My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 719-80
>
Ordinances
>
Ordinance 719-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 11:26:21 AM
Creation date
9/4/2018 11:26:19 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
719-80
Date
8/6/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M I <br /> b. curbs, gutters and sidewalk on north side <br /> and street repairs on 39th <br /> (Estimated Cost: $14, 568) <br /> 7. Complete any 1979 or 1980 Port Gardner Neighborhood <br /> Projects that were approved by the City Council in <br /> 1979 and 1980 but cannot be completed with 1979 or <br /> 1980 Port Gardner Block Grant Funds up to a maximum <br /> of $15, 000 . <br /> 8. Extruded cement concrete curbs on both sides of Norton <br /> Bridge (3300 Block) . <br /> (Estimated Cost: $3, 135) <br /> 9. Completion of Item #6 above, if not completed with <br /> budgeted $25, 000 . <br /> 10. Sidewalk reconstruction on Gedney and Wall in the <br /> following priority: <br /> a. Sidewalk reconstruction on west side of Gedney <br /> (Estimated Cost: $1, 350) <br /> b. Sidewalk reconstruction on Wall from Nassau <br /> to Bond <br /> (Estimated Cost: $1, 740) <br /> C. Northeast Everett Neighborhood Improvements: <br /> 1. Curbs, gutters and drainage on NW 140 feet on 17th <br /> Street between Cedar and Pine. <br /> (Estimated Cost: $3, 213) <br /> 2. Curbs, gutters drainage and sidewalk on the west side <br /> of Pine Street between 9th and 10th and a 22 foot <br /> asphalt roadbed along the Pine Street right-of-way <br /> between 9th and 10th. <br /> (Estimated Cost: $54, 777) <br /> 3. Repair of Wiggums Hollow Park <br /> (Estimated Cost: $10, 000) <br /> 4. Curbs, gutters, drainage and sidewalks on the east and <br /> west sides of the 1300 and 1400 blocks of Maple and an <br /> asphalt overlay of the existing roadbed in the 1300 <br /> and 1400 blocks of Maple. <br /> (Estimated Cost: $72, 954) <br /> 5. Sidewalk on the west side of Walnut from 9th to Butler <br /> (Estimated Cost: $4 , 108) <br /> 6 . Sidewalk on the NW 140 feet of 17th Street between <br /> Cedar and Pine <br /> (Estimated Cost: $2, 000) <br /> D. Lowell Neighborhood Improvements - (as amended by Lowell <br /> residents December 19, 1979) : <br /> 1. Planning Study of Lowell <br /> (Estimated Cost: $20, 000) <br /> (6) <br />
The URL can be used to link to this page
Your browser does not support the video tag.