My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 8/23/2018 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2018
>
Perteet Inc 8/23/2018 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2018 11:25:27 AM
Creation date
8/28/2018 11:25:25 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
8/23/2018
Council Approval Date
8/22/2018
End Date
12/31/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Streetscape Design
Public Works WO Number
PW3553
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Additional Scope of Work <br /> Everett Downtown Streetscape Improvements <br /> Hoyt Avenue from Pacific Avenue to Wall Street <br /> Description <br /> The Scope of Work for this amendment to the agreement is for services requested by the <br /> City of Everett. The additional work is required due to changes in the existing <br /> streetscape and adjacent building sites since the 90% design phase was completed. <br /> Additional Scope of Work <br /> This amendment includes the following additional services for plans for the Hoyt Avenue <br /> block as needed including: <br /> • Curb return grade adjustments, sidewalk grade adjustments, and roadway cross <br /> slope adjustments at the intersection of Hoyt and Pacific to conform with recent <br /> work completed there. <br /> • Detailed back of sidewalk analysis of the interface with the adjacent private <br /> property features and updating the construction documents accordingly. <br /> • Revise the design and construction documents to accommodate recent changes at <br /> the Children's Museum which have occurred since the 90%design phase. <br /> • Prepare the streetscape work on Hoyt Avenue for the purpose of bidding the work <br /> concurrently with the Rucker Streetscape project bid documents. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.