My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/08/22 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/08/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 10:43:22 AM
Creation date
8/30/2018 10:41:30 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/22/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERT:I I DOWNTOWN STREETSCAPE IMPROVEMENT — RUCKER AVE. <br /> Agreement with Perteet Inc. July 16, 2018 <br /> Exhibit "A" <br /> Scope of Services <br /> City of Everett <br /> Everett Downtown Streetscape Improvement <br /> Rucker Avenue from Pacific Avenue to Everett Avenue <br /> Final Design <br /> INTRODUCTION <br /> This project involves completion of the City of Everett's Rucker Avenue Streetscape <br /> Improvement project that was previously prepared and shelved at the 90% design level. <br /> This Scope of Services is to prepare environmental documents along with final Plans, <br /> Specifications and Opinion of Costs (PS&E) for the section of Rucker Avenue between <br /> the intersections of Pacific Avenue and Everett Avenue, one and one-half adjacent <br /> blocks Wall Street, and one-half block of California Street. This 'project also includes <br /> water main replacement between Pacific and Everett Avenue which will be designed and <br /> PS&E prepared by the City. The improvements will include roadway improvements, <br /> utility improvements, urban design features, landscaping, stakeholder coordination. and <br /> environmental documentation. The project is funded with City funding and State <br /> Transportation Improvement Board (TIB) grant funds. Specific work elements for the <br /> project will include the following: <br /> Task 1 - Project Management <br /> Task 2 -Topographical Surveying & Basemapping <br /> Task 3 - Property Owner Coordination <br /> Task 4 - Utility Coordination <br /> Task 5 - Water Main PS&E Coordination <br /> Page 1 98 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.