Laserfiche WebLink
A PORTION OF THE S 1 /2 OF SECTION 1 & THE N 1 /2 OF SECTION 12, T 28 N, R 4 E, WM <br /> SDMH 3 TYPE 2-54" � � <br /> W/ SOLID LOCKING <br /> 50 LF-18" � 0.50� COVER <br /> & FLOW RESTRICTOR <br /> EX. SDMH ASSEMBLY 18' SETBACK FROM 1� N O R-T- H <br /> TOP 432.73 TOP 435.50 �� I � PROPERTY LINE TO » <br /> IE 428.8 12" (E) IE 428.98 - 18�� (E) MAX WATER SURFACE 18 � SD OUTFALL � CONSTRUCTION NOTES: , <br /> IE 427.5 18" (N,S) IE 428.98 - 18 (SW) EX. SDMH 434.0 W/ ROCK HEADWALL & SPLASH PAD o 20 4o so <br /> C.O.E STD DWGS 405, TOP 434.35 IE=430.00 (NW) z <br /> 415, 416, & 611 IE 429.5 12" (SE,W) O SEE DETAIL SHEET C-10 FOR FLOW RESTRICTOR SCALE: 1"=40' Q Q <br /> I E X. O V E R F L O W I N L E T 6 1 0 L F MANHOLE. CONNECT TO PROPOSED SDMH #4 ON � 7 <br /> �S _ _�p TOP 434.00 CL SF 18 SD EXISTING 18" STORM SEWER IN HARDESON ROAD. L <br /> �� IE 429.9 12"PVC NW S=5.00% � � <br /> I � � � O2 CONSTRUCT SDMH OVER EXISTING 18" STORM � � � <br /> 2 SDMH 4 TYPE 2-48 o U o <br /> W/ SOLID LOCKING COVER I (P CB 1 - TYPE 2 48"4 SEWER. RESTORE STREET PAVEMENT PER �-- J <br /> � � <br /> TOP 434.20 �So � W/ ROUND SOLID LOCKING COVER C.O.E. STD DWGS 326 & 614. p_ J � <br /> � � � <br /> IE 428.73 18" (N,S) � x �' - C.O.E. STD DWG 405 & 611 O 20 FOOT WIDE MAINTENANCE ACCESS DRIVE. ., <br /> IE 428.73 18" (E) � x � 435 � X TOP=435.00 � <br /> . C.O.E. STD DWGS 405 & 611 5 , � „ 435 I IE=430.50-18"(NW,SE) 4" CSBC OVER 12" RECYCLED CONCRETE. Q (Y� � <br /> '•'� �'tF-18 SD U, CHANNEL BASE , BASIN DESIGN BASIS . <br /> S=0.00% � � \ O INSTALL DOUBLE 20 WIDE CHAIN LINK SWING GATE � � C� j <br /> 4 a ��'• , 430 ON ACCESS DRIVE. THIS INFILTRATION BASIN IS DESIGNED BASED ON AN INFILTRATION RATE C.� uJ <br /> . " 42� �\ CONSTRUCT 20 FOOT CONCRETE DRIVEWAY TYPE 1 OF 1.5 INCHES PER HOUR FOR 29.8 ACRES OF TYPE C FORESTED z Q Z J <br /> � ��::`:�.j.:. . 18 SD INTAKE (' , �P S=2$•79% O PER C.O.E. STD DWG 315. CONDITION CONVERTED TO 80� IMPERVIOUS AND 20� LANDSCAPING. 0 O W <br /> 33' SETBACK FROM � . � � W/ ROCK HEADWALL �•� W PIPE ANCHORS PER Q O m <br /> PROPERTY LINE TO � � & TRASH RACK �C w� O� : � DETAIL ON SHEET C-10 INSTALL CATCH BASIN TYPE 1 ON EXISTING 12" THE INFILTRATION BASIN WAS MODELED USING THE WESTERN � � M • <br /> M A X W A T E R S U R F A C E I o x 3 IE=428.98 SB �� ��� �� O 6 W A S H I N G T O N H Y D R O L O G Y M O D E L (W W H M 2 0 1 2). O � <br /> 434.0 3•,1 INFILTRATION ,C O „ STORM SEWER AS SECONDARY OVERFLOW. INSTALL z r, <br /> o r\ Q` CB 15 - TYPE 2 48 � BEEHIVE GRATE PER DETAIL ON SHEET C-10. z M <br /> N x BASIN (230' X 55') + +.