My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alta Planning + Design, Inc. 8/7/2018
>
Contracts
>
6 Years Then Destroy
>
2021
>
Alta Planning + Design, Inc. 8/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2018 9:39:21 AM
Creation date
8/10/2018 9:39:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alta Planning + Design, Inc.
Approval Date
8/7/2018
End Date
12/31/2021
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Bicycle Master Plan Support-On Call Services
Public Works WO Number
PW3688
Tracking Number
0001354
Total Compensation
$48,500.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br /> REIMBURSABLE EXPENSES <br /> Type of Expense Maximum Per Item Cumulative Maximum <br /> Parking actual cost $50.00 <br /> Meals N/A N/A <br /> Postage actual cost $ 50.00 <br /> Mileage $0.56 per mile $350.00 <br /> Reprographics actual cost plus 5% $ 50.00 <br /> TOTAL $500.00 <br /> Page 15 <br /> Alta Planning&Design 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.