Laserfiche WebLink
2006 WSEC COMPLIANCE MECHANICAL LEGEND <br /> 1. HVAC EQUIPMENT SHALL HAVE MINIMUM PERFORMANCE AT SPECIFIED RATING GENERAL EQUIPMENT PLUMBING AND PIPING(CONT) ABBREVIATIONS C <br /> CONDITIONS NOT LESS THAN THE VALUES INDICATED IN TABLE 14-1A THROUGH <br /> 14-1M AND 1411.1 OF THE WSEC AND AS INDICATED ON THE CONTRACT DOCUMENTS. SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION ACU AIR CONDITIONING UNIT la 1-, <br /> CV <br /> 2. PROVIDE DEADBAND BETWEEN HEATING/COOLING SPACE SENSOR SETPOINTS OF HEAVY LINE INDICATES NEW WORK OO THERMOSTAT OR TEMPERATURE SENSOR 0FC0 FLOOR CLEANOUT ABOP ADJUSTABLE BLOW OUT PANEL L.) <br /> 5 DEGREES AS REQUIRED BY SECTION 1412.2 OF THE WSEC OR AS DESCRIBED AFF ABOVE FINISH FLOOR <br /> IN THE TEMPERATURE CONTROL SEQUENCES. LIGHT LINE INDICATES EXISTING WORK C DUCT SMOKE DETECTOR <br /> 11 WCO WALL CLEANOUT AHU AIR HANDLING UNIT Z a3 <br /> 3. HVAC SYSTEMS SHALL BE EQUIPPED WITH AUTOMATIC CONTROLS CAPABLE OF - CENTERLINE ® NITROUS DIOXIDE SENSOR AL ALUMINUM <br /> ACCOMPLISHING SETBACK OR SHUTDOWN DURING UNOCCUPIED PERIODS AS --______- CONTROL WIRING/TUBING WALL HYDRANT/HOSE BIBB ARCH ARCHITECTURAL w <br /> REQUIRED BY SECTION 1412.4 OF THE WSEC AND AS DESCRIBED IN THE -- MATCHLINE MAVy-- BDD BACKDRAFT DAMPERID <br /> TEMPERATURE CONTROL SEQUENCES. t t TERMINAL UNIT, SEE SCHEDULE MANUAL AIR VENT <br /> /////fi EXISTING WORK TO BE REMOVED I <br /> AAV BHP BRAKE HORSEPOWER 0 42 <br /> 4. PROVIDE BALANCING DEVICES IN ALL BRANCH DUCTS AND PIPE RUNS TO t PIPELINE - NORMAL DIRECTION OF FLOW �_�`�ACCESS f y AUTOMATIC AIR VENT BOT BOTTOM MIMIC <br /> TERMINAL DEVICES AS REQUIRED BY SECTION 1412.7 OF THE WSEC AND AS <br /> INDICATED ON THE CONTRACT DOCUMENTS. SA FLOW ARROW(SUPPLY AIR SHOWN) �- UNIT HEATER, SEE SCHEDULE �4_ RELIEF VALVE CFM CUBIC FEET PER MINUTE Kiri:,: <br /> CLG CEILING Pa <br /> 5. ALL DUCTWORK SHALL COMPLY WITH SMACNA STANDARDS FOR CONSTRUCTION t 2 PUMP, SEE SCHEDULEy STEAM RELIEF VALVE WITH CO CLEANOUT , 4' <br /> C <br /> OF GALVANIZED DUCTWORK. ALL DUCTWORK SHALL BE SEALED AS REQUIRED O KEY NOTE CALLOUT COND CONDENSING t3 IQ3 4) <br /> BY SECTION 1414.1 OF THE WSEC. DUCT TAPE NOT ALLOWED. DRIP PAN ELBOW CONN CONNECTION t'itlt" ti- <br /> DUCTWORK STATIC PRESSURE AND SEAL CLASS: Q1 REVISION CALLOUT PLUMBING AND PIPING 4- THRUST BLOCK CONT CONTINUATION ` '' } <br /> WATER COLUMN SEAL CLASS CW COLD WATER <br /> ui',�II„;,uih <br /> PLUMBING FIXTURE OR DRAIN CALLOUT, SYMBOL DESCRIPTION <br /> h TO 2 INCHES SEAL