� �� � ,,.- '' W/ ROUND SOLID LOCKING COVER � RIM ELEVATION j 434.00. � = X <br /> 427 `- C.O.E. STD DWG 405 & 611 EXISTING IE (12 ) - 429.9 (NW) m � O Q <br /> �,,-v� TOP=481.60 �� m <br /> � DC � g \ 430 �,,, IE=469.86-18��(W) ] SDMH FOR CONNECTION BY LOT 2 AND FUTURE z � � 0 <br /> � IE=478.02-12 (SW) O DEVELOPMENT. FUTURE DEVELOPMENT TO PROVIDE O p., <br /> ex. 8»SS - - - � . <br /> 435 � IE=469.36-18" NW,S) INDIVIDUAL WATFR QUALITY FACILITIES PRIOR TO � <br /> .�.. , �E=4�s.o�-�2�°�NE) coNNECT�oN. STANDARD PRACTICE CODING SYSTEM Q z <br /> 10 � � 440 , <br /> x 445 � ,,,, ,�'� g HYDROSEED ALL EXPOSED SOILS. PER LANDSCAPE CONTRACTOR TO INSTALL AND MAINTAIN ALL EROSION CONTROL BMP'S � � <br /> U � .�� O PLANS. INSTALL EROSION CONTROL MAT, NORTH AS SHOWN ON THIS PLAN IN ACCORDANCE WITH DEPARTMENT OF J <br /> � "`� 450 '� ��' ;��� AMERICAN GREEN SC150. ECOLOGY STORMWATER POLLUTION PREVENTION REQUIREMENTS � � <br /> , ' �' z <br /> 455 ��� ��� /� g INSTALL 6 FT HIGH PERIMETER CHAINLINK FENCE. SUMMARIZED ON SHEET C4. IF BMP INSTALLATION AND MAINTENANCE IS - <br /> �___,_;___,S �.- � �� �,� ��- O INADEQUATE TO MEET TNESE REQUIREMENTS CONTRACTOR TO PROVIDE <br /> 460 � �,, , �� • FUTURE LOT 3 �� FENCING TO BE INSTALLED BY CADMAN ADDITIONAL BMP'S AT NO ADDITIONAL COST TO OWNER. .�� <br /> � 465 r,,, , J'p�,-- �' �,' STORM DRAIN CODE BMPS -� <br /> - <br /> EX. SDMH � 47p �' � � ;� �� CONSTRUCT TWO PIPE ANCHORS PER DETAIL ON '' <br /> � TOP 438.73 �P 475 �'""���1� '' , 'r ; SHEET C-10. '��' � <br /> IE 433.6 18" N (� _ � ; i � CL CLEARING LIMITS & HIGH VISIBILITY FENCE (D.O.E. BMP C103) . �,'`'� 1�� r� � <br /> I 480 i i � .� <br /> Q 484 ''� � i I �; � . <br /> Q x � DC DUST CONTROL (D.O.E. BMP C140) � � � �` � <br /> � � � � � HARDESON INFILTRATION E3ASIN/SWPPP NOTES: '� <br /> MU PS i i I 1. INFILTRATION BASIN TO BE USED AS TEMPORARY SEDIMENT POND. LOT 1 TO BE �* -�..,�� • <br /> z x � i / � ,� STABILIZED PRIOR TO OVER-EXCAVATING POND AND PLACEMENT OF SAND LAYER. IDS INTERCEPTOR SWALE W/ ROCK CHECK DAM (D.O.E. BMP C200) <br /> Q FENCING TO BE INSTALLED � � <br /> (� BY UNDERWOOD GARTLAND I i i <br /> i � � P 2. CONTRACTOR TO OVER-EXCAVATE A MINIMUM OF 5 FEET BELOW THE BASIN <br /> W I � i � Q BOTTOM AND REPLACE WITH 5 FEET OF WASHED CEMEX SAND. THE POND IP CATCH BASIN/INLET SEDIMENT PROTECTION <br /> Q x l � � � BOTTOM SHALL BE EVALUATED DURIf�IG CONSTRUCTION BY THE