GENERAL NOTES-WINDOW REPLACEMENT (SLIDING GLASS DOOR SIMILAR)
<br /> 1. KEEP EXISTING SHEATHING AND MATERIALS DRY BEFORE INSTALLING NEW MATERIALS .
<br /> 2. ALL INSTALLATIONS REQUIRE MOCK UP REVIEWS PRIOR TO INSTALLATION.
<br /> 3. ALTERNATE INSTALLATION METHODS REQUIRE MOCK-UP REVIEW BY WRB MANUFACTURER REPRESENTATIVE AND -� � 1 1
<br /> ARCHITECT PRIOR TO FULL SCALE INSTALLATION. MOCK UP MAY BE PERFORMED"IN-PLACE"ON PROJECT. '] 7'] ']
<br /> 4. ALL MATERIALS AND FASTENERS USED FOR INSTALLATION MUST BE SUBMITTED TO ARCHITECT FOR APPROVAL
<br /> BEFORE PROCEEDING WITH REPAIR.
<br /> 5. NEW SELF ADHERED FLASHING(SAF)SHALL BE BUTYL BASED MATERIAL TYPICALLY..
<br /> 6. SAF SHALL BE ADHERED OVER PRIMER AND PRESSED TIGHT WITH J-ROLLER. Copyright OO 2017 All rights reserved.
<br /> 7, WEATHER RESISTANT BARRIER MATERIAL AND INSTALLATION SHALL BE INSTALLED AS AN"AIR BARRIER"SYSTEM INSTALL BED OF CONTINUOUS SEALANT AROUND J2 Building Consultants, Inc.
<br /> AND BE INSTALLED PER MANUFACTURER'S REQUIREMENTS FOR 10 YEAR WARRANTY. ENTIRE BACK ANGLE TERMINATIONS FOR AIR AND
<br /> 8. SEALANTS SHALL BE AS REQUIRED BY WRB MANUFACTURER TO MEET 10 YEAR WARRANTY REQUIREMENTS. WATER BARRIER SEAL. PROVIDE EXTRA AT SILL TO
<br /> i JAMB INTERSECTION. (AFTER SETTING WINDOW
<br /> � REMOVE SEALANT FROM WINDOW TO BACK ANGLE 8425 44th Ave W
<br /> 6�� � INTERFACES TO��FINSH��CLEAN CONDITION�. Mukilteo, Washington 98275
<br /> M�N. �,�,` � Tel 425.774.5600
<br /> , `� � Fax 425.774.5661
<br /> ' www.J2Consultants.com
<br /> .�, ,
<br /> \, �
<br /> �
<br /> SELF ADHERED FLASHING � �— INSTALL CONTINUOUS BEAD OF SEALANT OVER BACK
<br /> i ANGLE STOP-BEFORE INSTALLING WINDOW THICK The undersigned has provided building
<br /> (SAF)AT HEAD TYPICAL (
<br /> i COATING enclosure documents that in my professional
<br /> �.,, � � judgement are appropriate to satisfy the
<br /> '� requirements of RCW 64.55.005 through
<br /> ��\ i 64.55.090
<br /> � WALL SHEATHING � i INSTALL PVC SHIMS AT SILL TO ALLOW DRAINAGE PATH
<br /> � UNDER WINDOW SILL AND LEVEL WINDOW. CONFIRM
<br /> � SELF ADHERED FLASHING i WITH WINDOW MANUFACTURER FOR SUPPORT
<br /> (SAF)AT JAMBS TYP ��'�'�'�'�''�`'�`'��`'� � REQUIREMENTS
<br /> . �:•c.. � yl,� .
<br /> .::' ' '...i+. � ...:. \ �. .
<br /> ��r.c •:.':.S:•..:. � �� � �, � 11948
<br /> REGISTERED
<br /> . � �i � ARCHITECT
<br /> ��'� � :::�i.: �, �
<br /> ,, 5/8"24 GA.BACK ANGLES AT � �`�� � '��
<br /> 9 APPLY BEAD OF SEALANT PRIOR TO � '�'�'������,
<br /> M�N JAMBS AND HEAD • �
<br /> SETTING JAMB AND HEAD PRE-STRIPS � ''�'�� `'��� \ ` �
<br /> �'� ��'' �� RICHARD T. NERO
<br /> � .:. .
<br /> .•::•::::::::.•.., •.
