My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Copies of all endorsements naming City and all other entities listed in 1-07.18(2) of this <br /> section as Additional Insured(s), showing the policy number. The Contractor may submit <br /> a copy of a blanket additional insured clause from its policies instead of a separate <br /> endorsement. A statement of additional insured status on an ACORD Certificate of <br /> Insurance shall not satisfy this requirement. <br /> Other amendatory endorsements to show the coverage required herein. <br /> 1-07.18(5) Coverages and Limits <br /> The insurance shall provide the minimum coverages and limits set forth below. Providing <br /> coverage in these stated minimum limits shall not be construed to relieve the Contractor <br /> from liability in excess of such limits. All deductibles and self-insured retentions shall be <br /> disclosed and are subject to approval by the City. The cost of any claim payments falling <br /> within the deductible shall be the responsibility of the Contractor. <br /> 1-07.18(5)A Commercial General Liability <br /> A policy of Commercial General Liability Insurance, including: <br /> • Per project aggregate <br /> • Premises/Operations Liability <br /> • Products/Completed Operations — for a period of one year following <br /> final acceptance of the Work. <br /> • Personal/Advertising Injury <br /> • Contractual Liability <br /> • Independent Contractors Liability <br /> • Stop Gap/ Employers' Liability <br /> • Explosion, Collapse, or Underground Property Damage (XCU) <br /> • Blasting (only required when the Contractor's work under this Contract <br /> includes exposures to which this specified coverage responds) <br /> Such policy must provide the following minimum limits: <br /> $2,000,000 Each Occurrence <br /> $4,000,000 General Aggregate <br /> $2,000,000 Products & Completed Operations Aggregate <br /> $1,000,000 Personal &Advertising Injury, each offence <br /> Stop Gap / Employers' Liability <br /> • $1,000,000 Each Accident <br /> • $1,000,000 Disease - Policy Limit <br /> • $1,000,000 Disease - Each Employee <br /> 1-07.18(5)B Automobile Liability <br /> Automobile Liability for owned, non-owned, hired, and leased vehicles, with an MCS <br /> 90 endorsement and a CA 9948 endorsement attached if "pollutants" are to be <br /> transported. Such policy(ies) shall provide the following minimum limit: <br /> $2,000,000 combined single limit <br /> 1-07.18(5)C Workers' Compensation <br /> The Contractor shall comply with Workers' Compensation coverage as required by <br /> the Industrial Insurance laws of the state of Washington. <br /> 1-07.18(5)D Coverage for Working On, Over, or Near Navigable Waters <br /> If this Contract involves Work on or adjacent to navigable water, as defined by the <br /> U.S. Department of Labor, then the Contractor shall provide proof of insurance <br /> coverage in compliance with the statutory requirements of the U.S. Longshore and <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.