3/16"� POWER DRIVEN STUD <br /> � 4'-0" ac. �ax., �- M�. CLIENT: <br /> �p� °`� �P� � ,��" X 16 GAUGE TRACK SK�TDAL REAL ESTATE <br /> PLAN LENGTH OF CHANNEL EL.EVATION <br /> WITH L/R RATION OF LESS THAN 1604 HEWI7T AVENUE <br /> 200 MAX. • <br /> FREE SIDES RESTING ON 4 DIAGONAL BRACE WIRES ON 2ND FLOOR <br /> 2" CLOSURE ANGLE 8�--0" X 12'-0" GRID � U � MAX �VE(�ETT, WASHINGTON 98201 <br /> -��� Typ, ATTACH STRUT TO MAIN RUNNER <br /> WITH 1/4" MACHIN� BOLT <br /> NOTES: (AS REQUIRED BY I.B.C. ASTM C 635--636 CROSS RUNNER - <br /> 1. CEILING AREAS fXCEEDING 2,500 SF REQUIRE A BREAK VIA SEISMIC BRACE OR PAa1'ITION. MAIN RUNNER 1 1/2"x16 GA. HOT ROLLED <br /> 2. VERTICAL STRUT: A STRUT FASTENED TO THE MAIN RUNNER SHALL BE EXl'ENDED TO AND FASTENED MAIN RUNNER CHANNELS � + � <br /> TO THE S7RUCTURAL MEMBERS SUPPORTING THE FLOOR ABOVE. THE STRUT SHALL BE ADEQUATE TO DISTANCE FROM BRACING 4'-0" O.C. 1.12#/FT MIN. <br /> RESIS7 THE VERTICAL. COMPONENT INDUCED BY THE E3RACING W1RES. THE STRUT MAY BE STEEL STUD, WIRES 1'0 CCROSS • <br /> BLACK 1RON, EMT OR OTHER APPROVED EQUAL, (GOOD FOR UP TO 4'-0" HIGH). THE STRUTS SHALL RUNNERS „ <br /> BE PLAC�D IN 12'-0" X 12'-0" GRID WITH THE FIRST POINT WITHIN 6'-0" �ROM EACH WALL. 7/8 x26 GA. CROSS FURRING ACOUSTIC PANEL CEILING MAIN RUNNER <br /> NOTE: PROVIDE ACT SUSPENSION GRID TO COMPLY CHANNELS C�16° O.C. • <br /> WI7H 18C SECTION 1621 MINIMUM STANDARD PER <br /> SECTION 9.6 ASCE7. VERIFY REQUIREMENTS WITH <br /> CiTY OFFICIALS. GYPSUM BOARD <br /> 1 , : ; : <br /> AP� SEISMI� GRID SUSPENSION DIAG ACT SEIS�lI� SUSPENSI�N GYPSUM ��ARD CEILING FRAMiNG APC - SEISMIC COMPRES�ION STRUT <br /> A � <br /> r ir f �e r » � e u � ff f » � �� <br /> 0 1 -0 2 -0 3 -0 0 1 -0 2 -0 3 -0 0 3 6" 1' WEAVER ARCHITECTS, INC. <br /> 1411 FOURTH AVENUE, SUITE 810 � <br /> SEATTLE, WASHfNGTON 98101 <br /> P. 20b.262.9622 . <br /> T PARTITION AS SCEHDULED PARI'ITION AS SCEHDULED F. 206.262.9507 <br /> 2�f��� EQ' EQ MAIN RUNNER T-BAR AT TVJO MAIN RUNNER T-BAR AT TWO All reproduction & intellectual property rights reserved c 2o�s <br /> ADJACENT FREE ENDS ADJACENT FIXED ENDS <br /> o � <br /> `�' � � a CAN LIGHTS, SMOKE <br /> � DETECTORS, E�C. HANGER WIRE <br /> HANGER WIRE <br /> HV� C � � � � � <br /> t � <br /> HVAC 12" X 12" <br /> I � <br /> w <br /> ( � `� 3��� <br /> �., <br /> Professional szal <br /> � �Q. EQ. s.�a� <br /> � � I � REG(STERED� <br /> w ARCHITECT <br /> c� <br /> �LIGHT � w <br /> � � » ��� �,A ri NG ON <br /> � S �7E <br /> EQ. EQ. <br /> � <br /> ACOUSTICAL PANEL CEILING ACOUSTICAL PANEL 7/�9 j�� <br /> CEILING <br /> No. Issue Description Date <br /> � � POWDER DRIVEN FASTENERS 12" LEG 8 STRUCTURE - <br /> WALL ANGLE WALL ANGLE � 24" O.C. ATTACH W/ (2) POWDER UPDATED DD SET 01.25.16 <br /> SEE APC SEISMIC GRID SUSPENSION SYSTEM DIAGRAM FOR MORE INFO. SEE APC SEISMIC GRID SUSPENSION SYSTEM DIAGRAM �OR MORE IN�O. DRIVEN F'ASTENERS PER PRICING SET o3.a3.