|
GENERAL NOTES
<br /> 1.WORK SHOWN ON THIS SHEET IS SPLIT BETWEEN THE
<br /> HOSPITAL TOWER AND CENTRAL PLANT PROJECTS.WORK W 2
<br /> SHOWN IN LIGHT LINE WEIGHT ON THIS SHEET TO BE
<br /> PROVIDED IN THE OTHER PROJECT.(ie.UGHT UNE WEIGHT
<br /> ON TOWER DRAWING TO BE PROVIDED IN CUP PROJECT.) U U
<br /> Z
<br /> 2.ALL FAULT CURRENTS SHOWN REPRESENT SIMULATED 30
<br /> BOLTED FAULTS UNLESS OTHERWISE NOTED.SEE FLAG NOTE
<br /> FOR EXCEPTION.
<br /> 3.REFER TO SHEET E8.02 FOR FEEDER SCHEDULE. 0 iv(V
<br /> FLAG NOTES
<br /> REFER TO SHEET E8.05 A,-,....,_ .... --....
<br /> REFER1 CONTINUATION SHEET E8.13 FOR CONTINUATION
<br /> FOR
<br /> R CONNTNOT USED.
<br /> ,-SWITCHES,METER EQUIPMENT,AND CABLES FOR I/ '''' 0 .iiiii!)
<br /> l
<br /> I LS CR NORMAL OPT EQ LS CR NORMAL EQ CONNECTIONS BETWEEN UTILITY COMPANY EQUIPMENT ARE
<br /> PROVIDED BY ELECTRIC UTIUTY COMPANY. """ "
<br /> A,8
<br /> 8 5 i>.PROVIDE CONDUIT TO PUD SWITCH ROOM LOCATED IN
<br /> V
<br /> PARKING GARAGE,AND PROVIDE CONDUCTORS TO REACH t e") >
<br /> UTILITY COMPANY SWITCHES PER UTILITY COMPANY
<br /> A 0 B 2000/2240/2500 KVA, 2000/2240/2500 KVA, INSTALLATION REQUIREMENTS. TERMINATE CONDUCTORS AT
<br /> ' • KNAN/KNAN-65/KNAF KNAN/KNAN-65/KNAF UTILITY COMPANY SWITCHES PER UTILITY COMPANY
<br /> A N.C. N.O. K 12.7KV:480Y 277 12.7KV:480Y/277 ^
<br /> _ 5.759 Z
<br /> PM n REQUIREMENTS. 4,:•.:.,...„,:„:„::„.
<br /> 30,4W
<br /> 30,4W,5.75%Z1600AF 1600AF 800AF 1600AF 1600AF 2000AF 1600AF AF600AS 600AS 1000AT 1000AT 225ATtr'1600AT 1200AT cF 2000AT 1000AT® 1888AT
<br /> 150AF4 PROVIDE SPARE RACEWAY SAME SIZE AS FEEDER RACEWAY
<br /> 1600AF 1600AF 800AF cF 1600AF€X"1888O 2000AF cF 1600AF 1600AF T /1000AT 1000AT 225AT0-( 1000AT 2000ATa( 1000AT 1000AT A _ ��• ��E!U
<br /> •SA • • //° `\W ../ i ! 0-13000AF Q 7 7 PROVIDE KEY INTERLOCK TO PREVENT SIMULTANEOUS
<br /> II " fF - ' 3000AT CLOSURE OF BOTH SWITCHES.KEY INTERLOCK SHALL
<br /> 3000AF 7 7 e 150AS •oma PREVENT ACCESS TO PRIMARY FUSE COMPARTMENT WHEN EVERETT,WASHINGTON
<br /> � �► 3000AT N 600AS. 150AF N EITHER PRIMARY SWITCH IS CLOSED.
<br /> ,64
<br /> N.O. K • 2( G
<br /> 4 ©NOT USED. v N
<br /> GA _ �� 0
<br /> = N.C.
<br /> _e?'"fl_
<br /> A B© _ _ A BREAKER TO BE SQUARE D TYPE NW-L MASTERPACT. ,,ISL:
<br /> NUS-H3 HOSPITAL NORMAL POWER NUS-H4 HOSPITAL NORMAL POWER ®TRANSFORMER TO BE EQUIPPED WITH PROVISIONS FOR
<br /> 3000A BUS(ROOF LEVEL-NORTH) 3000A BUS(LEVEL 4-SOUTH) FUTURE FANS TO PROVIDE KNAF RATING.
