My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1. Determining the pro-rata amount of Overhead allocable to the subject project. <br /> This is accomplished by multiplying Overhead costs by the ratio of the subject <br /> project's billings to the Contractor's overall billings during the overall period of <br /> the subject Project's performance. The result is "Allocable Overhead." Any <br /> additional and unresolved direct cost claims presented by the Contractor <br /> concurrently with any request for Extended and/or Unabsorbed Overhead <br /> shall not be included in determining the ratio of the subject Project billings to <br /> overall Contractor billings for the period of project performance. <br /> 2. Determining the daily amount of Allocable Overhead for the subject Project. <br /> This is accomplished by dividing the Allocable Overhead for the subject <br /> Project by the number of days, (as contractually defined) of Contract <br /> performance. The result is the Daily Rate of Allocable Overhead. <br /> 3. Determining the gross amount of potential additional compensation for Home <br /> Office Overhead due to the project extension. This is accomplished by <br /> multiplying the Daily Rate of Allocable Overhead by the number of days of <br /> project extension caused solely by the City. This results in the Gross Amount <br /> of Additional Home Office Overhead Compensation. <br /> 4. Adjusting the Gross Amount of Additional Home Office Overhead <br /> Compensation for any additional contribution for Overhead received by the <br /> Contractor on any Change Orders that are being presented and resolved <br /> concurrently with the subject calculation for Unabsorbed and/or Extended <br /> Home Office Overhead. The necessary adjustment would be to reduce the <br /> Gross Amount of Additional Home Office Overhead Compensation by any <br /> additional compensation for Overhead included in any direct cost claims <br /> being resolved concurrently with any claim for Extended and/or Unabsorbed <br /> Home Office Overhead. <br /> Contractor shall not receive compensation for cost of use of equity capital. <br /> 1-09.5 Deleted or Terminated Work <br /> Delete the first paragraph, beginning with "The Engineer may delete", and the second <br /> paragraph, beginning with "Payment for completed items", and substitute the following: <br /> The City's Representative may delete Work as provided in 1-04.4 CHANGES or may <br /> terminate the Contract in whole or part as provided in 1-08.10(2) TERMINATION FOR <br /> PUBLIC CONVENIENCE. When the Contract is partially terminated for the City's <br /> convenience, the partial termination shall be treated as a deductive Change Order for <br /> payment purposes under this section. <br /> Payment for completed items will be at contract unit prices or pursuant to the Schedule <br /> of Values. <br /> Delete the fourth paragraph, beginning with "Contract Time", and the fifth paragraph, <br /> beginning with "Acceptable Materials", and substitute the following: <br /> Acceptable materials ordered by the Contractor prior to the date the Work was <br /> terminated or deleted will either be purchased from the Contractor by the City at the <br /> actual cost and shall become the property of the City, or the City will reimburse the <br /> Contractor for the actual costs of returning these materials to the suppliers. <br /> If Contractor disagrees with the adjustment of Contract Sum determined by the City's <br /> Representative, Contractor may submit a Contract Claim for the difference between the <br /> amount determined by the City's Representative and the amount sought by the <br /> Contractor. <br /> Contractor shall not be entitled to any anticipated profits on deleted, terminated, or <br /> uncompleted Work will be allowed. <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.