My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction 8/23/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Faber Construction 8/23/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2018 11:14:55 AM
Creation date
8/28/2018 11:14:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction
Approval Date
8/23/2018
Council Approval Date
8/22/2018
End Date
6/4/2018
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Sewer Regulators R4 & R39 Modifications
Public Works WO Number
UP3633
Tracking Number
0001376
Total Compensation
$1,155,037.44
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT CITY <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> CONTRACTOR: Faber Construction ADDRESS: 131 East Grove Street <br /> CITY: Lynden STATE: WA 98264 DATE: June 4, 2018 <br /> PROJECT TITLE: Sewer Regulators R4 & R39 Modifications <br /> WORK ORDER NO. UP 3633 <br /> DATE WORK COMPLETE: May 11, 2018 FINAL AMOUNT: $1,155,037.44 <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> unders .nd he same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> which I p:y ha e, arising out of the performan e of said contract, which are not set forth in said estimate. <br /> X �� X Itagti1 <br /> CO ' ! TOR TITLE j NA , <br /> Fabe onstruction -,` M.A0oo <br /> Subscribed and sworn to before • <br /> .0 S• TAR yin' <br /> me this 99' day s Q2v/� •• e <br /> X Notary Public %( '• UBI <br /> in and o the State of Washington, residing at 11.7,1 It? V1 . <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final APPROVED Date: $' 1.4 14 <br /> estimate to be based upon actual <br /> measurements�� and to be true and correct. <br /> X ifsh✓ .��cL X acttalvA6(ewAL.% <br /> Construction Manager Utilities Director <br /> Tom Fuchs Paul Kaftanski <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 9/94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.