<br /> 12.47kV//480Y/277V 30 4W 12.47kW/480Y/277V 30 4W
<br /> 65,000 AIC 0 480V 65,000 AIC 0 480V C`J zG F(--)
<br /> SERVICE ENTRANCE RATED SERVICE ENTRANCE RATED
<br /> GARAGED SEE SHEET E6.00BTO SMSB-G IN PARKING "'T ECS
<br /> FOR PATHWAY ROUTING,AND
<br /> -.4111 SHEET E8.20 FOR
<br /> Do- B B .41B B CONTINUATION. MEDIUM VOLTAGE FEEDER SCHEDULE AnNtectare/Plarr,ing/We.,De0gn
<br /> REFER TO SHEET E8.08 �TO FIRE PUMP. Portland Seattle Los Angeles WasW...DC
<br /> FOR CONTINUATION r ,SEE SHEET E8.02 FOR CONTINUATION. REFER TO SHEET E8.02 COPPER CONDUCTORS
<br /> FOR CONTINUATION FEEDER FEEDER 925 Fourth Ave.,Suite 2400
<br /> ✓ TYPE RACEWAY WIRE AMPACITY Seattle,Washington 98104
<br /> LS CR NORMAL EQ LS CR NORMAL/OPT EQ " (3)#750kcmil 15KV,MV-105 447
<br /> ^✓ �, ^✓ ^� ✓ A4M4 133%EPR,(1)#4/OG 600V XHHW (NOTE 1)
<br /> r �+,, A 6 (PH)206 623 9414
<br /> • 8 � g -� (FAX)206 623 7868
<br /> • 5 0 /5\ B 5" (3)#350kcmil 15KV,MV-105 415
<br /> A 0 B V 3750/4200/4688KVA, 3750/4200/4688KVA, 133%EPR,(1)WOG 600V XHHW
<br /> 0 • K K KNAN/KNAN/277KNAF 3750/200/688KM,
<br /> - Consultants
<br /> /(� N.C. N.O.�� 12.7KV:480Y/277 " MV 105
<br /> 12.7KV:480Y/277 CH-' *1888Z
<br /> n /'� /,� /^� C4 (3);�4/0 15KV, 315 LIFE SAFETY
<br /> J30,4W,5.75%Z = 30,4W,5.75%Z1600AF 800AF 1600AF 1600AF •+`3200AF 1600AF%IOW
<br /> 133%EPR,(1)11/OG 600V XHHW
<br /> 600AS• +600AS 0---‘
<br /> n n nc),.
<br /> 250AF • • T c 1000AT 225AT�1 1600AT 1200AT�� 3000AT`J-1 1200AT /;� ROLF JENSEN&ASSCITES
<br /> cF I 1600AF cF 1600AF 800AF cF 1600AFa",,,1600ATK,
<br /> 1600AF cF 3200AF 1600AFOt
<br /> 1600AF 1 / / 2E 2 4" (3)350kcil 5KV,MV-105 /4 0 19125 North Creek Parkway Ste 120
<br /> CV
<br /> © O-( 1000AT 1000AT0-( 225AT 1600AT3000AT 1000AT 1000AT SA • • • ��- }}l4.! () 13393PR, 1)#1/OG,600V XHHW IN E4 Bothel,Washington80® �j _ ill
<br /> SA • ., T `Y `Y
<br /> • II 5000AF
<br /> AF -60© 5000AT 7 7 7 3E1 3 4" O
<br /> 5000 Q () 3 350kcmil 5KV MV-105 4 810 CIVIL ENGINEER
<br /> �� 5000AT 7 7 7 .600AS 250AF N 1337EPR,(1)#2/0G,600V XHHW IN EA. (NOTE 1)
<br /> -off N
<br /> Magnusson K emencic Associates
<br /> K ° © /� G 3E2 (3)4" (3)350kcmil 5KV,MV-105 1301 Fifth Avenue,Suite 3200
<br /> 2( Y _ G y N.C. ZY 133%EPR,(1);2/OG,600V XHHW IN EA. (NOTE Seattle,Washington 98101-2699
<br /> = A N.O. B
<br /> " (3)500kcmil 5KV,MV-105 470 LANDSCAPE ARCHITECT
<br /> NUS-H1 HOSPITAL NORMAL POWER A 5000A BUS(LEVEL B-SOUTH)NUS-H2 HOSPITAL NORMAL POWER F 5 133%EPR,(1)#1/OG,600V XHHW (NOTE 2) Site Workshop
<br /> 5000A BUS(LEVEL B NORTH) 12.47kV//480Y/277V 30 4W 927 Post Alley
<br /> 100,
<br /> 1DD,0000 00 A480Y/277V 30 4W AIC®480V 100,000 AIC®480V F1 5" (3)500kcmil 5KV 133%EPR,(1);�1/OG,600V XHHW 3488 Seattle,MV-105 Washington 98101
<br /> SERVICE ENTRANCE RATED SERVICE ENTRANCE RATED (NOTE 1)
<br /> • l STRUCTURAL ENGINEER
<br /> I I I NOTE 1: FEEDER AMPACITY BASED ON DUCT BANK STEADY STATE Magnusson Klemencic Associates
<br /> I I , J THERMAL/AMPACITY ANALYSIS. 1301 Fifth Avenue,Suite 3200
<br /> NOTE 2: FEEDER AMPACITY BASED ON ONE CIRCUIT IN DUCT BANK Seattle,Washington 98101-2699
<br /> PER NEC TABLE 310.77.