TRANSVERSE JOINTS P1 SEE SCHEDULE JIL VENT THROUGH ROOF DB DRY BULB <br /> 2 TO 3 INCHES SEAL TRANSVERSE JOINTS AND LONGITUDINAL SEAMS - COLD WATER0 FLOOR DRAIN DDC DIRECT DIGITAL CONTROL 1, <br /> ABOVE 3 INCHES SEAL TRANSVERSE, JOINTS, LONGITUDINAL SEAMS A MEDICAL OUTLET CALLOUT, SEE SCHEDULE -- lifil <br /> AND DUCT WALL PENETRATIONS HOT WATER DEG DEGREE <br /> Oo ROOF DRAIN <br /> POINT OF CONNECTION DIA DIAMETER <br /> 6. ALL DUCTWORK SHALL BE INSULATED AS REQUIRED BY SECTION 1414.2 OF ---- HOT WATER CIRCULATING DL DUCT LINER <br /> THE WSEC AND AS DESCRIBED IN SECTION 15081 OF THE PROJECT MANUAL. (35.4 12) PIPE FLOW CALLOUT: SOIL OR WASTE - ABOVE GROUND MEDICAL AND LABORATORY DN DOWN <br /> '1'*_N--_-PIPE SIZE (IN) --II- SOIL OR WASTE - BELOW GROUND DWG DRAWING <br /> DUCT TYPE LOCATION R-VALUE SYMBOL DESCRIPTIONEA EXHAUST AIR EVERETT,WASHINGTON <br /> VOLUME FLOW RATE (GPM) RWL RAINWATER LEADER <br /> . SUPPLY/RETURN NOT WITHIN CONDITIONED SPACE R-7 (INCLUDE APPROVED DI DEIONIZED WATER EAT ENTERING AIR TEMPERATURE <br /> WEATHERPROOF BARRIER) I EF-1 I EQUIPMENT CALLOUT, SEE SCHEDULE -ORWL- OVERFLOW RAINWATER LEADER EF EXHAUST FAN <br /> RO REVERSE OSMOSIS WATER EFF EFFICIENCY GU NS& <br /> SUPPLY/RETURN/ IN GROUND OR CONCRETE R-5.3 CD2-300 DIFFUSER OR GRILLE CALLOUT, SEE SCHEDULE ----- VENT- ABOVE GRADE �^ <br /> OUTSIDE AIR WAGD WASTE ANESTHESIA GAS DISPOSAL ELEC ELECTRICAL �� <br /> OUTSIDE AIR WITHIN CONDITIONED SPACE R-7 (DAMPER AT `�VOLUME FLOW RATE (CFM), NONE INDICATED ---II--- VENT- BELOW GRADE ENT ENTERING <br /> HPA HIGH PRESSURE AIR (30+PSI) <br /> (NOTEQPT EQUIPMENT <br /> NOT CONSIDERED PART OF ENVELOPE PENETRATION) FOR TRANSFER GRILLE Ro REVERSE OSMOSIS (PURE WATER) <br /> THE BUILDING ENVELOPE) DIFFUSER OR GRILLE TYPE TP LA- LABORATORY AIR ESP EXTERNAL STATIC PRESSURE ___t_., <br /> TRAP PRIMING LINE EXH ,,,,, <br /> EXHAUST <br /> SUPPLY WITHIN CONDITIONED SPACE R-3.3 -L02 LABORATORY OXYGEN EXIST(E) EXISTING "Y <br /> INDICATES DIAMETER OR ROUND -ID- INDIRECT DRAIN NN, <br /> 7. ALL PIPING SHALL BE INSULATED AS REQUIRED BY SECTION 1415.1 OF THE a INDICATES FLAT OVAL G GAS Lv LABORATORY VACUUM EWT ENTERING WATER TEMPERATURE �yITECCS <br /> WSEC AND AS DESCRIBED IN SECTION 15083 OF THE PROJECT MANUAL: cot CARBON DIOXIDE F FAHRENHEIT <br /> igh DETAIL CALLOUT: HPNP HIGH PRESSURE NON-POTABLE COLD WATER FCO FLUSH CLEANOUT <br /> PIPE DIAMETER: ® MA MEDICAL AIR Architecture/Planning/neer Design <br /> INDICATES DETAIL NUMBER NP- NON-POTABLE COLD WATER FD FLOOR DRAIN/FIRE DAMPER Portland Seattle Las Angeles Washington DC <br /> SYSTEM/TEMP (F) INSULATION <1" >1"-2"1>2"-4"I>4"-6"1>6" My MEDICAL VACUUM FDC FIRE DEPARTMENT CONNECTION <br /> CONDUCTIVITY 1."