My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 715-80
>
Ordinances
>
Ordinance 715-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 11:53:32 AM
Creation date
9/4/2018 11:53:30 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
715-80
Date
7/30/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 1 - $701/unit of a mobile home park. <br /> 2 - $697/unit of a multiple dwelling structure. <br /> 3 - Other major structures: Responsible Official shall estimate <br /> peak and average flows from anticipated use and establish a <br /> 4 fee based on $716 per gpm of average flows plus $1,269 per <br /> gpm of peak flows; provided that if the property on which <br /> 5 the major structure is to be constructed has been assessed <br /> for the cost of the Southwest interceptor, then the fee to be <br /> 6 charged shall be: <br /> 7 - $256/unit of a mobile home park. <br /> 8 - $219/unit of a multiple dwelling structure. <br /> 9 - Other major structures: Responsible Official shall <br /> estimate peak and average flows from anticipated use <br /> 10 and establish a fee based on $716 per gpm of average <br /> flows plus $326 per gpm of peak flows. <br /> 11 <br /> 12 <br /> 13 <br /> 14 <br /> %114,72°4111$4.4.."'"R <br /> 15 <br /> ATTEST: <br /> 16 <br /> 17 <br /> CITY CLERK <br /> 18 <br /> 19 Passed: 7-30—P0 <br /> 20 Valid: 8- /-fo <br /> 21 Published: ,90 <br /> 22 <br /> 23 <br /> 24 <br /> 25 <br /> 26 <br /> 27 <br /> 28 <br /> 29 <br /> 30 <br /> 31 <br /> 32 <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.