<br /> MECHANICAL ENGINEER
<br /> CDi Engineers
<br /> 4200 194th Street S.W,Suite200 ==
<br /> _ Lynnwood,Washington 98036
<br /> HOSPITAL CENTRAL PLANT ELECTRICAL ENGINEER
<br /> B B -41 PROTECTIVE DEVICE SCHEDULE SPAING
<br /> 720RO0ve Way,Suite 1400
<br /> a 0 SYMBOL ANSI RELAY FUNCTIONS RELAY TYPE(SEE PROTECTION TYPE
<br /> NOTE 1) Seattle,Washington 98101-1853
<br /> Gio25,27,32,40,48,49,50,50N,51,51N,59,59N, SEL 300G GENERATOR PROTECTION
<br /> 60,64,67,81,87 GENERAL CONTRACTOR
<br /> 4 6 25,27,32,50,SON,51,51N,59,67,67N,79,81, SEL 351A FEEDER PROTECTION M.A.Mortenson Company
<br /> METERING,MONITORING 14719 N.E.29th Place
<br /> r-c-
<br /> 'V
<br /> 50,50N,51,51N,87T SEL 587 TRANSFORMER PROTECTION Bellevue,Washington 98007
<br /> I
<br /> I 1 r-c--- ® 50,50N,51,51N,87B SEL 587Z BUSS PROTECTION
<br /> , Revisions
<br /> O
<br /> 0TYPICAL ANSI FUNCTION LOCKOUT RELAY
<br /> B3 TYPICAL ANSI FUNCTION PRESSURE SWITCH RELAY DOCUMENT RELEASE 09 11/03/08
<br /> I1 1 1 1 I NOTE 1: RELAY TYPES ARE SCHWEITZER ENGINEERING LABORATORY(SEL)MODEL NUMBERS.USED FOR DESIGN RFI 167 12/01/06
<br /> BASIS ONLY.CONTRACTOR SHALL MODIFY AS NECESSARY IF SEL DEVICES ARE NOT USED.
<br /> RFI 305 01/15/09
<br /> I REFER TO SHEET E8.30 OF CUP PACKAGE DOCUMENT RELEASE 11 02/09/09
<br /> TOWER"B" 600AF �300AF CUP"A" 300AF CUP"B" 600AF TOWER"A" (CUP POWER RISER)FOR CONTINUATION
<br /> 600AS 600AS 600AS 1 600AS UL LISTED LESS-FLAMMABLE FLUID FILLED DOCUMENT RELEASE 13 03/09/09
<br /> /'�`� N.C. /""'� N.C.° A N.C.+ N.C. (ENVIROTEMP)
<br /> (ENVIROTEMP) �
<br /> • • • • • • • TYPICAL ALL NORMAL POWER UNIT LS CHWP-5 CH-1 P1NHDP1 EQ1 /`�\DR17/ADDENDUM 4 05/15/09
<br /> SUBSTATIONS
<br /> T , 5 DOC RELEASE 21 09/14/09
<br /> SERVICE DISCONNECT ,.- _ L A WORK PROPOSAL 10 10/23/09
<br /> SWITCHES SERVICE DISCONNECT
<br /> 15KV,3P A �► A � A A SWITCHES I
<br /> D C q 15KV,3P g
<br /> C AS 15 07/22/10
<br /> 132) I CLOSEOUT DRAWINGS 04/02/12
<br /> • 2500/2800/3125KVA, PM
<br /> KNAN/KNAN-65/KNAF SPARE SPACE SPACE SPARE
<br /> (2)6"ROA . 1 _ 12.7KV:480Y/277 pM + + + � ST ,� ST ST
<br /> ` , - 3�,4W,5.75%Z el 800AF 2000AF 1600AF cF °my (D__( 800AF cF °800AF (D__( 800AF cF °1600AF cF °4000AF
<br /> [ , , ETO QUIPMENTGON�SITE COMPANY ^ T c= 4 4 \225AT 4 450AT 4 00ATp , T
<br /> 4 1600AT 4 2500AT
<br /> FOR FUTURE SERVICE TOSA • 1 1 •
