Laserfiche WebLink
2.1.7 Element 7: Protect Drain Inlets <br /> All storm drain inlets and culverts made operable during construction shall be protected to <br /> prevent unfiltered or untreated water from entering the drainage conveyance system. The first <br /> priority, however, will be to keep all access roads clean of sediment and keep street wash water <br /> from entering storm drains until treatment can be provided. Inlet protection will be implemented <br /> for all drainage inlets and culverts that could potentialty be impacted by sediment-laden runoff <br /> on and near the project site. The following inlet protection measures will be applied on this <br /> project: <br /> Applicable BMPs: <br /> • BMP C220: Storm Drain Inlet Protection <br /> Installation Schedules: Start of project and replaced as needed and at start of wet season. <br /> Inspection and Maintenance plan: Responsible staff to make weekly site walks and inspections <br /> to identify deficiencies in onsite BMPs and anticipate potential problems and remedies. <br /> Responsible Staff: Identified Certified Erosion and Sediment Control Lead in Section 3 of this <br /> SWPPP. <br /> Page � 14 <br />