ENGINEER TO (WSDOT STD PLAN I-40.20-00 & D.O.E. BMP C220) <br /> i <br /> (� 1� o I i � � � DETERMINE IF ADDITIONAL EXCAVATION IS REQUIRED TO REMOVE ALL EXISTING <br /> � I x � (� �- i i O FILL MATERIAL. MU MULCH (D.O.E. BMP C121) <br /> = J `'� � I ' � � 3. PERMANENT SLOPES ADJACENT TO THE POND SHALL BE CUT INTO THE DENSE V o <br /> O `^� ��/ Z N <br /> � �,� G I NATIVE SOILS TO THE SOUTH AT 2H:1V FOR PERMANENT SLOPES AS SHOWN. ANY PS TEMPORARY & PERMANENT SEEDING (D.O.E. BMP C120) � N a? � <br /> PERMANENT SLOPES THAT ARE CUT INTO EXISTING FILL THAT WAS NOT <br /> `^�'^ � PREVIOUSLY COMPACTED TO ENGINEERED STANDARDS SHALL BE REMOVED, i� N � <br /> �Y, \ I PREPARED AND COMPACTED IN ACCORDANCE WITH THE SLOPE RECONSTRUCTION Z W � � o <br /> � DETAIL. S B S E D I M E N T B A S I N / T R A P (D.O.E. B M P C 2 4 1) Q E- .> � d; <br /> Q' POND GRADING TO BE I � Q p` o � <br /> � COORDINATED WITH MINING �' N <br /> RECLAMATION GRADING W °� � N <br /> � I SF TEMPORARY SILT FENCE (D.O.E. BMP C233) Q C� � � <br /> � + I � O .� � � <br /> � � � � � <br /> a � � a� � <br /> ID O0 Q � �j . <br /> � N <br /> aZ � <br /> a � <br /> 550 _ _ _ _ 55o EROSION CONTROL MONITORING PLAN <br /> 0 � <br /> � __ _ _ _ _ _ _ _ _ _ _ _ _ <br /> � _ . _ _ _. __ _ _ _ _ _ - _ __ _ _ - - - - - - -. -- - - - - - --- - - - - - - - 540 1. OBSERVE EROSION CONTROL MEASURES AT THE BEGINNING AND END <br /> X 540 _ _ _ __ _- - _ _ OF EACH DAY. REPAIR AND OR REPLACE AS NECESSARY TO ASSURE <br /> w _ _. � � _ _. . <br /> o _ _ PROPER FUNCTION. <br /> `�i 530 � _- 530 REVISIONS: APPD. <br /> o _ _ / _ _ _ 2. OBSERVE COLLECTION FACILITIES DURING PERIODS OF HEAVY <br /> o _ _ _ _ <br /> o _ _. / _ _ _ RAINFALL AND WET WEATHER CONDITIONS. <br /> ' x _ _ _ ___ _ /_ _ _ . __ _ _ ___ _ <br /> ? 520 / 520 , <br /> , __ _ _ _ _ _ _ <br /> 3. OBSERVE AND MONITOR STABILIZATION TECHNIQUES. MAKE REPAIRS <br /> m EXISIING GRADE � <br /> - AND/OR ALTERATIONS AS NECESSARY TO PREVENT EROSION. : <br /> �, _ _ _ _ _ _ _ _ _ _ _ i ___ _ <br /> g 510 _ 510 <br /> , i 4. OGY <br /> c..� / <br /> w / (D.O.E.)Y AND CITY OFSEVERE�TT (C.OTE.)DREQU REMENTOSF FOR L <br /> � _. _ _ � _ _ _ __ _ _ _ DISCHARGE OF STORMWATER. <br /> w 500 � POND GRADING TO BE 500 <br /> _ <br /> _ _ . _ _ � COORDINATED WITH MINING <br /> cn _ __ _ <br /> �� RECLAMATION GRADING <br /> w 490 _ _ __ _ _ _ 490 SWPPP BEST MANAGEMENT PRACTICES <br /> o _ � _ _ _ _ _ _ __ _ <br /> a � PAD ELEV 484.0 <br /> - -- - 2 THE LOCATION AND TYPE OF PROPOSED MEASURES