My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/08/22 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/08/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 10:43:22 AM
Creation date
8/30/2018 10:41:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT DOWNTOWN STREETSCAPE IMPROVEMENT — RUCKER AVE. <br /> Agreement with Perteet Inc. July 16, 2018 <br /> Task 10 — Environmental and Land Use Permitting <br /> During phase 1 design of this project, the SEPA Checklist was prepared and submitted, <br /> with a Notice of Planned Action Determination being issued on April 27, 2010. Some <br /> historic and cultural resources research was also performed which will be used to support <br /> some of the documentation efforts described below <br /> This work element will consist of the following task: <br /> 10.1 Cultural Resources: <br /> The presence of the State funding will require a Historic & Cultural Resources <br /> Review Form EZ1 to meet the requirements of Executive Order 05-05. The <br /> Consultant will prepare the Form F71, including an area of potential effect (APE) <br /> memorandum, and submit to the City for submittal to the Department of <br /> Archaeology and Historic Preservation (DAHP). The Consultant will review the <br /> previous historic and cultural resources research documentation and use this as <br /> the basis of supporting documentation. <br /> Assumptions: <br /> • It is assumed that the City will provide the Consultant with one set each of <br /> written compiled comments from the City staff for the EZ1 form, and for the <br /> APE form. <br /> • One round of City review comments have been budgeted. <br /> • The City is responsible for all permit fees. <br /> • No critical areas are present. <br /> • An NPDES Notice of Intent will not be required for this project, as less than <br /> one acre of land disturbance will occur. <br /> • <br /> If it is determined that additional permitting or support documents are, <br /> needed based on DAHP or Tribal review, this will be considered an additional <br /> service and may be prepared by the Consultant for a supplemental fee to this <br /> Agreement. <br /> Page 20 1 1 7 Scope of Serv[ces <br />
The URL can be used to link to this page
Your browser does not support the video tag.