DRAWING INDEX
<br /> Plan Check No.: M1407-039
<br /> Job Address: 1700 13TH ST 2ND FLOOR
<br /> N/ 1 GENERAL NOTES AND DRAWING INDEX M2.104 INPATIENT CARE UNIT- LEVEL 10 - SECTOR D - PLUMBING M4.51 FUTURE INPATIENT CARE UNIT- LEVEL 5 - SECTOR A - HVAC M6.30 INVASIVE PROCEDURE - LEVEL 3 - FIRE PROTECTION Owner: PROVIDENCE GEN MED CTR
<br /> M0.02 MECHANICAL LEGEND M2.106 INPATIENT CARE UNIT- LEVEL 10 - SECTOR F - PLUMBING M4.52 FUTURE INPATIENT CARE UNIT- LEVEL 5 - SECTOR B - HVAC M6.40 MECHANICAL - LEVEL 4- FIRE PROTECTION Tenant: SURGERY
<br /> Application Date: 7/24/2014
<br /> M0.03 EQUIPMENT SCHEDULES M2.101R ROOF LEVEL- SECTOR A - PLUMBING M4.53 FUTURE INPATIENT CARE UNIT- LEVEL 5 - SECTOR C- HVAC M6.50 FUTURE INPATIENT CARE UNIT- LEVEL 5 - FIRE PROTECTION Proposed Use: HOSPITAL
<br /> M0.04 EQUIPMENT SCHEDULES M2.102R ROOF LEVEL- SECTOR B - PLUMBING
<br /> M4.54 FUTURE INPATIENT CARE UNIT- LEVEL 5 - SECTOR D - HVAC M6.60 INPATIENT CARE UNIT- LEVEL 6 - FIRE PROTECTION Type of work: HVAC DUCT WORK&HEAT PUMP
<br /> \iPM0.05 EQUIPMENT SCHEDULES M2.103R ROOF LEVEL- SECTOR C- PLUMBING M4.56 FUTURE INPATIENT CARE UNIT- LEVEL 5 - SECTOR F - HVAC
<br /> M0.06 EQUIPMENT SCHEDULES M6.80 INPATIENT CARE UNIT- LEVEL 7 - FIRE PROTECTION Office Set Job Set Fire/Planning Set
<br /> M2.104R ROOF LEVEL- SECTOR D - PLUMBING M4.61 INPATIENT CARE UNIT- LEVEL 6 - SECTOR A - HVAC M6.80 INPATIENT CARE UNIT- LEVEL 8 - FIRE PROTECTION Reviewed For Permit: Date_ By:
<br /> M0.07 EQUIPMENT SCHEDULES M2.106R ROOF LEVEL- SECTOR F - PLUMBING M4.62 INPATIENT CARE UNIT- LEVEL 6 - SECTOR B - HVAC M6.90 FUTURE INPATIENT CARE UNIT- LEVEL 9 - FIRE PROTECTION
<br /> VM0.08 EQUIPMENT SCHEDULES M2.102MR UPPER ELEVATOR MACHINE ROOM - SECTOR B - PLUMBING M4.63 INPATIENT CARE UNIT- LEVEL 6 - SECTOR C - HVAC M6.100 INPATIENT CARE UNIT- LEVEL 10- FIRE PROTECTION
<br /> M0.09 EQUIPMENT SCHEDULES
<br /> M2.102UR UPPER ROOF LEVEL - SECTOR B - PLUMBING M4.64 INPATIENT CARE UNIT- LEVEL 6 - SECTOR D - HVAC M6.100R ROOF LEVEL - FIRE PROTECTION
<br /> M0.10 EQUIPMENT SCHEDULES M3.01B SUPPORT SERVICES- LEVEL B - SECTOR A- MEDICAL GAS PIPING M4.66 INPATIENT CARE UNIT- LEVEL 6 - SECTOR F - HVAC M7.01 MECHANICAL- LEVEL 4- ISOMETRIC (FOR REFERENCE ONLY) 1/.
<br /> (73
<br /> M0.11 EQUIPMENT SCHEDULES M3.02B SUPPORT SERVICES - LEVEL B - SECTOR B - MEDICAL GAS PIPING M4.71 INPATIENT CARE UNIT- LEVEL 7 - SECTOR A - HVAC M7.02 MECHANICAL - LEVEL 4- SECTIONS (FOR REFERENCE ONLY) 4✓
<br /> ,M0.12 EQUIPMENT SCHEDULES " (�
<br /> M3.04B SUPPORT SERVICES- LEVEL B - SECTOR D - MEDICAL GAS PIPING M4.72 INPATIENT CARE UNIT- LEVEL 7 - SECTOR B - HVAC M7.03 SECTIONS y.;
<br /> M0.13 EQUIPMENT SCHEDULES M3.056 SUPPORT SERVICES - LEVEL B - SECTOR E - MEDICAL GAS PIPING M4.73 INPATIENT CARE UNIT- LEVEL 7 - SECTOR C HVAC QJ
<br /> M7.04 TYPICAL BATHROOMS- PARTIAL PLANS- PLUMBING (]a �,
