My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/08/22 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/08/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 10:43:22 AM
Creation date
8/30/2018 10:41:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• EVERETT CITY COUNCIL AGENDA HEM COVER SHEET 2 3 <br /> PROJECT TITLE: <br /> Amendment No. 2 to the Briefing COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Public Works <br /> Agreement with Perteet,Inc. for Consent Contact Person Ryan Sass <br /> Engineering and Preparation of Action Phone Number (425)257-8942 <br /> Bid Documents for the First Reading FOR AGENDA OF August. 22,2018 <br /> Downtown Streetscape Second Reading <br /> Improvements Phase 2 -Hoyt Third Reading <br /> Avenue,Pacific Avenue to Wall Public Hearing <br /> Street Budget Advisory Initialed by: <br /> Department Head <br /> Administration <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Hoyt Avenue from Amendment No. 1 Proposed Amendment Public Works <br /> Pacific to Wall Street 12/6/2017 <br /> , Amount Budgeted $ 674,520 <br /> Expenditure Required $ 33,863 Account Number(s): PW 3553 <br /> Budget Remaining -0- <br /> Additional Required $ 640,657 <br /> DETAILED SUMMARY STATEMENT: <br /> Perteet,Inc. is currently under contract with the City for the preparation of bid documents for the Downtown <br /> Streetscape Phase 2 project. The project was designed,a call for bids was authorized, and bids were opened <br /> in April. Only one bid was received and on May 23rd, Council rejected the bid. <br /> Another project,the Downtown Streetscape Improvements Phase 3 -Rucker Avenue (Pacific Avenue to <br /> Everett Avenue), is approaching completion of final bid documents. The Public Works Department <br /> recommends adding the Hoyt Streetscape project as a separate bid schedule to the Phase 3 project. The <br /> intent is to bid both projects (Phase 2 and Phase 3) as a single bid package to attain a more competitive <br /> bidding environment. <br /> Amendment No. 2 will engage Perteet,Inc. to make several final design revisions and incorporate the Phase <br /> 2 project into a single bid package that contains separate bid schedules for the Phase 2 work and the Phase 3 <br /> work in order to comply with grant reporting requirements. This amendment adds $33,863.00 to the <br /> Professional Services Agreement. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Amendment No. 2 to the Professional Services Agreement with Perteet, Inc. for <br /> engineering and preparation of bid documents for the Downtown Streetscape Improvements Phase 2—Hoyt <br /> Avenue,Pacific Avenue to Wall Street for an amountiNto exceed$33,863.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.