<br /> �— PROVIDE 314"24 GA.SILL BACK .,r. �:�::3 `; �. STATE OF WASHINGTON
<br /> � "'``,_,�... ANGLE(L FACING OUT) Z ' �— INSTALL FLEXIBLE SAF OR CORNER :::::::.:::.:::::;;...;.:.� .:' `�� '�,,"
<br /> � : � � ��i; BOOTS OVER STRAIGHT FLASH AND `�, .� � '.�,, � � �`�;
<br /> � ao UP BACK ANGLES . .� , �'�
<br /> :Zru:: .W€ `':•!v' . ...r �\
<br /> ..,;:k;`.i3':� •�-
<br /> °� '`"'`'`'"n�'�" ` ' STRAIGHT FLASH AT SILL PAN ..��''"�"'��� .. �
<br /> x:..o.
<br /> �. ; EXISTING SILL Fz•'�' ` �`"
<br /> ,..�....
<br /> w.......: .......::�::�a:... ::.:�.. EXTEND UP BACK ANGLE.
<br /> w;u:'s�ry;�w_n�:.. �
<br /> ;:�;,..�':
<br /> �r���:.......T»�.: ;�...,,�` �;...
<br /> �;:�•�»:::;;:._,.�,...':',.....
<br /> .��.,..r,• w
<br /> �::::::.:::::::::::::::::.:.
<br /> +,,.:;::::�i�'�i.:::::::::::. ::.::.7!t`:�;"..•:•:: .
<br /> ATTACH WITH STAPLES OR AS �'�' > => "���'�'<y- ��'
<br /> -:::.::::::.::... _
<br /> -:::::::::::::.-::::.. _ _ ,
<br /> ::.:::::::::::::::::::::::..
<br /> ..:�:.:::.::.:.::.:..:...::. ::::.:. ,...:;;:;:;.�;:..;:.;:;:.:..:;:�, .x. N TE :
<br /> REQUIRED BY VARIOUS '� � INSERT 1116"PVC HORSESHOE
<br /> ;::.:r.::::::::::::::::::::::::::..
<br /> ....;:::�:::.:>:.:::::.::::::::::::::. :::::::::.::�:::..
<br /> 1. CONTRACTOR IS
<br /> BUILDING TYPES SHIMS BEHIND SILL FLANGE TO
<br /> d, ALLOW FOR DRAINAGE. RESPONSIBLE FOR
<br /> Z �; FIELD VERIFICATION OF
<br /> � 6''M�N SIZING AND QUANTITIES
<br /> INSTALL WRB PRE FLASH AT SILL- � READY FOR WINDOW INSTALL OF ALL COMPONENTS.
<br /> DO NOT ATTACH LOWER 6"EDGE
<br /> 2. SUBMITTAL ARE
<br /> AT THIS STEP 8��M�N REQUIRED PRIOR TO
<br /> ENLARGED WINDOW SILL INSTALLATION OF ANY
<br /> NEW MATERIALS.
<br /> 3. MOCK UP REVIEW OF
<br /> B, FLANGED WINDOW INSTALLATION STEP 1 B2 FLANGED WINDOW INSTALLATION STEP 2 c2 FLANGED WINDOW INSTALLATION STEP 3 02 FLANGED WINDOW INSTALLATION STEP 4 ALL EXTERIOR
<br /> W3.1 N.T,S.(16) W3.1 N.T.S.(16) W3.1 N.T.S.(16) W3.1 N.T.S.(16) ASSEMBLIES REQUIRED
<br /> BEFORE INSTALLATION
<br /> Revisions:
<br /> �
<br /> WINDOW INSTALL FOR WINDOW INSTALL FOR
<br /> FLANGED WINDOW ONLY FLANGED WINDOW ONLY
<br /> INSTALLATION OF FIELD WRB
<br /> INSTALL 4"SAF OVER MEMBRANES SHALL LAP 6"AT�
<br /> LEG OF METAL HEAD HORIZONTAL AND 12"AT
<br /> FLASHING(OR PROVIDE VERTICAL
<br /> SEALANT AT WRB
<br /> APPLY BUTYL SAF OVER FLANGES: OVERLAP-PER MOCK
<br /> ' UP APPROVAL TAPE OR CAULK FIELD
<br /> 1
<br /> FIRST TO JAMB FLANGES MEMBRANE OVERLAP TO
<br /> . .:_. ,
<br /> THEN SECOND APPLY BUTYL SAF
<br /> METAL HEAD FLASHING AND
<br /> ....... ... ::.::. ....... �:•.;:�::::::::.. ... ::.:. ... ..:::.�.::.�.�.�:::.�.�.�.�:.�..�
<br /> :,,>•:•�=:�,r. . AT HEAD FLANGES OVER JAMB �.�:::.�: ��::.::: . :•::�:::� ..::::::•:::::.. •�::.�::. :.�:.:�.�:.�.�.�.�::::...
