My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> complying with these regulations or any other regulations listed above are included in <br /> the Contractor's Proposal. <br /> In cases of conflict between different safety regulations, the more stringent regulation <br /> shall apply. <br /> The Washington State Department of Labor and Industries shall be the sole and <br /> paramount administrative agency responsible for the administration of the provisions of <br /> the Washington Industrial Safety and Health Act of 1973 (WISHA). <br /> The Contractor shall maintain at the project site office, or other well-known place at the <br /> project site, all articles necessary for providing first aid to the injured. The Contractor <br /> shall establish, publish, and make known to all employees, procedures for ensuring <br /> immediate removal to a hospital, or doctor's care, persons, including employees, who <br /> may have been injured on the project site. Employees should not be permitted to work <br /> on the project site before the Contractor has established and made known procedures <br /> for removal of injured persons to a hospital or a doctor's care. <br /> The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of <br /> the Contractor's plant, appliances, and methods, and for any damage or injury resulting <br /> from their failure, or improper maintenance, use, or operation. The Contractor shall be <br /> solely and completely responsible for the conditions of the project site, including safety <br /> for all persons and property in the performance of the Work. This requirement shall <br /> apply continuously, and not be limited to normal working hours. The required or implied <br /> duty of the Engineer to conduct construction review of the Contractor's performance <br /> does not, and shall not, be intended to include review and adequacy of the Contractor's <br /> safety measures in, on, or near the project site. <br /> Supplement 1-07.1 by adding the following: <br /> 1-07.1(1) Noise <br /> Work within 500 feet of residential properties between the hours of 10:00 p.m. and 7:00 <br /> a.m. during weekdays and between the hours of 6:00 p.m. and 8:00 a.m. on weekends <br /> or holidays are subject to noise control requirements if the work generates decibel levels <br /> of greater than 55 db(A). Apply for a Noise Variance a minimum of 30 days prior to <br /> performing work and pay $100.00 application fee. Use the following link to obtain the <br /> latest information on noise variance requirements <br /> https://www.everettwa.gov/1547/Temporary-Noise-Variance-Requests. Typical <br /> requirements include, and not limited to, broadband backup alarms on all equipment <br /> requiring a backup alarm, anti-tail gate slamming devices, dump truck bed liners, and <br /> sawcutting, vacuum excavation, pavement breaking and loading export haul noise must <br /> be done after 7:00 a.m. Appendix E contains the City of Everett's Noise Ordinance for <br /> Bidder's reference. <br /> Approval to continue Work during these hours may be revoked at any time the Contractor <br /> exceeds the City's noise control regulations or complaints are received from the public <br /> or adjoining property owners regarding the noise from the Contractor's operation. The <br /> Contractor shall have no claim for damages or delays should such permission be <br /> revoked for these reasons. <br /> 1-07.2 State Sales Tax <br /> Delete 1-07.2 and substitute the following: <br /> 1-07.2(1) General <br /> The Washington State Department of Revenue has issued special rules on the State <br /> sales tax. Sections 1-07.2(1) through 1-07.2(4) are meant to clarify those rules. The <br /> Contractor should contact the Washington State Department of Revenue for answers to <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.