My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/08/22 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/08/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 10:43:22 AM
Creation date
8/30/2018 10:41:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT DOWNTOWN STREE I SCAPE IMPROVEMENT — RUCKER AVE. ; 2. <br /> Agreement with Pei-feet Inc. July 16, 2018 <br /> • Propose & Review (3) alternatives including "no trellis" design with city and <br /> select final concept to develop further. <br /> • Propose & Review final preferred alternative design with City. <br /> • Develop preferred alternative to 90% design. <br /> Deliverables: <br /> • (3) Draft concept alternatives (including no trellis alternative) handouts, <br /> drawings, plans, views, Up to (2) sheets per alternative. <br /> • Final concept handouts, drawings, plans, views. Up to (2) sheets. <br /> • Preliminary cost estimate <br /> Task 7 — Revised 90% Roadway Design & PS&E Preparation <br /> The Phase 1 Rucker and Hoyt 90% design will be separated into a stand-alone Rucker <br /> Avenue PS&E set. This portion will be reviewed and revised based on comments and <br /> direction from the City on the Phase 1 90% design. The Consultant will parse the <br /> project sheets from the previous 90% submittal for the complete project. The <br /> Consultant will prepare 90% contract plans, specifications and opinion of cost estimate <br /> for the proposed roadway improvements. <br /> PS&E design and preparation will be based on the following standards: <br /> • City of Everett "Design and Construction Standards and Specifications for <br /> Development", current edition as published on the City website; <br /> • City of Everett "Stormwater Management Manual', 2017 version; <br /> o AASHTO guidance "A Policy on Geometric design of Highways and Streets", 2011; <br /> o WSDOT "Standard Specifications for Road, Bridge, and Municipal Construction", <br /> 2018 edition; <br /> • Plan sheets will prepared based on City of Everett Public Works Survey & CADD <br /> Standards, using Autodesk Civil 3D 2016 or newer; <br /> Page 12 Scope of Services <br /> 109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.