My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/08/22 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/08/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 10:43:22 AM
Creation date
8/30/2018 10:41:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT DOWNTOWN STREETSCAPE IMPROVEMENT — RUCKER AVE. <br /> Agreement with Perteet Inc. July 16, 2018 <br /> The Plans will include a Hot Mix Asphalt (HMA) and Portland Cement Concrete <br /> (PCC) roadway section as bid alternatives. This will include a PCC jointing plan. <br /> This work element will include the addition of storm water infrastructure <br /> connections for future use. It is anticipated these additions will include storm <br /> drain manholes near the intersections of Wall Street, Hewitt Ave and California <br /> Street. The purpose of these manholes will be for easy connections by others <br /> (on the west side) in the future. <br /> This work dement will include the review and coordination of the 41st <br /> Street/West Marine View Drive design plans at the intersection of Rucker Avenue <br /> and Pacific Avenue to match project limits and improvements. The Consultant <br /> will revise the design at this intersection to accommodate improvements for the <br /> other project <br /> At the intersection of Rucker Ave and Wall Street, the design and plans will be <br /> revised to include the removal of the existing concrete signal poles/foundations <br /> and replacement with new poles and foundations. <br /> This work element assumes a new urban design concept may replace the existing <br /> trellis concept and the design, plans, and details will have to be revised <br /> • appropriately. <br /> Review of 90% Submittal/Response to Comments: This task will include the <br /> Consultants review of the City's 90% PS&E review comments based upon the <br /> Phase 1 90% Plans. The Consultant will attend one review meeting with the City <br /> staff, and provide a written response to the City's comments. <br /> 7.2 Preparation of 90% Specifications: • <br /> The Consultant will prepare the technical specifications based upon the <br /> specifications prepared in the previous completed phase of work. The Consultant <br /> will update the special provisions and amendments to be consistent with the <br /> 4 <br /> Page 141 1 1 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.