-------SHEET NUMBER WHERE DETAIL IS DRAWN HPA HIGH PRESSURE AIR FHV FIRE HOSE VALVE <br /> INSULATION THICKNESS: 02- OXYGEN 925 Fourth Ave.,Suite 2400 <br /> -co- CONDENSATE DRAIN FLA FULL LOAD AMPACITY Seattle,Washington 98104 <br /> HEATING ABOVE 350 .32-.34 2.5 2.5 3.0 3.5 3.5 SECTION CALLOUT: Neo NITROUS OXIDE FLR FLOOR <br /> 251-350 .29-.31 2.0 2.5 2.5 3.5 3.5 \ T TEMPERED WATER FPM FEET PER MINUTE <br /> 201-250 .27-.30 1.5 1.5 2.0 2.0 3.5 INDICATES DIRECTION OF CUTTING PLANE N2 NITROGEN (PH)206 623 9414 <br /> 141-200 .25-.29 1.5 1.5 1.5 1.5 1.5 ® INDICATES SECTION LETTER -HWS- HEATING WATER SUPPLY <br /> --ID4) ZONE VALVE BOX FT FEET/FOOT (FAX)206 623 7868 <br /> 105-140 .24-.28 1.0 1.0 1.0 1.5 1.5 �� H/F HEATING WATER FLOW FTU FAN TERMINAL UNIT <br /> DOMESTIC 105+ .24-.28 1.0 1.0 1.5 1.5 1.5 SHEET NUMBER WHERE SECTION IS DRAWN o MEDICAL GAS ALARM PANEL GAL GALLONS <br /> 45-65 .24-.27 0.5 0.5 0.5 0.5 0.5 HWR HEATING WATER RETURN GPH GALLON PER HOUR Consultants <br /> COOLING 40-55 .23-.27 0.5 0.75 1.0 1.0 1.0 cws CHILLED WATER SUPPLY Q SYSTEM PRESSURE SENSOR GPM GALLONS PER MINUTE <br /> BELOW 40 .23-.27 1.0 1.5 1.5 1.5 1.5 VENTILATION LIFE SAFETY <br /> c/R CHILLED WATER RETURN GW GREASE WASTE ROLF JENSEN&ASSOCIATES <br /> 8. INDIVIDUAL ZONE TERMINAL UNITS AND HVAC SYSTEMS SERVING PORTIONS OF DOUBLE SINGLE DESCRIPTION GWB GYPSUM WALL BOARD <br /> THE BUILDING HAVING LESS THAN 24-HOUR OPERATION SHALL BE SHUT OFF Lcws LASER CHILLED WATER SUPPLY FIRE PROTECTION 19125 North Creek Parkway Suite 120 <br /> DURING UNOCCUPIED PERIODS AS REQUIRED BY SECTION 1432.1 OF THE WSEC DUCT: 1ST SIZE(IN) INDICATES SIDE SHOWN, HEDV HOSE END DRAIN VALVE Bothell,Washington 98011 <br /> AND AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES. +24x12+ t--t 2ND SIZE (IN) INDICATES SIDE NOT SHOWN, LCWR LASER CHILLED WATER RETURN SYMBOL DESCRIPTION HP HORSEPOWER/HIGH PRESSURE <br /> INSIDE FREE AREA -MOWS- HW HOT WATER CIVIL ENGINEER <br /> 9. SUPPLY AIR AND WATER TEMPERATURES SHALL BE AUTOMATICALLY RESET AS MRI CHILLED WATER SUPPLY D� HOSE VALVE <br /> REQUIRED IN SECTION 1432.2.1 AND 1432.2.2 OF THE WSEC OR AS DESCRIBED 41:1 1*- t-� DOUBLE-WALL INSULATED DUCT MCWR MRI CHILLED WATER RETURN HWC HOT WATER CIRCULATING Magnusson1Fithvenue,Sue 32000tes <br /> IN THE TEMPERATURE CONTROL SEQUENCES. ® HOSE VALVE