My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> seek an adjustment. Contractor waives and is estopped from seeking an adjustment of <br /> Contract Sum or Contract Time where Contractor fails to keep and maintain cost, <br /> timekeeping, and scheduling records segregated and contemporaneously allocated to <br /> the subject work for which an adjustment is sought. For example, failure to keep <br /> contemporaneous labor and equipment time records specifically and only allocated to <br /> each item of claimed Extra Work shall constitute a waiver of any Contract Claim for <br /> reimbursement or additional Contract Time for each such item of Extra Work. The <br /> Contractor shall permit the City access to these and any other records needed for <br /> evaluating requests for additional Contract Time or Contract Sum. <br /> 1-04.6 Variation in Estimated Quantities <br /> Revise the first paragraph to read as follows: <br /> Payment to the Contractor will be made only for the actual quantities of Work performed <br /> and accepted in conformance with the Contract. When the accepted quantity of Work <br /> performed under a unit item varies from the original Proposal quantity, payment will be <br /> at the unit Contract price for all Work unless the total accepted quantity of any Contract <br /> item, adjusted to exclude added or deleted amounts included in change orders accepted <br /> by both parties, increases or decreases by more than 25 percent from the original <br /> Proposal quantity, and if the total extended bid price for that item at time of award is <br /> equal to or greater than 10 percent of the total contract price at time of award. In that <br /> case, payment for contract work may be adjusted as described in the Standard <br /> Specifications and modified in these Special Provisions. <br /> 1-04.7 Differing Site Conditions (Changed Conditions) <br /> Delete all of 1-04.7 and substitute the following: <br /> Upon discovery and before such conditions are disturbed, the Contractor shall promptly <br /> provide Notice to the City's Representative of: <br /> Pre-existing subsurface or latent physical conditions at the site differing materially <br /> from those indicated in this Contract, or <br /> Pre-existing unknown physical conditions at the site, of an unusual nature, differing <br /> materially from those ordinarily encountered and generally recognized as inhering <br /> in work of the character provided for in this Contract. <br /> If requested in writing by the Contractor and if the City's Representative finds that <br /> conditions are materially different and cause a material increase or decrease in the <br /> Contractor's cost of performance of the Work, or extends the duration of the critical path <br /> of the schedule, the City's Representative will make an adjustment of Contract Sum or <br /> Contract Time. Extensions of Contract Time will be evaluated in accordance with 1-08.3 <br /> PROGRESS SCHEDULE. <br /> However, if the parties are unable to agree on an adjustment of Contract Sum or Contract <br /> Time, the City's Representative will determine the amount of the adjustment of Contract <br /> Sum or Contract Time. If the City's Representative determines that differing site <br /> conditions do not exist or that no adjustment in Contract Sum or Contract Time is <br /> warranted, such determination shall be final. If there is a decrease in the cost or time <br /> required to perform the Work, failure of the Contractor to notify the City's Representative <br /> of the differing site condition shall not affect the City's right to make an adjustment in the <br /> Contract Sum or Contract Time. Additionally, no Contract Claim or adjustment of <br /> Contract Sum or Contract Time shall be allowed unless the Contractor has followed the <br /> procedures provided for in this Contract, including, but not limited to, furnishing timely <br /> Notice of the event and its effect on Contract Time and Contract Sum as required herein. <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-55 <br />