My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-06.1(5) Requests for Substitution <br /> (******) <br /> The City will not usually consider a substitution for material or Equipment specified by <br /> brand name or manufacturer or sole-sourced. <br /> Only the Contractor may offer materials or Equipment of equal or better quality and <br /> performance as a substitution for those specified. The Contractor shall make <br /> substitution offers in writing to the City's Representative in accordance with 1-05.3(1) <br /> SUBMITTALS of these Special Provisions. The substitution offer must include sufficient <br /> data to enable the City's Representative to assess the acceptability of the material or <br /> Equipment for the particular application and requirements. The City and City's <br /> Representative are not required or obligated to consider or review a request for <br /> substitution and may, in their sole discretion and option, consider or review such <br /> requests. <br /> If the offered substitution requires changes to or coordination with other portions of the <br /> Work, include, if any, drawings and details showing such changes. The Contractor <br /> agrees to perform these changes as part of the substitution of material or Equipment at <br /> no additional cost to the City. Approval of a substitution request will not relieve the <br /> Contractor from responsibility for the efficiency, quality, and performance of the <br /> substitute material or Equipment, in the same manner and degree as the material and <br /> Equipment originally specified. Reflect cost differential associated with a substitution in <br /> the offer. If the City approves the substitution, the Contract Documents will be modified <br /> by a Change Order modifying the Contract Sum in the amount of the cost differential. <br /> 1-06.2 Acceptance of Materials <br /> 1-06.2(2)B Financial Incentive <br /> Delete 1-06.2(2)B. <br /> 1-06.2(2)D Quality Level Analysis <br /> Delete 1-06.2(2)D. <br /> 1-06.3 Manufacturer's Certificate of Compliance <br /> Supplement 1-06.3 by adding the following: <br /> When authorized by the Standard Specifications or these Special Provisions and prior <br /> to use, the Engineer may accept certain Equipment on the basis of a Manufacturer's <br /> Certificate of Compliance as an alternate to Equipment inspection and testing. <br /> A Manufacturer's Certificate of Compliance shall be reserved for cases where <br /> compliance to Contract requirements is not readily determinable through inspection and <br /> testing of materials or Equipment. The Contractor shall provide properly authenticated <br /> documents to the City's Representative that the materials and Equipment comply with <br /> the Contract requirements. <br /> The Contractor shall pay all associated costs of providing each Manufacturer's <br /> Certificate of Compliance submitted for City acceptance. <br /> The City reserves the right to refuse to accept Equipment on the basis of a <br /> Manufacturer's Certificate of Compliance. <br /> 1-06.3(1) Inspection at Point of Manufacturing <br /> (******) <br /> The Contractor shall be responsible to reimburse the City for the costs of inspections at <br /> the point of manufacturing for inspections occurring outside of Whatcom, Skagit, Island, <br /> Snohomish, King, Pierce and Thurston counties. Costs to be paid or reimbursed by the <br /> Contractor include, but are not limited to, travel, subsistence, labor and lodging <br /> expenses of the City Inspector. <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.