CABINET IA INTAKE AIR 1301 Fifth Avenue,Suite <br /> [XI t--Da SUPPLY AIR DUCT- TURNING UP OR TOWARD -cws(s)- CHILLED WATER SUPPLY SECONDARY -F FIRE LINE ID INSIDE DIAMETER/INDIRECT DRAIN Seattle,Washington 98101-2699 <br /> 10. ALLAAIR SYSTEMS SHALLEBE PROVIDED WITHN1 100%1, CAPABLE AIR ECONOMIZER FEWSEC -cwR(s)- CHILLED WATER RETURN SECONDARY IE INVERT ELEVATION <br /> CAPABILITY AS REQUIRED BY THE SECTION 1413.1, 1423 AND 1433 OF THE -SD- SPRINKLER DRY LANDSCAPE ARCHITECT <br /> AND AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES. mem t--� J SUPPLY AIR DUCT- TURNING DOWN OR AWAY IN INCH <br /> -cs CONDENSER WATER SUPPLY SP SPRINKLER PIPE ISO ISOLATION Site Workshop <br /> 11. AIR ECONOMIZERS SHALL BE CAPABLE OF PROVIDING PARTIAL COOLING EVEN RETURN OR EXHAUST AIR DUCT- TURNING927 Post Alley <br /> UP OR TOWARD CR- CONDENSER WATER RETURN • PENDENT HEAD KW KILOWATT Seattle,Washington 98101 <br /> WHEN ADDITIONAL MECHANICAL COOLING IS REQUIRED TO MEET THE REMAINDER g <br /> OF THE COOLING LOAD. HRc HEAT RECOVERY CIRCULATING KWH KILOWATT HOUR <br /> MEN '-1,'1 <br /> RETURN OR EXHAUST AIR DUCT- TURNING X DRY PENDENT HEAD <br /> STRUCTURAL ENGINEER <br /> 12. SIMULTANEOUS HEATING AND COOLING TO INDIVIDUAL ZONES SHALL BEDOWN OR AWAY -HRS- HEAT RECOVERY HOT WATER SUPPLY LAT LEAVING AIR TEMPERATURE <br /> PROHIBITED AS DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES EXCEPT LO UPRIGHT HEAD LBS POUNDS Magnusson Klemencic Associates <br /> WHERE PERMITTED IN SECTION 1435, EXCEPTIONS 1 THROUGH 4 OF THE WSEC. -0 H-4)- ,--S- ROUND DUCT- TURNING UP OR TOWARD -HRR- HEAT RECOVERY HOT WATER RETURN a SIDEWALL HEAD LP LOW PRESSURE 1301 Fifth Avenue,Suite 3200 <br /> -HPS- HEAT PUMP SUPPLY LVG LEAVING Seattle,Washington 98101-2699 <br /> 13. VARIABLE FREQUENCY DRIVES SHALL BE PROVIDED FOR VARIABLE FLOW ROUND DUCT- TURNING DOWN OR AWAY 1 DRY SIDEWALL HEAD <br /> HEATING AND AIR HANDLING SYSTEMS AS REQUIRED BY SECTION 1438 OF t DLS LOCK SHIELD <br /> -HPR- HEAT PUMP RETURN WET ALARM VALVE MECHANICAL ENGINEER <br /> THE WSEC AND AS DESCRIBED IN THE CONTRACT DOCUMENTS INCLUDING ® LWT LEAVING WATER TEMPERATURE CDi Engineers <br /> TEMPERATURE CONTROL SEQUENCES. - - t-® OVAL DUCT- TURNING UP OR TOWARD -PC.