<br /> M0.14 EQUIPMENT SCHEDULES ` M3.01 EMERGENCY SERVICES- LEVEL G - SECTOR A - MEDICAL GAS PIPING M4.74 INPATIENT CARE UNIT- LEVEL 7 - SECTOR D - HVAC ( P 1r . U.'M0.15 EQUIPMENT SCHEDULES h15 SO �mMAM7.05 STAIR 1 SECTION AND PARTIAL PLANS r d_
<br /> r
<br /> M3.02 EMERGENCY SERVICES - LEVEL G - SECTOR B - MEDICAL GAS PIPING M4.76 INPATIENT CARE UNIT- LEVEL 7 - SECTOR F- HVAC P e'r L' ` ' `i�-,-t`
<br /> M7.06 STAIR 2 SECTION AND PARTIAL PLANS �J--�11#�,� i orf:
<br /> 4,„1,„
<br /> M0.16 EQUIPMENT SCHEDULES M3.03 EMERGENCY SERVICES- LEVEL G - SECTOR C - MEDICAL GAS PIPING M4.81 INPATIENT CARE UNIT- LEVEL 8- SECTOR A - HVAC M7.07 STAIR 3 SECTION AND PARTIAL PLANS
<br /> �Po .i
<br /> M0.17 EQUIPMENT SCHEDULES iIV%,
<br /> �'e.kM3.04 EMERGENCY SERVICES - LEVEL G - SECTOR D - MEDICAL GAS PIPING M4.82 INPATIENT CARE UNIT- LEVEL 8- SECTOR B - HVAC M7.08 STAIR 4 SECTION AND PARTIAL PLANS
<br /> M0.18 EQUIPMENT SCHEDULESV M3.05 EMERG - -ENCY SERVICES LEVEL G SECTORE MEDICAL GAS PIPING M4.83 INPATIENT CARE UNIT- LEVEL 8- SECTOR C- HVAC M7.09 STAIR 7 SECTION AND PARTIAL PLANS
<br /> M0.19 EQUIPMENT SCHEDULES M3.06 EMERGENCY SERVICES - LEVEL G - SECTOR F - MEDICAL GAS PIPING M4.84 INPATIENT CARE UNIT- LEVEL 8- SECTOR D - HVAC M7.10 EXISTING HOSPITAL- PARTIAL FIRST FLOOR PLANS - DEMOLITION
<br /> ` AND MECHANICAL EVERETT,WASHINGTON
<br /> M0.20 EQUIPMENT SCHEDULES S "ed�� �1�ly M3.12 DIAGNOSTIC IMAGING- LEVEL 1 - SECTOR B - MEDICAL GAS PIPING M4.86 INPATIENT CARE UNIT- LEVEL 8- SECTOR F - HVACM0.21 EQUIPMENT SCHEDULES M3.13 DIAGNOSTIC IMAGING- LEVEL 1 - SECTOR C - MEDICAL -
<br /> C L GAS PIPING M4.91 FUTURE INPATIENT CARE UNIT- LEVEL 9 - SECTOR A - HVAC M8.01 DIAGRAMS DOMESTIC HOT WATER HEATING SYSTEM AND DOMESTIC
<br /> M0.22 EQUIPMENT SCHEDULES M3.14 DIAGNOSTICWATER SERVICE ti�
<br /> G1JNS�
<br /> IMAGING - LEVEL 1 - SECTOR D - MEDICAL GAS PIPING M4.92 FUTURE INPATIENT CARE UNIT- LEVEL 9 - SECTOR B - HVAC M8.02 DIAGRAMS- STEAM SYSTEM AND HOT WATER HEATING SYSTEM `�
<br /> V410.23 EQUIPMENT SCHEDULES M3.15 DIAGNOSTIC IMAGING- LEVEL 1 - SECTOR E - MEDICAL GAS PIPING M4.93 FUTURE INPATIENT CARE UNIT- LEVEL 9 - SECTOR C- HVAC 4'
<br /> M8.03 DIAGRAMS- CHILLED WATER AND PROCESS CHILLED WATER PIPING N
<br /> M0.24 EQUIPMENT SCHEDULES M3.16 DIAGNOSTIC IMAGING - LEVEL 1 - SECTOR F- MEDICAL GAS PIPING M4.94 FUTURE INPATIENT CARE UNIT- LEVEL 9 - SECTOR D - HVACzGF..c2
<br /> M0.25 EQUIPMENT SCHEDULES M3.17 EXISTING HOSPITAL FLOOR PLANS - LEVELS B, 1 AND 2- SECTOR G - MEDICAL GAS PIPING M4.96 FUTURE INPATIENT CARE UNIT- LEVEL 9 - SECTOR F- HVAC M8.04 DIAGRAM - HEAT RECOVERY PIPING N
<br /> M0.26 EQUIPMENT SCHEDULES M3M8.05 DIAGRAM - SYSTEM AIRFLOW :y..17d EXISTING HOSPITAL FLOOR PLAN - LEVEL 1 - SECTOR G - MEDICAL GAS PIPING DEMOLITION M4.101 INPATIENT CARE UNIT- LEVEL 10 - SECTOR A - HVAC M8.06 DIAGRAM - SYSTEM AIRFLOW
<br /> M0.27 EQUIPMENT SCHEDULES M3.21 SURGERY- LEVEL 2 - SECTOR A - MEDICAL GAS PIPING M4.102 INPATIENT CARE UNIT- LEVEL 10 - SECTOR B - HVAC yfrEC'tS ti`,
<br /> M0.28 EQUIPMENT SCHEDULES M8.07 DIAGRAM - PROCESS CHILLED WATER RISER