<br /> APPLY SEALANT TO ��:. � — _ '� � JAMB FLASHING OVERLAP
<br /> ;� SAM�.
<br /> INSTALL PRE-FINISHED
<br /> HEAD AND JAMB ;� METAL HEAD FLASHING
<br /> FLANGES PRIOR TO � � •� DO NOT APPLY SAF OVER SILL WITH FOLDED END DAMS Pro ect Title:
<br /> INSTALLATION I � � FLANGE ROLL TO ACTIVATE �
<br /> � � ADHESIVE NAUTICA CONDOMINIUMS
<br /> BUILDING A-505 & 506 DECKS
<br /> � a TAPE FIELD MEMBRANE 2824 GRAND AVENUE
<br /> MIN • OVERLAP TO JAMB WRAP EVERETT WA 98201
<br /> � .
<br /> FLASHING
<br /> ���\ � INSTALL FIELD :�:::::::::
<br /> AT INTERIOR: ������������� �
<br /> �.�'��:�: MEMBRANES,FROM �t,,.'��:.
<br /> .
<br /> •i TOOL SEALANT BEAD AT BACK ANGLE "•�''> BOTTOM TO TOP. " '�'`'
<br /> INTERIOR ALTERNATES: "SHINGLE-STYLE" FOR AIR BARRIER TAPE ALL —�
<br /> TYPICALLY. :�^:: HORIZONTAL OVER-LAPS Sheet Title:
<br /> ...�
<br /> • :::::�.�:.�::
<br /> .... �:.�.�.�.�.:�:
<br /> • IF NO BACK ANGLES,INSTALL ��:'����:.� - W I N DOW/S L I D I N G
<br /> CONTINUOUS BACKER ROD& `r�p �.����,���:,,
<br /> � � SEALANT AT JAMBS AND HEAD) �F \��`'1���� ��� G LAS S D 00 R
<br /> ��ti ��:.,���.�..�:�:�:
<br /> �� ������ INSTALL SEQUENCE
<br /> �/ • IF NO WRAPS,INSTALL NEW GYP ��8ry '��'
<br /> 1 ANDIOR WOOD WINDOW WRAPS ���� `\��.,,\`
<br /> /- TO MATCH EXISTING �
<br /> /-�'" INSTALL WRB UNDER SILL � �
<br /> "� LIFT UP WRB PRE STRIP FLASHING,TAPE HORIZONTAL \�.\ Scale:
<br /> INSERT 1116"PVC HORSESHOE AT SILL TO INSERT JUNCTIONS FOR AIR-BARRIER
<br /> SECURE WINDOW AS PER WINDOW MANUFACTURER'S SHIMS BEHIND SILL FLANGE TO FIELD WRB CONTINUITY.
<br /> RECOMMENDATIONS. (TYPICALLY EVERY OTHER NAIL FLANGE ALLOW FOR DRAINAGE.
<br /> PERMIT SET
<br /> HOLE AROUND ALL SIDES OF WINDOWS.) INSTALL FASTENERS
<br /> NO CLOSER THAN 3"TO NOR MORE THAN 10"TO CORNERS FOLDED UNBROKEN END DAM
<br /> Issue Date: Sheet Number:
<br /> A4 FLANGED WINDOW INSTALLATION STEP 5 B4 FLANGED WINDOW INSTALLATION STEP 6 ca FLANGED WINDOW INSTALLATION STEP 7 D3 FLANGED WINDOW INSTALLATION STEP 8 D4 FLANGED WINDOW INSTALLATION STEP 9 05115117
<br /> W3.1 N.T.S.(16) W3.1 N.T,S.(16) W3.1 N.T.S.(16) W3.1 N.T.S.(16) W3.1 N.T.S.(16) Job#: W3 .O
<br /> 0580208