My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 738-80
>
Ordinances
>
Ordinance 738-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2018 9:57:31 AM
Creation date
8/24/2018 9:57:29 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
738-80
Date
10/29/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 7,0"1- se) <br /> AN ORDINANCE amending Section 2 and 9 of <br /> Ordinance No. 630-79 , creating a special con- <br /> struction fund entitled "1979 Block Grant Neigh- <br /> borhood Improvement Fund No. 333" , as amended by <br /> Ordinance Nos. 667-80 and 719-80 reallocating the <br /> Lowell Neighborhood Improvements appropriation of <br /> $100, 000. <br /> NOW, THEREFORE, BE IT ORDAINED BY THE EVERETT CITY COUNCIL THAT: <br /> Section 1 : That Sections 2 and 9 of Ordinance No. 630-79 , as <br /> amended by Ordinance No. 667-80 and 719-80 which read as follows: <br /> Section 2 : Authorization is hereby given to provide for the <br /> development of contract plans, specifications and detailed cost <br /> estimates and construction required to provide the following: <br /> A. Riverside Neighborhood Improvements - (as amended by Riverside <br /> residents on October 30 ,1979) : <br /> 1 . Overlay Cedar, 19th to 21st, widen an install curbs <br /> both sides. There is an additional $400 of funds <br /> from the 1978 Block Grant Neighborhood Improvements <br /> Fund No. 329 , Program 718 , Work Order 713 . <br /> (Estimated Cost: $50 , 000) <br /> 2 . For mailing and copying expenses for Greater Riverside <br /> Organization (G.R.O. ) meetings. This will be paid for <br /> from 1978 Block Grant Neighborhood Improvements Fund <br /> No. 329 , Program 718 , Work Order 714 . <br /> (Cost: $300) <br /> 3 . Replace sections of sidewalks on Highland between <br /> 23rd and Everett Avenue. <br /> (Estimated Cost: $12 , 797) <br /> 4 . Install drainage tile on 2400 block of Highland and on <br /> Walnut between 21st and 22nd. <br /> (Estimated Cost: $6 , 000) <br /> B. Port Gardner Highborhood Improvements : <br /> 1. Complete any 1978 Port Gardner Neighborhood projects <br /> which were approved by City Council in 1978 but cannot <br /> be completed with 1978 Port Gardner Block Grant funds, <br /> up to a maximum of $10 , 000. <br /> 2 . Two reflective tape crosswalk signs on the north sides <br /> of the 35th and Hoyt intersection and the 36th and <br /> Hoyt intersection. <br /> (Estimated Cost: $300) <br /> 3 . Improvements on 35th from Hoyt to Rucker up to a maxi- <br /> mum of $33 , 000 in the following priority: <br /> a. curbs and gutters on north and south sides <br /> (1) <br />
The URL can be used to link to this page
Your browser does not support the video tag.