My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/08/22 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/08/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 10:43:22 AM
Creation date
8/30/2018 10:41:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERI'lkICATION <br /> CONTRACTOR: Faber Construction ADDRESS: 131 East Grove Street <br /> CITY: Lynden STA 1E: WA 98264 DA LE: June 4, 2018 <br /> PROJECT TITLE: Sewer Regulators R4&R39 Modifications <br /> WORK ORDER NO. UP 3633 <br /> DATE WORK COMPLEI'B: May 11,2018 FINAL AMOUNT: $1,155,037.44 <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> unders d the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> which I ha,e, arising out of the performance of aid contract,which are not set forth in said estimate. <br /> X A X Nil <br /> Dig-- <br /> CO v TOR TITLE N' `�� <br /> fi <br /> Fab• onstruction k4 <br /> ` SIONLe. .. t, <br /> Subscribed and sworn to before ; ��TA/43% o <br /> me this 9 day g-- .,v/g '♦•�- �' i <br /> X Notary Public if w,� p BL G 2 <br /> in and o the State of Washington,residing at L�N9a +�7,�:`�.•C�T_20. <br /> 4.0 <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final APPROVED Date: & ht <br /> estimate to be based upon actual <br /> measurements and to be true and correct. <br /> X "2,,W. Xl <br /> 4;‘.44„..„ <br /> Construction Manager Utilities Director <br /> Tom Fuchs Paul Kaftanski <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 9/94 <br /> 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.