<br /> EXISTING COLBY CAMPUS19 488 > ° © 4000AT 4000AF S>
<br /> BUILDINGS WEST OF HOSPITAL
<br /> " 600AS �`�o
<br /> TOWER.REFER TO SITE PLAN (1)6 RO � � I 600AS 200AF
<br /> SHEET E1.02 d < , Q .. -- Q A
<br /> •• N
<br /> 0 A
<br /> TO EXISTING UTILITY COMPANY N.O.V:C5 4 A N.C. 2r Drawing Title
<br /> EQUIPMENT ON SITE T
<br /> /� FUTURE SWITCHGEAR SECTION PRIMARY POWER
<br /> T 7 /�\ NUS-CPI C.U.P NORMAL POWER
<br /> 4000A BUS(CENTRAL UTILITY PLANT)
<br /> 12470V-480Y/277V 30,4W RISER DIAGRAM
<br /> J 65,000 AIC 0 480V REFER TO SHEET E8.30 OF CUP PACKAGE NORMAL SYSTEM
<br /> SERVICE ENTRANCE RATED (CUP POWER RISER)FOR CONTINUATION
<br /> 1 1 I J
<br /> P.U.D.SW#4 P.U.D.SW#5 P.U.D.SW#6 � CH-5 CHWP, T ,-2 CH-3 CH-4 EQ2
<br /> P.U.D.PRIMARY P.U.D.PRIMARY P.U.D.PRIMARY , J
<br /> T ,
<br /> PM1 METER EQUIPMENT PM2 METER EQUIPMENT P METER EQUIPMENT TO CUP FIRE PUMP
<br /> METER#127260 METER#129973 METER#129972 SEE SHEET E8.30 FOR
<br /> CONTINUATION
<br /> J V1
<br /> m , 1 / \ I
<br /> C C 2500/2800/3125KVA,
<br /> I SPACE SPARE SPARE
<br /> 1-EQUIPMENT
<br /> 12.7KV:400Y/277 CD-'
<br /> M /\ /\ ST
<br /> m LOCATED IN
<br /> P.U.D. I 30,4W,5.75%Z 2000AF cF 1600AF cF 1600AF , °800AF (,_(.1600AF cF 1600AF cF °1600AF cF 1600AF
<br /> cd
<br /> � �1400AT � 350AT 1400AT� 1400AT � 1200AT
<br /> ET. SWITCH T �f j \q/ �/
<br /> ROOM AT / \ `I' T T �y �{'
<br /> N PARKING °SA - --• • • <<'-'>>
<br /> 4000AF
<br /> GARAGE 13,948 > 1 © 4000AF `S�
<br /> A 600AS .,99
<br /> 600AS• 200AF Date: NOVEMBER 03,2008
<br /> N
<br /> K ° Azy
<br /> A Job No: S80613.02
<br /> o G6 . J N.C.. N.O. � Drawn By: MJG
<br /> N LP.U.D.SW#1 \ P.U.D.SW#2 � P.U.D.SW#3 A B A©k A A /'\ A\ NUS-CP2 C.U.P NORMAL POWER FUTURE SWITCHGEAR SECTION Checked B. MD)
<br /> UTILITY#2 UTILITY#3 UTILITY#1 A4000A BUS(CENTRAL UTILITY PLANT) UL LISTED LESS-FLAMMABLE FLUID FILLED
<br /> NORTON FEEDER DELTA FEEDER 10TH ST.FEEDER ' 124700-480Y/277V 30,4W (ENVIROTEMP)
<br /> 12.47KV 12.47KV 12.47KV 65,000 AIC 0 480A TYPICAL ALL NORMAL POWER UNIT Drawing No.
<br /> 3 CKT 12-589 CKT 12-3656 CKT 12-298 SERVICE ENTRANCE RATED SUBSTATIONS
<br /> 0
<br /> 0
<br /> 0
<br /> co
<br /> w
<br /> I
<br /> in
<br /> 0
<br /> PRIMARY POWER RISER DIAGRAM-NORMAL SYSTEM E8.00
<br /> U
<br /> 0 0
<br /> rM FOR REFERENCE ONLY
<br /> EiE
<br /> 1700 136"St-PGMC 2nd Floor Surgery-B1406-017
<br />
|