- PROCESS CHILLED WATER SUPPLY g <br /> 4 DRY ALARM VALVE MAX MAXIMUM 19203 36th Ave.W,Suite 200 <br /> 14. DOMESTIC HOT WATER CIRCULATION PUMPS SHALL BE SHUT DOWN DURING r OVAL DUCT- TURNING DOWN OR AWAY PCWR PROCESS CHILLED WATER RETURN MBH BRITISH THERMAL UNIT PER Lynnwood,Washington 98036 <br /> UNOCCUPIED PERIODS AS REQUIRED BY SECTION 1442 OF THE WSEC AND AS 4-1 11) o ALARM BELL <br /> DESCRIBED IN THE TEMPERATURE CONTROL SEQUENCES. -PCws(s)- PROCESS CHILLED WATER SUPPLY SECONDARY HOUR (THOUSAND) <br /> t--d--d TRANSITION 1.4 SUPERVISED VALVE MCA MINIMUM CURRENT AMPACITY ELECTRICAL ENGINEER <br /> 15. MOTOR EFFICIENCY SHALL NOT BE LESS THAN THE MINIMUM CALLOUTS PER -Pc (s)- PROCESS CHILLED WATER RETURN SECONDARY MECH MECHANICAL SPARLING <br /> TABLE 14-4 AND SECTION 1437 OF THE WSEC FOR FULL LOAD EFFICIENCIES. MIN MINIMUMWay, <br /> t---o-� TRANSITION - ROUND TO RECTANGULAR -HPS- HIGH PRESSURE STEAM SUPPLY FIRE DEPARTMENT CONNECTION 720 Olive Suite 1400 <br /> FLOW SWITCH MOD MOTOR OPERATED DAMPER Seattle,Washington 98101-1853 <br /> 16. RECORD DRAWINGS SHALL BE PROVIDED TO THE OWNER WITHIN 90 DAYS AFTER -MPS- MEDIUM PRESSURE STEAM SUPPLY <br /> THE DATE OF SYSTEM ACCEPTANCE AS REQUIRED BY SECTION 1416.1 OF THE WSEC. MTD MOUNTED <br /> THE DRAWINGS SHALL INDICATE THE LOCATION AND PERFORMANCE DATA OF �ill� �� TURNING VANES IN RECTANGULAR DUCT TURN LPs LOW PRESSURE STEAM SUPPLY NC NOISE CRITERIA/NORMALLY CLOSED GENERAL CONTRACTOR <br /> EQUIPMENT, GENERAL CONFIGURATION OF DUCTWORK AND PIPING DISTRIBUTION INSTRUMENTATION ND NITROGEN DIOXIDE SENSOR M.A.Mortenson Company <br /> LPHS LOW PRESSURE HUMIDIFICATION STEAM 14719 N.E.29th Place <br /> SYSTEMS, INCLUDING FLOW RATES AS A MINIMUM. SYMBOL DESCRIPTION NIC NOT IN CONTRACT Bellevue,Washington 98007 <br /> 17. OPERATION AND MAINTENANCE MANUALS SHALL BE PROVIDED TO THE OWNER AS 90'ELBOW(RADIUS = 1.5 x ELBOW DIAMETER) -NCR-- HIGH PRESSURE CONDENSATE RETURN NO NORMALLY OPEN <br /> REQUIRED BY SECTION 1416.2 OF THE WSEC. AS A MINIMUM, THE MANUALS -MCR- MEDIUM PRESSURE CONDENSATE RETURN © DENOTES CONTROL POINT NOM NOMINAL <br /> LCR LOW PRESSURE CONDENSATE RETURN NP NON-POTABLE <br /> SHALL INCLUDE: Revisions <br /> RECTANGULAR BRANCH CONNECTION WITH A SUMMARY ALARM OA OUTSIDE AIR <br /> 1. SUBMITTAL DATA. 45'TAPER vv VAPOR VENT AHU AIR HANDLING UNIT <br /> 2. OPERATION AND MAINTENANCE DATA FOR EQUIPMENT. OD OUTSIDE DIAMETER <br /> 3. NAMES AND ADDRESSES OF SERVICE AGENCIES. SRv SAFETY RELIEF VENT Al ANALOG INPUT OFCI OWNER FURNISHED <br /> 4. HVAC CONTOLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION. 1--1---1 CONICAL BRANCH CONNECTION -PCR PUMPED CONDENSATE RETURN AMU AIR MEASURING UNIT CONTRACTOR INSTALLED DOCUMENT RELEASE 09 11/03/08 <br /> 5. NARRATIVE OF HOW SYSTEM IS INTENDED TO OPERATE. � AO ANALOG OUTPUT OR OPERATING ROOM DOCUMENT RELEASE 11 02/09/09 <br /> , � -LPHS- LOW PRESSURE HUMIDIFIER SUPPLY AUX AUXILIARY DEVICE OR CONTACT ORD OVERFLOW ROOF DRAIN <br /> 18. HVAC SYSTEMS SHALL BE BALANCED AS REQUIRED BY SECTION 1416.3 OF THE WSEC. -1,-14.