My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 722-80
>
Ordinances
>
Ordinance 722-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 11:15:25 AM
Creation date
9/4/2018 11:15:24 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
722-80
Date
8/13/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 7 472 2 <br /> AN ORDINANCE amending Ordinance <br /> No. 669-80, modifying sewer connection <br /> fees in some areas. <br /> 1 WHEREAS, the Everett City Council passed Ordinance No. 669-80 on <br /> 2 February 27, 1980, creating special sewer connection fees for the purpose of <br /> 3 funding sewer system capacity improvements; and <br /> 4 WHEREAS, it has been found that costs for areas served by the South <br /> 5 End Interceptor are greater than originally anticipated resulting in the need <br /> 6 for increased fees; and, <br /> 7 WHEREAS, fees in these areas have been established at the higher level <br /> 8 for land subdivisions and major construction projects; and <br /> 9 WHEREAS, it is desireable to amend Ordinance 669-80 to make it consistent <br /> 10 with other connection fees ordinances; <br /> 11 NOW, THEREFORE, BE IT ORDAINED BY THE EVERETT CITY COUNCIL <br /> 12 THAT: <br /> 13 Section 1.B. of Ordinance No. 669-80 which reads: <br /> 14 B. Area 2 - (South End Interceptor), as shown on the attached map: <br /> 15 $263 for each direct connection to the Everett public sewer system <br /> 16 of a single family residence. <br /> 17 $384 for direct connection to the Everett public sewer system of <br /> 18 a duplex. <br /> 19 $510 for direct connection to the Everett public sewer system of <br /> 20 a triplex or three family structure. <br /> 21 $680 for direct connection to the Everett public sewer system of <br /> 22 a fourplex or four family structure. <br /> 23 is hereby amended to read: <br /> 24 B. Area 2 (South End Interceptor), as shown on the attached map: <br /> 25 $339 for each direct connection to the Everett public sewer system <br /> 26 of a single family residence. <br /> 27 $496 for direct connection to the Everett public sewer system of <br /> 28 a duple x. <br /> 29 $657 for direct connection to the Everett public sewer system of <br /> 30 a triplex or three family structure. <br /> 31 $876 for direct connection to the Everett public sewer system of <br /> 32 a fourplex or four family structure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.