My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/08/22 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/08/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 10:43:22 AM
Creation date
8/30/2018 10:41:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET �' 2 <br /> PROJECT TITLE: <br /> Professional Services Briefing COUNCIL BILL# <br /> Agreement with Perteet, Inc. for Proposed Action Originating Department Public Works <br /> final design engineering and Consent Contact Person Ryan Sass <br /> preparation of bid documents X Action Phone Number 425.257-8942 <br /> for Downtown Streetscape First Reading FOR AGENDA OF August 22, 2018 <br /> Improvements Phase 3 —Rucker Second Reading <br /> Avenue (Pacific Avenue to Third Reading <br /> Everett Avenue) Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> Administration <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Rucker Avenue from Ordinance No 3485-16 Proposed Professional Public Works <br /> Pacific to Everett Approved 3/2/2016 Services Agreement <br /> Amount Budgeted $ 7,629,502 <br /> Expenditure Required $ 339,618 Account Number(s): PW 3640 <br /> Budget Remaining $ 7,289,884 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Downtown Streetscape Phase 3 —Rucker Avenue project includes roadway,sidewalk,illumination, <br /> traffic signal,pedestrian, streetscape, and ADA improvements to Rucker Avenue from Pacific Avenue to <br /> Everett Avenue in accordance with the Downtown Everett Streetscape Plan. This project design was <br /> prepared by Perteet,Inc., and developed to a 60-90%level in 2011. <br /> This professional services agreement is for final completion of design engineering and the preparation of bid <br /> documents for Downtown Streetscape Phase 3 —Rucker Avenue (Pacific Avenue to Everett Avenue) for an <br /> amount not to exceed$339,618.00. <br /> The funding sources for this project are: <br /> Transportation Improvement Board(TIB) grant $4,103,982 <br /> CIP 4 $ 3,525,520 <br /> Total $ 7,629,502 <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign the Professional Services Agreement with Perteet, Inc. for final design and <br /> preparation of bid documents for Downtown Streetscape Phase 3—Rucker Avenue,Pacific Avenue to <br /> Everett Avenue for an amount not to exceed$339,61::t.$. <br />
The URL can be used to link to this page
Your browser does not support the video tag.