- 45°LATERAL FITTING DOCUMENT RELEASE 13 03/09/09 <br /> 19. COMMISSIONING SHALL BE PROVIDED AND A REPORT OF COMMISSIONING BE f� r D4 GATE VALVE CO CARBON MONOXIDE SENSOR PD PRESSURE DROP <br /> SUBMITTED TO THE OWNER AS REQUIRED BY SECTION 1416.4 OF THE WSEC. [ ,lam r ) Deo GLOBE VALVE CO2 CARBON DIOXIDE SENSOR PDI PLUMBING AND DRAINAGE <br /> 0 I 45'LATERAL FITTING WITH 45'ELBOW CR CONTROL RELAY INSTITUTE <br /> BUTTERFLY VALVE PH PHASE <br /> CS CURRENT SENSOR <br /> BUTTERFLY VALVE, FLANGED CT CURRENT TRANSMITTER POC POINT OF CONNECTION44p)- ,--I--, PPH POUNDS PER HOUR <br /> r 90°CONICAL TEE FITTING �� CHECK VALVE DDC DIRECT DIGITAL CONTROL PR PUMP CONDENSATE RETURN <br /> 2 0 MEMORY STOP BALANCING VALVE DI DIGITAL INPUT PSI POUNDS PER SQUARE INCH <br /> BELLMOUTH BRANCH CONNECTION DO DIGITAL OUTPUT PSIG POUNDS PER SQUARE INCH GAUGE <br /> BALL VALVE <br /> r DP DIFFERENTIAL PRESSURE SWITCH RA RETURN AIR <br /> t ,I t <br /> ö CIRCUIT BALANCING VALVE DPH DIFFERENTIAL PRESSURE SWITCH - RD ROOF DRAIN <br /> -CIL- 90°DIVERGING TEE <br /> W,R PRESSURE REGULATING VALVE HIGH LIMIT RH RELATIVE HUMIDITY <br /> r �;J� PLUG VALVE DPL DIFFERENTIAL PRESSURE SWITCH - RL RAIN LEADER <br /> -.st it ______t 90'DIVERGING TEE LOW LIMIT RM ROOM <br /> I, -11. 1-- BACKFLOW PREVENTER DPS DIFFERENTIAL PRESSURE SENSOR/ RO RETURN OPENING <br /> 1....L-t-+ t I t AUTOMATIC CONTROL DAMPER - �p� TRANSMITTER RPM REVOLUTIONS PER MINUTE <br /> OPPOSED BLADE (PROVIDE ACCESS) D'4 TWO-WAY CONTROL VALVE DPV DIFFERENTIAL PRESSURE VALVE <br /> I 0 <br /> 4 pg, AUTOMATIC CONTROL DAMPER - <br /> E 1 THREE-WAY CONTROL VALVE ES DAMPER POSITION SA U <br /> IL <br /> I SUPPLYI AIR CLOSEOUT PRINTING 04/01/12 <br /> PARALLEL BLADE (PROVIDE ACCESS) A FCV FLOW CONTROL VALVE SEC SEATTLE ENERGY CODE <br /> SOLENOID VALVE <br /> FM FLOWMETER SF SUPPLY FAN <br /> 1--F--0 VOLUME DAMPER ^f�1 GAS COCK FPT FREEZE PROTECTION THERMOSTAT SG SUPPLY GRILLE <br /> BDD AUTOMATIC FLOW CONTROL VALVE FS FLOW SWITCH SO SCREENEDAOPENINGS Drawing Title <br /> IBDD SS STAINLESS STEEL/SANITARY SEWER <br /> MINE t--� 1 BACKDRAFT DAMPER -In-- FLEXIBLE CONNECTION H HUMIDITY SENSOR SP STATIC PRESSURE/SPRINKLER PIPE MECHANICAL LEGEND <br /> T -11- FLANGED CONNECTION ICV ISOLATION CONTROL VALVE SPEC