My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 8/23/2018
>
Contracts
>
6 Years Then Destroy
>
2019
>
Perteet Inc 8/23/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2018 11:22:50 AM
Creation date
8/28/2018 11:22:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
8/23/2018
Council Approval Date
8/22/2018
End Date
12/31/2019
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Provide Civil Engineering Services
Public Works WO Number
PW3640
Tracking Number
0001377
Total Compensation
$339,618.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT DOWNTOWN STREETSCAPE IMPROVEMENT — RUCKER AVE. <br /> Agreement with Perteet Inc. July 16, 2018 <br /> 3.2 Access Design and Exhibits: <br /> The Consultant will prepare up to two (2) alternative access and ingress/egress <br /> designs for consideration of the property owner and the City. The Consultant <br /> will prepare Exhibits to be used for review and approval and explanation of the <br /> access and ingress/egress movements. The Consultant will perform a site visit to <br /> assess existing site features and access concerns. <br /> Assumptions: <br /> • The City will schedule meetings with property owner. <br /> • This work element does not include topographic survey of site features on the <br /> private property. If it is determined that additional site features must be <br /> surveyed to prepare a design solution, this will be considered an additional <br /> service and may be prepared by the Consultant for supplemental fee to this <br /> Agreement. <br /> Deliverables: <br /> • Exhibits of alternative access layouts. <br /> Task 4 - Utility Coordination <br /> The Consultant will coordinate with franchise utilities along the corridor in an effort to <br /> identify and possibly avoid utility conflicts. <br /> The following franchise utilities have facilities within the project limits as previously <br /> identified: <br /> • Frontier — Telephone <br /> • Snohomish County PUD — Power <br /> • Puget Sound Energy — Gas <br /> • Comcast — Cable (not currently shown on topographic base map, however will <br /> contact as a confirmation) <br /> Page 8 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.