FOR TEMPORARY EROSION <br /> o �� . AUGUST, 2017 <br /> � 480 � � 480 CONTROL SHALL BE AS FOLLOWS: <br /> DATE� <br /> o . JNM <br /> M / _ DESIGN� <br /> o _ _ _ _ __ __ _ _ : _ SEDIMENT BASIN - DETENTION POND TO BE UTILIZED AS DRAWN: CD . <br /> TEMPORARY SEDIMENT BASIN CHECKED: <br /> o _ _ _ <br /> � . <br /> 0 <br /> 470 <br /> 470 <br /> o _ _. _ _ __ _ _ _. MULCH AND HYDROSEED -- ALL EXPOSED SOIL UPON ATTAINMENT OF FINISH � <br /> o � REVISION <br /> o GRADE NUMBER: <br /> � _ __ _ / SILT FENCES - AT DOWNSLOPE SIDE OF AREAS TO BE CLEARED , <br /> � 460 _ 460 AND AT TOE OF FILL SLOPES <br /> _ <br /> � �. SCALE . <br /> �� w � <br /> "� 45o z s' wi�E BERM _ � _ _ _ _ _ _ _ _ _ _ 45o WET WEATHER GRADING & SWPPP NOTE <br /> � <br /> �� } TOP=435.0 <br /> Z �, � PROJECT NUMBER: <br /> � � FINISHED GRADE _ _ _ � _ _ : 1. FROM OCTOBER 1 TO APRIL 30 NO DENUDED SOIL AREAS AND SOIL STOCKPILES <br /> � <br /> � <br /> m m 440 w � 2 440 MAY REMAW EXPOSED FOR MORE THAN 2 DAYS AND NO MOR UG DXO003 <br /> T�, � 434.0 / : : FROM MAY 1 TO SEPTEMBER 30. I � PF�RO��� <br /> mm � <br /> 430 - - --- -' � 3 . � 430 $ L� / WING FILE: . <br /> -- --. . � - -_. ` i. _ � D RA <br /> _ � �`� _ _ � �. _ _ _ pua �5 vY�e., �T EC-009-IB-UGDX0003-FEDEX.dwg <br /> �Q _ � � _ � � _ <br /> � <br /> , � � <br /> �� ��---=---------- ----- --------------- -----------�� } t�c� .�.• <br /> �?� 420 420 ( n �c ��oszoN <br /> M r .......................�........................ ........... ... .......... . . ...... .. ........ ..... : . ..... .... .......... ... .................. .............. .. .. ... ................ <br /> .... ....... �..................... <br /> ....... .......... ....�...... <br /> ...........�............. ....... <br /> � PtJ�/�G'�t�R�tS <br /> �� _ _ _ _ , iD��AR7"A9�� <br /> SHEET NO. <br /> 0 o BOTTOM .OF.JNFILTRATION; BASW. ..... 5 FT..DEPTH .. CEAN . � wa��t . <br /> N N CALL ELEVATION = 427:0....... PIT SAND <br /> �� _ <br /> 2 B U S I N E S S DAYS 410 410 � �Quar�o vRaoa ro sraara�a� <br /> �� A PU�LIC WOi2KS PERMiY E5 <br /> 0O CO BEFORE YOU DIG 0+00 1+00 2+00 3+00 3+70 , ��'��� - - -� �rar consr�urnor� or� -r►ias <br /> __ � <br /> ai � � PRO]EGT I5 6AidDITItlP1RL P€R <br /> �o FOR UTILITY LOCATE � '��,��� ��"�E"T��PR�����,"� oF � 2 <br /> SECTIUN A-A: HARDESON INFILTRATION BASIN ��T�S <br /> o �, 1-800-424-5555 1 = 20 HORIZONTAL & VERTICAL <br /> � » > <br /> � � � � B�ENI53U�D. <br /> a� PERMIY FOR C0�5'TR!lGTS9A1 Nda <br /> ��77`N EFdGS E� . <br />