<br /> M3.22 SURGERY- LEVEL 2 - SECTOR B - MEDICAL GAS PIPING M4.103 INPATIENT CARE UNIT- LEVEL 10 - SECTOR C - HVAC
<br /> M0.29 EQUIPMENT SCHEDULESM8.08 DIAGRAM - DOMESTIC WATER RISER
<br /> Q M3.23i Maw n
<br /> SURGERY- LEVEL 2 - SECTOR C - MEDICAL GAS PIPING M4.104 INPATIENT CARE UNIT- LEVEL 10 - SECTOR D - HVAC Portland s�krk Loa Awa/Waa868,,tDc
<br /> 1 M0.30 EQUIPMENT SCHEDULES M8.09 DIAGRAM - STEAM, CONDENSATE AND HOT WATER HEATING RISER
<br /> Arc'
<br /> 3.24 SURGERY- LEVEL 2 - SECTOR D - MEDICAL GAS PIPING M4.106 INPATIENT CARE UNIT- LEVEL 10- SECTOR F- HVAC
<br /> 2 M0.31 EQUIPMENT SCHEDULES 3.25 SURGERY- LEVEL 2 - SECTOR E - MEDICAL GAS PIPING M4.101R ROOF LEVEL - SECTOR A - HVAC M8.10 DIAGRAM - CHILLED WATER RISER 925 Fourth Ave.,Suite 2400
<br /> M8.11 DIAGRAM - WASTE AND VENT PLUMBING RISER Seattle,Washington 98104
<br /> M0.32 EQUIPMENT SCHEDULES V M3.26 SURGERY- LEVEL 2 - SECTOR F- MEDICAL GAS PIPING M4.102R ROOF LEVEL - SECTOR B - HVAC
<br /> 4 M0.33 EQUIPMENT SCHEDULES M3M8.12 DIAGRAM - WASTE AND VENT PLUMBING RISER (PH)206 623 9414
<br /> .27d EXISTING HOSPITAL FLOOR PLAN - LEVEL 2 - SECTOR G - MEDICAL GAS PIPING DEMOLITION M4.103R ROOF LEVEL - SECTOR C - HVAC (FAX)206 623 7868
<br /> M1.00 SITE PLAN M8.13 DIAGRAM - WASTE AND VENT PLUMBING RISER
<br /> M3.31 INVASIVE PROCEDURE- LEVEL 3 - SECTOR A - MEDICAL GAS PIPING M4.104R ROOF LEVEL - SECTOR D - HVAC
<br /> M8.14 DIAGRAM - WASTE AND VENT PLUMBING RISER
<br /> M2.01F SUPPORT SERVICES - FOUNDATION - SECTOR A - PLUMBING M3.32 INVASIVE PROCEDURE - LEVEL 3 - SECTOR B - MEDICAL GAS PIPING M4.106R ROOF LEVEL SECTOR F- HVAC consultants
<br /> M2.02F SUPPORT SERVICES - FOUNDATION - SECTOR B - PLUMBING M9.01 DETAILS
<br /> M3.33 INVASIVE PROCEDURE - LEVEL 3 - SECTOR C - MEDICAL GAS PIPING M5.01B SUPPORT SERVICES - LEVEL B - SECTOR A - HVAC PIPING M9.02 DETAILS LIFE SAFETY
<br /> M2.03F SUPPORT SERVICES - FOUNDATION - SECTOR C - PLUMBING M3.34 INVASIVE PROCEDURE - LEVEL 3 - SECTOR D - MEDICAL GAS PIPING M5.02B SUPPORT SERVICES - LEVEL B - SECTOR B - HVAC PIPING ROLF JENSEN&ASSOCIATES
<br /> M9.03 DETAILS 19125 North Creek Parkway Suite 120
<br /> M2.04F SUPPORT SERVICES - FOUNDATION - SECTOR D - PLUMBING
<br /> M3.35 INVASIVE PROCEDURE - LEVEL 3 - SECTOR E - MEDICAL GAS PIPING M5.03B SUPPORT SERVICES - LEVEL B - SECTOR C - HVAC PIPING /vIg,04 DETAILS Bothell,Washington 98011
<br /> M2.05F SUPPORT SERVICES - FOUNDATION - SECTOR E- PLUMBING M3.36 INVASIVE PROCEDURE - LEVEL 3 - SECTOR F - MEDICAL GAS PIPING M5.04B SUPPORT SERVICES - LEVEL B - SECTOR D - HVAC PIPING 'Y
<br /> M2.06F SUPPORT SERVICES - FOUNDATION - SECTOR F - PLUMBING ,,,,19.05 DETAILS CIVIL ENGINEER
<br /> M3.41 MECHANICAL- LEVEL 4 - SECTOR A - MEDICAL GAS PIPING M5.05B SUPPORT SERVICES - LEVEL B - SECTOR E- HVAC PIPING M9.06 DETAILS - AIR HANDLERS
<br /> M2.01B SUPPORT SERVICES - LEVEL B - SECTOR A - PLUMBING Magnusson Klemencic Associates