SPECIFICATION <br /> 1...t----T + ______^t COMBINATION FIRE/SMOKE DAMPER LS LEVEL SWITCH STM STEAM <br /> (PROVIDE ACCESS) D CONCENTRIC REDUCER MOD MOTOR OPERATED DAMPER SUP SUPPLY <br /> itiF4 <br /> 1 <br /> VFD <br /> FIRE DAMPER (PROVIDE ACCESS) ECCENTRIC REDUCER (TOP) NC NORMALLY CLOSED TBD TO BE DETERMINED <br /> ECCENTRIC REDUCER (BOTTOM) NO NORMALLY OPEN TP TRAP PRIMER <br /> I I I SD V NO2 <br /> PB NITROUS DIOXIDE <br /> PUSH-BUTTON TSP TOTAL STATIC PRESSURE <br /> 1 T t SMOKE DAMPER -1 I EXPANSION JOINT TU'(S) TERMINAL UNIT(S)R/D 0 BASKET STRAINER PI PULSE INPUT TYP TYPICAL <br /> R/D x PIPE ANCHOR PM PULSE METER OR INITIATOR UH UNIT HEATER <br /> 0=I INDICATES RISE OR DROP UNO UNLESS NOTED OTHERWISE <br /> ALIGNMENT GUIDE RH RELATIVE HUMIDITY . D' p <br /> IIIIIIIIIIIIIIIIIIII@ ki111 111111Ing FLEXIBLE DUCTWORK Y PORTABLE INSTRUMENT CONNECTION SCR SILICON RECTIFIER V VENT/VOLT •`�4,°{ 'f4.,',C"A <br /> VD VOLUME DAMPER i , -. <br /> SD SMOKE DETECTOR (DUCT) 'O. z <br /> II STRAINER VEL VELOCITY i •, <br /> t--HH-t FLEXIBLE CONNECTOR y SS START/STOP VS VENT STACK 'i �� �r <br /> IN.!, STRAINER WITH BLOW-OFF VALVE T SPACE TEMPERATURE SENSOR/ VTR VENT THROUGH ROOF '''* ;.t °",. <br /> - t--1-SUPPLY GRILLE (SIDEWALL) ] TRANSMITTER70NAL r' <br /> TEMP TEMPERATURE W WASTE/WATT <br /> --1.1 VENTURI FLOW METER WB WET BULB <br /> IL -lir 0 I-N-RETURN/EXHAUST GRILLE(SIDEWALL) 0 HIGH PRESSURE STEAM TRAP ASSEMBLY TCV TEMPERATURE CONTROL VALVE WCO WALL CLEANOUT <br /> TS TEMPERATURE SENSOR/ WG WATER GAGE <br /> th 41-' EXISTING COMBINATION FIRE/SMOKE DAMPERSMOKE DAMPER • LOW PRESSURE STEAM TRAP ASSEMBLY TRANSMITTER (DUCT OR PIPE) WS WASTE STACK Date NOVEMBER 03,2008 <br /> SD INDICATES EXISTING SMO <br /> FD INDICATES EXISTING FIREDAMPER, -fa GAS METER VAV VARIABLE AIR VOLUME WSEC WASHINGTON STATE <br /> ® WATER METER VFD VARIABLE FREQUENCY DRIVE ENERGY CODE lob No: 580613.01 <br /> CEILING DIFFUSER (FOUR-WAY AIRFLOW) ® FLOW METER <br /> ZAP ZONE ALARM PANEL Drawn By: CDi <br /> ZVB ZONE VALVE BOX Checked By: Fl <br /> ® CEILING DIFFUSER (THREE-WAY AIRFLOW) --Ii-- UNION <br /> II BLIND FLANGE <br /> ® CEILING DIFFUSER (TWO-WAY AIRFLOW) ] PLUG AND/OR CAP Drawing No. <br /> 0-A- RETURN/EXHAUST GRILLE Io PIPE TURNING UP OR TOWARD <br /> . '" 1 LINEAR DIFFUSER (FLOW ARROW SHOWN n <br /> IS PIPE TURNING DOWN OR AWAY <br /> ONLY IF AIRFLOW IS ONE DIRECTIONAL 7 PRESSURE GAUGE <br /> MO.024 <br /> 13th St- 201 42nd Floor Sure - M1407-039 <br /> SHEET ISSUED FOR REFERENCE <br /> 1700 Surgery <br />