�s <br /> BRACE <br /> ACOUS PNL CLG ELEMENTS DIAG (2'x2') AP� WALL CONNEGTION AT FREE END APC WALL CONNE�TI�N AT FIXED EN � \ � / � I FINAL PRICING SE� 05.�9.,6 <br /> � , > > � <br /> � PERMIT SET 12.19.16 <br /> » >, , � �> » , <br /> n 2 � � 0 3 6 1 0 3 6 1 � / -4- � <br /> : : BOTTOM OF � � <br /> SYRUC7URE <br /> 8 GA. HANGER WIRES AT 4'-0" O.C. � GREATER THAN 4'-0" � NEW 12 GA. HANGER WIRE <br /> � SADDLED-TIED AROUND MAIN RUNNERS NEW DIRECT LOAD TO UNDERSIDE OF � <br /> CEILING CLIP TO STRUCTURAL DECK TO <br /> 5TRUCTURE SUSPEND NEW GRID SUPPORT WEIGHT OF <br /> � 1 1/2"X1 1/2° CONT. ANGLE � . � ' � v , , � '� " ' p D � a ' ' ' ` ` I BELOW SECONDARY GRID (CLOUD) <br /> a' � � , � , � � � ➢ • P � , <br /> EXISTING 12 GA. -- SUSPENDED Drawn oy: q�� Reviewed by: <br /> �12 DIAGONAL WIRE TIES � 12�-0" O.C. DUC7 OR OTHER OBSTRUCTION HANGER WIRES AT CEILING GRID & � <br /> EACH WAY EXISYING CEILING <br /> �'.:` � 2�� p GRID S HE ULEDLES AS � �, Project No: # 15-185-00 <br /> •: � 1 1/2 X16.GA. HQT ROLLED MAIN <br /> T..: � RUNNER CHANNELS AT 4'-0" �� 2-1/2"x20 GA. METAL STUDS <br /> O.C.-1.12�/Ff. MIN. � � BRACING ALTERNATING � 48" O.C. <br /> �.0.$GR8D -1 3/4 �— � �EIL,ING DETI�ILS � <br /> .;. <br /> 8 GA. SUSPENSION WIRE `V 2-1/2"x20 GA. MEfAL STUDS � 24" O.G <br /> TO STRUCTURE ASOVE <br /> '.�;;i.;.�;:�;:;��,�'�;;:r:::;:.::.::: <br /> :�''��::,;:'�;'":,�:��;�'�'_' <br /> ::.. <br /> .;;.• ;:.:..:... <br /> , •..•.[...�. <br /> .... <br /> •..� •. . .. :.. .:..... <br /> ... i.�,;-•... .. .. . . <br /> r.•:�•:'.:�,•::;..::>.::•:.:....:.............. ........... � , <br /> PROVIDE 1/4" �, NEW LED STRIP LIGHTING AS SCHEDULED W/ <br /> 5/8" GYP. BD. - THICK SHEATHING �^ <br /> — MIN. PAlR OF BACK TO � �- VOLT L{GHTING CH-007 ANGLED CHANNEL Original drawing �s 24" x 36". Scafe entities accordingly �t ��dU�zd <br /> 8" MAX. � BACK 1 1/4" C.R. CHANNELS � EXPOSED AREA OF _.-j _ <br /> � SADDLE-TIED CROSS FURRING TO MAIN SIZE PER LOAD & SPAN "' FRAMING & PAINT �= - - - - — — <br /> RUNNERS WITH 2 STRANDS OF 18 GA. TO MATCH SOFFIT , „ -f- -{- <br /> WIRE OR 1. STRAND OF 16 GA. WIRE � � � � � , „ n — — — <br /> d- (,: � — <br /> 8 GA. DIA. WIRE, TYP. � t8 -1 3 4 5/8 GWB, TYP. • . <br /> 8.0. END CAF' <br /> �:::�; . . „ <br /> . -- <br /> . . <br /> .. Permit Agency <br /> 7/8"X26 GA. CROSS FURRING CHANNELS ARMSTRONG WOODWORKS GRILLE AS SCHEDULED ' <br /> . AT 16" Q.C. (SEE A.2B.1 SPECIALTY CEILING) CORNER BEAD, 1`fP. NEW GWB CEILING AS SCHEDULED <br /> MAIN RUNNER <br /> � ARMSTRONG WOODWORKS GRILLE <br /> � PARTITION AS SCHEDULED _ 4�-0" O.C. (TYP.) � END CAP AROUND COMPLETE CLOUD F.T. SOLID BLOCKING <br /> PERIMETER <br /> �GYP � D CL� � EISMIC RESTRAINE �} END �// APC -� TRAPEZE � DUCT / OBSTRUCTION WOOD SLAT CLOUD � OPEN OFFICE SECTION � GWB SOFFIT <br /> � � „ „ , � � \ „ , „ <br /> ■ • 7f f ) � � <br /> 1/ f1 l � � _ <br /> 0 3 6 1 , 0 6 1 2 0 3 6 1 3 - 1 0 <br /> � 3�� 6„ �2» <br />