<br /> M3.42 MECHANICAL- LEVEL 4- SECTOR B - MEDICAL GAS PIPING M5.06B SUPPORT SERVICES - LEVEL B - SECTOR F- HVAC PIPING 1301 Fifth Avenue,Suite 3200
<br /> M9.07 DETAILS - AIR HANDLERS Seattle,Washington 98101-2699
<br /> M2.02B SUPPORT SERVICES- LEVEL B - SECTOR B - PLUMBING
<br /> M3.43 MECHANICAL- LEVEL 4 - SECTOR C - MEDICAL GAS PIPING M5.01 EMERGENCY SERVICES - LEVEL G - SECTOR A- HVAC PIPING M9.08 DETAILS - AIR HANDLERS
<br /> M2.03B SUPPORT SERVICES - LEVEL B - SECTOR C - PLUMBING M3.51 FUTURE INPATIENT CARE UNIT- LEVEL 5- SECTOR A - MEDICAL GAS PIPING M5.02 EMERGENCY SERVICES- LEVEL G - SECTOR B - HVAC PIPING LANDSCAPE ARCHITECT
<br /> M2.046 SUPPORT SERVICES- LEVEL B- SECTOR D - PLUMBING M10.01 DDC CONTROL DIAGRAMS
<br /> M3.52 FUTURE INPATIENT CARE UNIT- LEVEL 5- SECTOR B - MEDICAL GAS PIPING M5.03 EMERGENCY SERVICES- LEVEL G- SECTOR C - HVAC PIPING Site Workshop
<br /> M2.05B SUPPORT SERVICES- LEVEL B - SECTOR E- PLUMBING 1/ 10.02 DDC CONTROL DIAGRAMS 927 Post Alley
<br /> M3.53 FUTURE INPATIENT CARE UNIT- LEVEL 5- SECTOR C- MEDICAL GAS PIPING M5.04 EMERGENCY SERVICES- LEVEL G- SECTOR D - HVAC PIPING Seattle,Washington 98101
<br /> M2.066 SUPPORT SERVICES- LEVEL B- SECTOR F- PLUMBING M10.03 DDC POINTS LIST
<br /> M3.61 INPATIENT CARE UNIT- LEVEL 6 - SECTOR A - MEDICAL GAS PIPING M5.05 EMERGENCY SERVICES- LEVEL G - SECTOR E- HVAC PIPING M10.04 DDC POINTS LIST
<br /> M2.07B SUPPORT SERVICES- LEVEL B - SECTOR H - PLUMBING M3.62 INPATIENT CARE UNIT- LEVEL 6 - SECTOR B - MEDICAL GAS PIPING M5.06 EMERGENCY SERVICES- LEVEL G- SECTOR F - HVAC PIPING STRUCTURAL ENGINEER
<br /> M2.01 EMERGENCY SERVICES- LEVEL G - SECTOR A - PLUMBING M3.63 �M10.05 DDC SEQUENCE OF OPERATION (AIR-SIDE) 301g nusson Fifth Avenue,KleSuiteAssociates INPATIENT CARE UNIT- LEVEL 6 - SECTOR C - MEDICAL GAS PIPING M5.11 DIAGNOSTIC IMAGING- LEVEL 1 - SECTOR A- HVAC PIPING ,.10 06 DK E� E E OF OPERATION WET-SIDE
<br /> M2.02 EMERGENCY SERVICES- LEVEL G- SECTOR B- PLUMBING /© (WET-SIDE) Seattle,Washington 98101-2699
<br /> M3.64 INPATIENT CARE UNIT- LEVEL 6 - SECTOR D - MEDICAL GAS PIPING M5.12 DIAGNOSTIC IMAGING - LEVEL 1 - SECTOR B- HVAC PIPING V M10.07 SPECIFICATIONS
<br /> M2.03 EMERGENCY SERVICES- LEVEL G- SECTOR C- PLUMBING M3.66 INPATIENT CARE UNIT- LEVEL 6 - SECTOR F- MEDICAL GAS PIPING M5.13 DIAGNOSTIC IMAGING - LEVEL 1 - SECTOR C- HVAC PIPING MECHANICAL ENGINEER
<br /> M2.04 EMERGENCY SERVICES- LEVEL G- SECTOR D- PLUMBING M3.71 INPATIENT CARE UNIT- LEVEL 7 - SECTOR A - MEDICAL GAS PIPING M5.14 DIAGNOSTIC IMAGING - LEVEL 1 - SECTOR D - HVAC PIPING l'� CDi Engineers
<br /> y.f. 19203 36th Ave.W,Suite 200
<br /> M2.05 EMERGENCY SERVICES - LEVEL G- SECTOR E - PLUMBING M3.72 INPATIENT CARE UNIT- LEVEL 7 - SECTOR B - MEDICAL GAS PIPING M5.15 DIAGNOSTIC IMAGING- LEVEL 1 - SECTOR E - HVAC PIPING '3 Lynnwood,Washington 98036
<br /> M2.06 EMERGENCY SERVICES- LEVEL G- SECTOR F- PLUMBING M3.73 INPATIENT CARE UNIT- LEVEL 7 - SECTOR C - MEDICAL GAS PIPING M5.16 DIAGNOSTIC IMAGING- LEVEL 1 - SECTOR F- HVAC PIPING ' 7Dp..
<br /> ELECTRICAL ENGINEER
<br /> DIAGNOSTIC IMAGING- LEVEL 1 - SECTOR A - PLUMBING M3.74 INPATIENT CARE UNIT- LEVEL 7- SECTOR D - MEDICAL GAS PIPING M5.21 SURGERY- LEVEL 2 - SECTOR A - HVAC PIPING SPARLING
<br /> M2.12 DIAGNOSTIC IMAGING - LEVEL 1 - SECTOR B - PLUMBING M3.76 INPATIENT CARE UNIT- LEVEL 7- SECTOR F- MEDICAL GAS PIPING M5.22 SURGERY- LEVEL 2- SECTOR B- HVAC PIPING i 720 Olive Way,Suite 1400
<br /> s t r M e aVi lit C Seattle,Washington 98101-1853
<br /> M2.13 DIAGNOSTIC IMAGING= LEVEL 1 - SECTOR C - PLUMBING M3.81 INPATIENT CARE UNIT- LEVEL 8- SECTOR A - MEDICAL GAS PIPING M5.23 SURGERY- LEVEL 2 - SECTOR C- HVAC PIPING zolik 2vvi ,co�
<br /> 2.14 DIAGNOSTIC IMAGING LEVEL 1 - SECTOR D - PLUMBING
<br /> M3.82 INPATIENT CARE UNIT- LEVEL 8- SECTOR B - MEDICAL GAS PIPING M5.24 SURGERY- LEVEL 2- SECTOR D - HVAC PIPING GENERAL CONTRACTOR
<br /> 2.15 DIAGNOSTIC IMAGING - LEVEL 1 - SECTOR E - PLUMBING M.A.Mortensen Company
<br /> / M3.83 INPATIENT CARE UNIT- LEVEL 8- SECTOR C- MEDICAL GAS PIPING M5.25 SURGERY- LEVEL 2 - SECTOR E- HVAC PIPING 14719 N.E.29th Place
<br /> �/ M2.6 DIAGNOSTIC IMAGING - LEVEL 1 - SECTOR F- PLUMBING M3.84 INPATIENT CARE UNIT- LEVEL 8- SECTOR D - MEDICAL GAS PIPING VM5.26 SURGERY- LEVEL 2- SECTOR F- HVAC PIPING in ' Bellevue,Washington 98007
<br /> M2.17 EXISTING HOSPITAL FLOOR PLAN - LEVEL 1 - SECTOR G- PLUMBING M3.86 INPATIENT CARE UNIT- LEVEL 8- SECTOR F MEDICAL GAS PIPING M5.27 EXISTING HOSPITAL FLOOR PLAN - LEVEL - - got? V��
<br /> 2 SECTOR
<br /> G HVAC PIPING
<br /> M2.17d EXISTING HOSPITAL FLOOR PLAN - LEVEL 1 - SECTOR G - PLUMBING DEMOLITION M3.91 FUTURE INPATIENT CARE UNIT- LEVEL 9 - SECTOR A - MEDICAL GAS PIPING M5.27d EXISTING HOSPITAL FLOOR PLAN - LEVEL 2 - SECTOR G - HVAC PIPING DEMOLITION Revisions
<br /> M2.21 SURGERY- LEVEL 2 - SECTOR A - PLUMBING M3.92 FUTURE INPATIENT CARE UNIT- LEVEL 9- SECTOR B - MEDICAL GAS PIPING M5.31 INVASIVE PROCEDURE - LEVEL 3 - SECTOR A - HVAC PIPING
<br /> M2.22 SURGERY- LEVEL 2 - SECTOR B - PLUMBING M3.93 FUTURE INPATIENT CARE UNIT- LEVEL 9- SECTOR C- MEDICAL GAS PIPING M5.32 INVASIVE PROCEDURE - LEVEL 3 - SECTOR B - HVAC PIPING
<br /> DOCUMENT RELEASE 09 11/03/08
<br /> M2.23 SURGERY- LEVEL 2 - SECTOR C - PLUMBING M3.101 INPATIENT CARE UNIT- LEVEL 10 - SECTOR A - MEDICAL GAS PIPING M5.33 INVASIVE PROCEDURE - LEVEL 3 - SECTOR C - HVAC PIPING
<br /> DOCUMENT RELEASE 11 02/09/09
<br /> M2.24 SURGERY- LEVEL 2 - SECTOR D - PLUMBING M3.102 INPATIENT CARE UNIT- LEVEL 10 - SECTOR B - MEDICAL GAS PIPING M5.34 INVASIVE PROCEDURE - LEVEL 3 - SECTOR D - HVAC PIPING
<br /> VM2.25 SURGERY- LEVEL 2 - SECTOR E - PLUMBING DOCUMENT RELEASE 13 03/09/09
<br /> M3.103 INPATIENT CARE UNIT- LEVEL 10- SECTOR C - MEDICAL GAS PIPING M5.35 INVASIVE PROCEDURE - LEVEL 3 - SECTOR E- HVAC PIPING
<br /> M2.26 SURGERY- LEVEL 2 - SECTOR F- PLUMBING M3.104 INPATIENT CARE UNIT- LEVEL 10- SECTOR D - MEDICAL GAS PIPING M5.36 INVASIVE PROCEDURE- LEVEL 3- SECTOR F- HVAC PIPING WORK CHANGE PROPOSAL 025.1 12/18/09
<br /> M2.27 EXISTING HOSPITAL FLOOR PLAN - LEVEL 2 - SECTOR G - PLUMBING M3.106 INPATIENT CARE UNIT- LEVEL 10- SECTOR F- MEDICAL GAS PIPING M5.41 MECHANICAL- LEVEL 4- SECTOR A - HVAC PIPING GENERAL NOTES WORK CHANGE PROPOSAL 025.2 1/04/10
<br /> M2.27d EXISTING HOSPITAL FLOOR PLAN - LEVEL 2 - SECTOR G - PLUMBING DEMOLITION M4.01B SUPPORT SERVICES - LEVEL B - SECTOR A - HVAC M5.42 MECHANICAL- LEVEL 4- SECTOR B - HVAC PIPING 1. THE MECHANICAL SYSTEM SHALL CONSIST OF ALL WORK SHOWN ON DRAWINGS, 0 WORK CHANGE PROPOSAL 025.3 1/11/10
<br /> M2.31 INVASIVE PROCEDURE - LEVEL 3- SECTOR A- PLUMBING M4.02B SUPPORT SERVICES - LEVEL B - SECTOR B - HVAC M5.43 MECHANICAL- LEVEL 4- SECTOR C- HVAC PIPING DIAGRAMS, AND AS DESCRIBED IN SPECIFICATIONS.
<br /> ® WORK CHANGE PROPOSAL 025.4 2/01/10
<br /> M2.32 INVASIVE PROCEDURE- LEVEL 3 - SECTOR B - PLUMBING M4.03B SUPPORT SERVICES - LEVEL B - SECTOR C - HVAC M5.44 MECHANICAL- LEVEL 4- SECTOR D - HVAC PIPING 2. INSTALL ALL MECHANICAL WORK AS HIGH AS POSSIBLE, TIGHT TO STRUCTURE ABOVE. , WORK CHANGE PROPOSAL 145 06/02/14
<br /> M2.33 INVASIVE PROCEDURE - LEVEL 3 - SECTOR C- PLUMBING M4.04B SUPPORT SERVICES - LEVEL B - SECTOR D - HVAC M5.45 MECHANICAL- LEVEL 4- SECTOR E - HVAC PIPING 3. THE MECHANICAL PLANS ARE DIAGRAMMATIC IN NATURE AND DO NOT ATTEMPT
<br /> M2.34 INVASIVE PROCEDURE- LEVEL 3 - SECTOR D - PLUMBING M4.05B SUPPORT SERVICES - LEVEL B - SECTOR E - HVAC M5.46 MECHANICAL - LEVEL 4- SECTOR F- HVAC PIPING TO SHOW ALL REQUIRED OFFSETS. REFER TO ARCHITECTURAL AND STRUCTURAL
<br /> DRAWINGS FOR CONSTRUCTION DETAILS.
<br /> M2.35 INVASIVE PROCEDURE - LEVEL 3 - SECTOR E - PLUMBING M4.06B SUPPORT SERVICES - LEVEL B - SECTOR F- HVAC M5.51 FUTURE INPATIENT CARE UNIT- LEVEL 5 - SECTOR A - HVAC PIPING
<br /> M2.364. ITEMS NOTED "TYPICAL"OR "TYP"ON ANY SHEET APPLY TO THAT PARTICULAR SHEET.
<br /> INVASIVE PROCEDURE - LEVEL 3 - SECTOR F- PLUMBING
<br /> M4.01 EMERGENCY SERVICES- LEVEL G - SECTOR A - HVAC M5.52 FUTURE INPATIENT CARE UNIT- LEVEL 5 - SECTOR B - HVAC PIPING
<br /> M2.41 MECHANICAL- LEVEL 4- SECTOR A - PLUMBING M4.02 EMERGENCY SERVICES - LEVEL G - SECTOR B - HVAC M5.53 FUTURE INPATIENT CARE UNIT- LEVEL 5 - SECTOR C - HVAC PIPING 5. COORDINATE WITH SPECIFICATIONS. IN CASE OF CONFLICT BETWEEN SPECIFI-
<br /> CATIONS AND DRAWINGS THE MORE STRINGENT SHALL APPLY.
<br /> M2.42 MECHANICAL- LEVEL 4- SECTOR B - PLUMBING M4.03 EMERGENCY SERVICES- LEVEL G - SECTOR C - HVAC M5.56 FUTURE INPATIENT CARE UNIT- LEVEL 5 - SECTOR F- HVAC PIPING 6. PROVIDE NEC CODE MINIMUM HORIZONTAL AND VERTICAL WORKING CLEARANCES
<br /> M2.43 MECHANICAL- LEVEL 4- SECTOR C - PLUMBING M4.04 EMERGENCY SERVICES - LEVEL G- SECTOR D - HVAC M5.61 INPATIENT CARE UNIT- LEVEL 6 - SECTOR A- HVAC PIPING FOR ALL ELECTRICAL PANELS AND EQUIPMENT. OFFSET MECHANICAL WORK AS CLOSEOUT PRINTING 04/01/12
<br /> M2.44 MECHANICAL - LEVEL 4- SECTOR D - PLUMBING M4.05 EMERGENCY SERVICES- LEVEL G - SECTOR E - HVAC M5.62 INPATIENT CARE UNIT- LEVEL 6 - SECTOR B - HVAC PIPING REQUIRED.
<br /> M2.45 MECHANICAL- LEVEL 4- SECTOR E - PLUMBING M4.06 EMERGENCY SERVICES - LEVEL G- SECTOR F- HVAC M5.63 INPATIENT CARE UNIT- LEVEL 6 - SECTOR C- HVAC PIPING 7. COORDINATE ALL MECHANICAL WORK WITH THAT OF OTHER TRADES TO INSURE
<br /> M2.46 MECHANICAL- LEVEL 4- SECTOR F - PLUMBING M4.11 DIAGNOSTIC IMAGING - LEVEL 1 - SECTOR A- HVAC M5.64 INPATIENT CARE UNIT- LEVEL 6 - SECTOR D - HVAC PIPING PROPER AND ADEQUATE INTERFACE OF THEIR WORK WITH THE WORK OF THIS
<br /> CONTRACTOR. PROVIDE COORDINATED SHOP DRAWINGS PRIOR TO FABRICATION Drawing Title
<br /> M2.51 FUTURE INPATIENT CARE UNIT- LEVEL 5- SECTOR A - PLUMBING M4.12 DIAGNOSTIC IMAGING - LEVEL 1 - SECTOR B - HVAC M5.66 INPATIENT CARE UNIT- LEVEL 6 - SECTOR F- HVAC PIPING AND INSTALLATION. GENERAL NOTES AND
<br /> M2.52 FUTURE INPATIENT CARE UNIT- LEVEL 5- SECTOR B - PLUMBING M4.13 DIAGNOSTIC IMAGING - LEVEL 1 - SECTOR C- HVAC M5.71 INPATIENT CARE UNIT- LEVEL 7 - SECTOR A- HVAC PIPING 8. MECHANICAL EQUIPMENT SHALL NOT BE USED FOR TEMPORARY HEAT DURING DRAWING INDEX
<br /> M2.53 FUTURE INPATIENT CARE UNIT- LEVEL 5- SECTOR C- PLUMBING M4.14 DIAGNOSTIC IMAGING - LEVEL 1 - SECTOR D- HVAC M5.72 INPATIENT CARE UNIT- LEVEL 7 - SECTOR B - HVAC PIPING CONSTRUCTION.
<br /> M2.54 FUTURE INPATIENT CARE UNIT- LEVEL 5- SECTOR D - PLUMBING M4.15 DIAGNOSTIC IMAGING - LEVEL 1 - SECTOR E - HVAC M5.73 INPATIENT CARE UNIT- LEVEL 7 - SECTOR C - HVAC PIPING 9. VERIFY EXISTING CONDITIONS BEFORE COMMENCING ANY WORK ON AN EXISTING
<br /> M2.55 FUTURE INPATIENT CARE UNIT- LEVEL 5- SECTOR E - PLUMBING MECHANICAL SYSTEM.
<br /> M4.16 DIAGNOSTIC IMAGING - LEVEL 1 - SECTOR F- HVAC M5.74 INPATIENT CARE UNIT- LEVEL 7 - SECTOR D - HVAC PIPING
<br /> M2.56 FUTURE INPATIENT CARE UNIT- LEVEL 5 - SECTOR F- PLUMBING M4.17 EXISTING HOSPITAL FLOOR PLAN - LEVEL 1 - SECTOR G- HVAC M5.76 INPATIENT CARE UNIT- LEVEL 7 - SECTOR F- HVAC PIPING 10. ALL DUCTWORK SIZES SHOWN ARE INSIDE CLEAR. ADD APPROPRIATE DIMENSION
<br /> FOR INSULATION TO OBTAIN "TOTAL" DUCT SIZE.
<br /> M2.61 INPATIENT CARE UNIT- LEVEL 6 - SECTOR A - PLUMBING M4.17d EXISTING HOSPITAL FLOOR PLAN - LEVEL 1 - SECTOR G- HVAC DEMOLITION M5.81 INPATIENT CARE UNIT- LEVEL 8 - SECTOR A- HVAC PIPING
<br /> 11. INSTALL COMBINATION FIRE/SMOKE DAMPERS AT ALL LOCATIONS WHERE DUCTS
<br /> M2.62 INPATIENT CARE UNIT- LEVEL 6 - SECTOR B - PLUMBING M4.21 SURGERY- LEVEL 2 - SECTOR A - HVAC M5.82 INPATIENT CARE UNIT- LEVEL 8 - SECTOR B - HVAC PIPING PENETRATE FIRE RATED WALLS. DAMPER FIRE RATING SHALL BE 1-1/2 HOUR
<br /> M2.63 INPATIENT CARE UNIT- LEVEL 6 - SECTOR C - PLUMBING M4.22 SURGERY- LEVEL 2 - SECTOR B - HVAC M5.83 INPATIENT CARE UNIT- LEVEL 8 - SECTOR C - HVAC PIPING UNLESS NOTED OTHERWISE. COORDINATE DAMPER ACCESS WITH GENERAL y .
<br /> CONTRACTOR AND ELECTRICAL CONNECTIONS WITH ELECTRICAL CONTRACTOR. 0,
<br /> M2.64 INPATIENT CARE UNIT- LEVEL 6 - SECTOR D - PLUMBING M4.23 SURGERY- LEVEL 2 - SECTOR C - HVAC M5.84 INPATIENT CARE UNIT- LEVEL 8 - SECTOR D - HVAC PIPING
<br /> M2.66 INPATIENT CARE UNIT- LEVEL 6 - SECTOR F- PLUMBING 4.24 SURGERY- LEVEL 2 - SECTOR D - HVAC M5.86 INPATIENT CARE UNIT- LEVEL 8 - SECTOR F- HVAC PIPING 12. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ELEVATIONS FOR .;,' . /V4
<br /> /V4 ]
<br /> EXACT LOCATION OF ALL DIFFUSERS AND GRILLES. lr+�.
<br /> M2.71 INPATIENT CARE UNIT- LEVEL 7 - SECTOR A - PLUMBING M4.25 SURGERY- LEVEL 2 - SECTOR E- HVAC M5.91 FUTURE INPATIENT CARE UNIT- LEVEL 9 - SECTOR A - HVAC PIPING ....to+�tr,,f./
<br /> 13. MAXIMUM FLEXIBLE DUCT LENGTH SHALL BE 6'-0" WITH 0.5 x DUCT DIAMETER :F.. •,-
<br /> M2.72 INPATIENT CARE UNIT- LEVEL 7 - SECTOR B - PLUMBING M4.26 SURGERY- LEVEL 2- SECTOR F- HVAC M5.93 FUTURE INPATIENT CARE UNIT- LEVEL 9 - SECTOR C - HVAC PIPING OFFSET, UNLESS NOTED OTHERWISE. s e ON L ,St`
<br /> M2.73 INPATIENT CARE UNIT- LEVEL 7- SECTOR C - PLUMBING M4.27 EXISTING HOSPITAL FLOOR PLAN - LEVEL 2 - SECTOR G- HVAC M5.96 FUTURE INPATIENT CARE UNIT- LEVEL 9 - SECTOR F- HVAC PIPING 14. PROVIDE CONCEALED DAMPER REGULATORS FOR ALL VOLUME DAMPERS OVER
<br /> M2.74 INPATIENT CARE UNIT- LEVEL 7 - SECTOR D - PLUMBING M4.27d EXISTING HOSPITAL FLOOR PLAN - LEVEL 2 - SECTOR G- HVAC DEMOLITION M5.101 INPATIENT CARE UNIT- LEVEL 10 - SECTOR A - HVAC PIPING INACCESSIBLE CEILINGS AND SOFFITS. REFER TO ARCHITECTURAL DRAWINGS
<br /> M2.76 INPATIENT CARE UNIT- LEVEL 7- SECTOR F- PLUMBING M4.31 INVASIVE PROCEDURE - LEVEL 3 - SECTOR A - HVAC M5.102 INPATIENT CARE UNIT- LEVEL 10 - SECTOR B - HVAC PIPING FOR CEILING TYPES. COORDINATE JACK LOCATION WITH ARCHITECT..
<br /> 15. PROVIDE TRANSITIONS AS REQUIRED TO CONNECT DUCTWORK TO AIR TERMINAL Date NOVEMBER 03,2008
<br /> INPATIENT CARE UNIT- LEVEL 8- SECTOR A - PLUMBING M4.32 INVASIVE PROCEDURE - LEVEL 3 - SECTOR B - HVAC M5.103 INPATIENT CARE UNIT- LEVEL 10 - SECTOR C - HVAC PIPING UNITS, FANS AND OTHER MECHANICAL EQUIPMENT.
<br /> M2.82 INPATIENT CARE UNIT- LEVEL 8- SECTOR B - PLUMBING lob Na 880613.01
<br /> M4.33 INVASIVE PROCEDURE - LEVEL 3 - SECTOR C - HVAC M5.104 INPATIENT CARE UNIT- LEVEL 10 - SECTOR D - HVAC PIPING
<br /> M2.83 INPATIENT CARE UNIT- LEVEL 8- SECTOR C- PLUMBING 16. PROVIDE DIFFUSER AND GRILLE FRAMES COMPATIBLE WITH ARCHITECTURAL Drawn By: ED1
<br /> M4.34 INVASIVE PROCEDURE - LEVEL 3 - SECTOR D - HVAC M5.106 INPATIENT CARE UNIT- LEVEL 10 - SECTOR F - HVAC PIPING CEILING TYPE. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR
<br /> M2.84 INPATIENT CARE UNIT- LEVEL 8- SECTOR D - PLUMBING M4.35 INVASIVE PROCEDURE - LEVEL 3 - SECTOR E - HVAC M5.101R ROOF LEVEL- SECTOR A- HVAC PIPING CEILING TYPE. Checked Bp F)
<br /> M2,86 INPATIENT CARE UNIT- LEVEL 8 - SECTOR F - PLUMBING M4.36 INVASIVE PROCEDURE - LEVEL 3 - SECTOR F- HVAC M5.102R ROOF LEVEL - SECTOR B - HVAC PIPING 17. COORDINATE EXACT LOCATIONS OF ALL ROOM THERMOSTATS AND/OR ROOM
<br /> TEMPERATURE SENSORS WITH ARCHITECT PRIOR TO INSTALLATION. Drawing No.
<br /> M2.91FUTURE INPATIENT CARE UNIT- LEVEL 9 - SECTOR A- PLUMBING M4.37 EXISTING HOSPITAL FLOOR PLAN - LEVEL 3 - NEW BRIDGE - MECHANICAL M5.103R ROOF LEVEL - SECTOR C - HVAC PIPING
<br /> M2.92 FUTURE INPATIENT CARE UNIT- LEVEL 9- SECTOR B- PLUMBING M4.41 MECHANICAL- LEVEL 4- SECTOR A - HVAC M5.104R ROOF LEVEL - SECTOR D - HVAC PIPING 18. PROVIDE A VOLUME DAMPER FOR EACH SUPPLY, RETURN AND EXHAUST
<br /> OPENING AND IN BRANCHES WHERE THREE OR MORE OPENINGS ARE ASSOCIATED
<br /> M2.93 FUTURE INPATIENT CARE UNIT- LEVEL 9 - SECTOR C- PLUMBING M4.42 MECHANICAL- LEVEL 4- SECTOR B - HVAC M5.106R ROOF LEVEL - SECTOR F- HVAC PIPING
<br /> WITH THE BRANCH AND ELSEWHERE AS NOTED ON THE DRAWINGS OR
<br /> M2.94 FUTURE INPATIENT CARE UNIT- LEVEL 9 - SECTOR D - PLUMBING M4.42M MECHANICAL- LEVEL 4- MEZZANINE - SECTOR B - HVAC M6.00B SUPPORT SERVICES - LEVEL B - FIRE PROTECTION SPECIFICATIONS.
<br /> M2.96 FUTURE INPATIENT CARE UNIT- LEVEL 9 - SECTOR F- PLUMBING M4.43 MECHANICAL- LEVEL 4- SECTOR C- HVAC M6.00 EMERGENCY SERVICES- LEVEL G- FIRE PROTECTION 19. COORDINATE EXACT LOCATION AND MOUNTING HEIGHTS OF ALL PLUMBING Isv11.J. J1
<br /> M2.101 INPATIENT CARE UNIT- LEVEL 10- SECTOR A - PLUMBING M4.44 MECHANICAL- LEVEL 4- SECTOR D - HVAC M6.10 DIAGNOSTIC IMAGING - LEVEL 1 - FIRE PROTECTION FIXTURES WITH CASEWORK AND ARCHITECTURAL DRAWINGS.
<br /> M2.102 INPATIENT CARE UNIT- LEVEL 10 - SECTOR B - PLUMBING M4.45 MECHANICAL- LEVEL 4- SECTOR E - HVAC M6.17 EXISTING HOSPITAL FLOOR PLANS - LEVELS 1 AND 2 - SECTOR G -FIRE PROTECTION 20. PROVIDE VENTS FROM ALL GAS PRESSURE REGULATORS TO A SAFE LOCATION
<br /> M2.103 INPATIENT CARE UNIT- LEVEL 10- SECTOR C- PLUMBING OUTSIDE THE BUILDING.
<br /> M4.46 MECHANICAL- LEVEL 4- SECTOR F- HVAC M6.20 SURGERY- LEVEL 2 - FIRE PROTECTION 1700 13th St- 2014 2nd Floor Surgery- M1407-039
<br />
|